3F0186-11, Forwards Rev 0 to Process Control Program, Reflecting Change from Chem-Nuclear Solidification Sys to Bartlett Nuclear Sys.Comments Requested by 860314
| ML20137A155 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/10/1986 |
| From: | Westafer G FLORIDA POWER CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137A160 | List: |
| References | |
| 3F0186-11, 3F186-11, NUDOCS 8601140199 | |
| Download: ML20137A155 (1) | |
Text
.. e o
ese e
e*
{O g
'i
,e ee.
Power C O R PO R ATIO N January 10, 1986 3F0186-11 Director of Reactor Regulation Attention:
Mr. John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Process Control Program
Dear Sir:
Attached please find the latest revision of Florida Power Corporation's (FPC)
Process Control Program (PCP).
This revision is substantially different from the past PCP as FPC has changed from a chem Nuclear Solidification System to a Bartlett Nuclear System.
This is provided to you for information, as NRC
' approval of this document is not required.
We anticipate using this new PCP within 60 days, thus any comments or suggestions you have should be offered before March 14, 1986.
Sincerely,
//
Mr. G. R. Westafe Manager, Nuclear Operations Licensing and Fuel Management PGH/feb 8601140199 860110 PDR ADOCK 05000302 Attachment p
PDR xc:
Mr. Leo Higginbotham, Chief Low-Level Waste Licensing Branch j
Division of Waste Management U.S. Nuclear Regulatory Commission CP)
Washington, DC 20555 Dr. J. Nelson Grace
) \\
Regional Administrator, Region II j
office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 GEN ERAL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, st. Petersburg, Florida 33733 e 813-866-5151