ML20136J447

From kanterella
Jump to navigation Jump to search
Advises of Change in Facility Organization,Effective 851218. Duties of Level 1 Manager Combined W/Level 2.No Tech Spec Change Required as Level 1 Manager Position Optional
ML20136J447
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 01/07/1986
From: Darmitzel R
GENERAL ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8601130382
Download: ML20136J447 (1)


Text

__

GENERAL $ ELECTRIC NUCLEAR ENERGY BUSINESS OPERATIONS GENERAL ELECTRIC COMPANY e VALLECTOS NUCLEAR CENTER e PLEASANTON, CAUFORNIA 94566 January 7, 1986 Dr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555

References:

1) License R-33, Docket 50-73.
2) General Electric Nuclear Test Reactor Safety Analysis Report, NEDO-12727; April, 1981.

Dear Dr.-Denton:

Pursuant to Technical Specification 6.5.2(b)(1) of License R-33, Ceperal Electric wishes to notify you of a change in the facility organfzation for the General Electric Nuclear Test Reactor (NTR).

Effective December 18, 1985, the duties of the Level 1 manager have been combined with those of the Level 2 manager. No change in the NTR Technical

. Specifications is required as the Level 1 manager position is optional (Technical Specification 6.1.2.3).

The Level 2 manager title is the Manager, Nuclear Test Reactor.

(The previous Level 2 title was the Manager, Engineering and Support Services.)

Sincerely, j:

R. W. Darmitzol, Manager Irradiation Processing Operation (415) 862-4344

/ca cc:' USNRC-Region V 8601130392 960107 7' PDR-ADOCM 00000073 i $

H PDR:

l

.