ML20136J330

From kanterella
Jump to navigation Jump to search

Amend 99 to License DPR-24,rescinding Requirements of Commission 791130 Confirmatory Order for Mod of License & 800103 Order Modifying Confirmatory Order Re Primary Coolant Activity primary-to-secondary Leakage
ML20136J330
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/04/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20136J333 List:
References
TAC-56868, NUDOCS 8511250345
Download: ML20136J330 (2)


Text

'

e gk# AI

),,

UNITED STATES

,8 NUCLEAR REGULATORY COMMISSION o

t.

E WASHINGTON. D. C. 20555 WISCONSIN ELECTRIC POWER COMPAN7 DOCKET NO. 50-266 POINT BEACH NUCLEAR PLANT, UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 99 License No. DPR-24 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (thelicensee)datedJanuary 11, 19535, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

DD11200345 951104 PDR ADOCK 05000266 P

PDR

2-2.

Accordingly, Facility Operating License No. DPR-24 is amended by rescinding the requirements of the Commission's Confirmatory Order for Modification of license dated November 30, 1979, and the Order Modifying Confirmatory Order dated January 3,1980, which had modified Facility Operating License No. DPR-24.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance: November 4, 1985

-.---7----

+g-

--,----ym,

. -