United States i
Ennchment Corporation 6
2 Democracy Center 6903 Rockledge Dove l
Bethesda. MD 20817 Tel. (301) S64-3200 t
Puited States j
Enrichenent Coqmration March 17,1997 Mr. Robert C. Pierson SERIAL: GDP 97-039 Chief, Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gaseous Diffusion Plant (PORTS)
Docket Nos. 70-7002 Compliance Plan Issh-C1/X1, List of Open United States Enrichment Corporation (USEC)
Commitments to the bepartment of Energy (DOE), Supplement 1
Dear Mr. Pierson:
This letter provides a supplemental report of open USEC commitments to DOE as committed in our letter dated March 1,1997 (reference USEC letter GDP 97-0023) The enclosed information supplements Enclosure 2 of the referenced letter and contains information that was electronically unavailable during the initial downloading of data from the Business Priority System (BPS).
The enclosed lists eight (8) Priority I commitments and three (3) Priority 2 commitments. Of these commitments, the due date for one has been extended due to inadequate evidence to support closure as discussed further below.
Re-onened Commitment:
In response to DOE violation 70 t002/96-08-03, USEC committed to train Organizational, Group, Sectional, and Front Line Managers on the use of procedures, vice policies, to direct work activities by February 28,1997. This commitment was closed by USEC on February 28,1997. Ilowever, USEC re-opened the commitment on March 3,1997 when the evidence was determined inadequate to support closure. This commitment has been extended to March 24,1997, because additional time is needed to ensure actions are completed and appropriate evidence collected.
1 {
NRC FILE CENTER COPY Nry 9 0061 9703210257 970317 PDR ADOCK 07007002 C
pop I
Offices in Paducah. Kentucky Portsmouth, Ohio Washington, DC
L L
L i
Mr. Robert C. Pierson March 17,1997 GDP 97-039 Page 2
-If you have any questions concerning this submittal please Russ Wells, USEC Senior Regulatory Engineer, at (301) 564-3245. There are no new commitments contained in this report.
Sincerely,
-j j
100 Robert L. Woolley Nuclear Regulatory Assurance and Policy Manager i
Enclosure cc:
. NRC Region III Office NRC Resident Inspector - PGL)P l
l NRC Resident inspector - PORTS DOE Regulatory Oversight Manager i
i l
l
L
~
SUPPLEMENTAL LIST OF PORTSM3UTH OPEN REGULATORY COMMITMENTS MAXE PRIOR TO C3/03/97 Regulatory Finding Scheduled issue ID Engineer Number Issue Title Description Date Level UX9711672 Raleigh JJ Response to improper Handling of UF6 Organizational, Group, Sectional, and Front Line Managers will be 02/28/97 1
NOV 96-08-03 Cylinders trained on the use of procedures, vice policies, to direct work activities. This action will be completed by February 28,1997.
' NOTE: This action is scheduled for completion by 03/24/97.
UX9711672 Raleigh JJ Response to improper Handling of UF6 USEC is changing and strengthening the Command and Control 03/03/97 1
NOV 96-08-03 Cylinders process to ensure PSS directives are implemented in the field (i.e.,
structure, training, procedures, and communications). This effort will include: an evaluation of management authority, changing reporting relationships to facilitate improved information flow, broader responsibilities, and improving communications through the proper use of Daily Operating Instructions and long Term Orders.
3 2 NOTE: This action was completed on 03/03/97.
UX97I3774 Blackston C Response to Inadequate Procedure Guidance for Provide response to the Regulator regarding NOD 96-07-01.
03/12/97 1
NOV 96-07-01 Design Change Process
' NOTE: USEC letter to DOE dated March 11,1997, indicated that a response to this NOD was not required since the due date for this response was after the date NRC assumed regulatory oversight.
UX9711631 Raleigh JJ Response to improper Movement of UF6 An upgrade to the Conduct of Operations initiative in the Quality of 03/31/97 1
NOV 96-11-02 Cylinder with Straddle Carrier Operations Plan (QOOP) is being developed, including self-assessment.
UX9711631 Raleigh JJ Response to Improper Movement of UF6 USEC will train Operations personnel (including UMHs) on the N/14/97 1
NOV %-11-02 Cylinder with Straddle Carrier
- Ixssons Ixarned" from this event.
UX9711672 Raleigh JJ Response to Improper Handling of UF6 USEC will conduct training of planners to emphasize the need to 04/30/97 1
NOV 96-08-03 Cylinders thoroughly evaluate jobs when planning.
UX9711672 Raleigh JJ Response to improper Handling of UF6 USEC will train Planners, PSSs, and Operations personnel on the M/30/97 1
NOV 96-08-03 Cylinders lessons Learned from this event.
UX9711672 Raleigh JJ Response to improper Handling of UF6 USEC will develop a proceduralized process (checklist / rules) for 05/13/97 1
NOV 96-08-03 Cylinders Planners such that the 10 CFR 76.68 screening process is considered when evaluating work activities not covered by procedures or work instructions.
~
SUPPLEMENTAL LIST CF PORTSMOUTH OPEN UGULATO2Y COMMITMENTS MADE PRIOR TO 63/03/97 Regulatory Hnding Scheduled issue ID Engineer Number Issue Title Description Date,
Level UX97I3775 Holliday RT DOE letter to Request to Maintain the X-326 Prepare response to the remamder of the DOE comments 2
USEC dated OSRs/X-705 TSRs and TRs regarding the X-326 request to maintain OSRs after 03/03/97.
2/27/97 UX9713776 Blackston C DOE letter to PORTS Disposition of SAR20, Rv 1, The remaining items identified in USEC's request (i.e., heaters, 2
USEC dated SAR21 and SAR25 long term buffering of cells) is included in superseding 2/27/97 documentation prior to taking the action to document the removal of SAR20, SAR21 and SAR25 from the authorization basis.
UX9713776 Blackston C DOE letter to PORTS Disposition of SAR20, Rv 1, Review NCS documentation for references to the suspension of 2
USEC dated SAR21 and SAR25 SAR20, SAR21, and SAR25.
2/27/97
?- - -.