ML20136J479

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of Shroud Head Bolt Assembly Failures at Peach Bottom Atomic Station Unit 3, Prepared by Ge.Metallurgical Exam of Failed Bolt Revealed IGSCC Cause of Failure
Date released: 05/29/2020 Download: ML20136J479


Safety Evaluation of Shroud Head Bolt Assembly Failures at Peach Bottom Atomic Station,Unit 3.
ML20136J495
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/20/1985
From: Biglieri N, Legate R, Ranganath S
GENERAL ELECTRIC CO.
To:
References
Download: ML20136J495 (25)
Forwards Safety Evaluation of Shroud Head Bolt Assembly Failures at Peach Bottom Atomic Station Unit 3, Prepared by Ge.Metallurgical Exam of Failed Bolt Revealed IGSCC Cause of Failure
ML20136J477
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/07/1986
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: MULLER D R
Office of Nuclear Reactor Regulation
References
Download: ML20136J477 (2)