'Af Telephone (412) 393-6000 Nuclear Group P.O. Box 4 Shippingport, PA 15077-0004 January 2, 1986 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Eequest No. 121 Gentlemen:
Enclosed are:
1.
Three (3) originals and thirty-seven (37) copies of an Application for Amendment to our Operating License to permit a
one-time extension of the next visual inspection of snubbers to the fifth refueling outage.
2.
Forty (40) copies of documents designated Attachments A and B
which set forth the change in Tecr >tical Specifications and its no significant hazards determination.
The proposed change permits a
one-time extension of the next visual inspection of snubbers to the fifth refueling outage.
This extension is requested to avoid a
plant shutdown solely for the purpose of performing the necessary snubber visual inspections.
Our fifth refueling outage is tentatively scheduled to begin on May 2, 1986 which is within four weeks of the time period specified in our technical specifications for performing this next visual inspection.
A plant shutdown would be necessary to perform the visual inspections since the snubbers inside containment are considered inaccessible during power operation due to the subatmospheric containment design at BVPS Unit 1.
Additionally, the inspection itself is expected to take approximately two weeks to perform since more than 200 snubbers would have to be inspected and in many cases there is a need to erect scaffolding to perform these inspections.
As of the date of this
- request, there has not been an outage of sufficient duration to ggil perform the visual inspections in accordance with the technical specification time period and no outages are scheduled.
gg) 8601150005 860102 PDR ADOCK 05000334
$09t O (g4gggg p
PDR Q Y wfensus-YlSO 00 h
m Beavar Vallcy Powar Station, Unit No. 1 Dock 3t No. 50-334, Licence No. DPR-66 Proposed Operating License Change Request No. 121 Page 2 A
check in the amount of $150.00 is attached for payment of the license amendment application fee in accordance with 10CFR170.
Very truly yours, Vice resident, Nuclear Attachment cc:
Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P.O. Box 2063 Harrisburg, PA 17120