ML20136J009

From kanterella
Jump to navigation Jump to search

Requests Assistance in Reviewing Util 850722 Amend 6 Changes to Fire Protection Program.Completion of Safety Evaluation & SALP Input Requested by 860131
ML20136J009
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/14/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
TAC-59351, TAC-59352, NUDOCS 8508200580
Download: ML20136J009 (2)


Text

l s l M 14 kl5 1 Docket Nos. 50-348 Distribution /(s/ Fencl ) " ?

~

and 50-364 4tuoctetJ11e f 'NRC PDR ~"~

L PDR ORB #1 RDG MEMORANDUM FOR: Roger D. Walker, Director Memo file HThompson Division of Reactor Projects CParrish EReeves Region II DGruber SVarga Glainas FROM: Hugh L. Thompson, Jr., Director Division of Licensing

SUBJECT:

LICENSING ACTION REVIEWS FOR FARLEY UNITS 1 AND 2 Your assistance is requested in conducting reviews of the enclosed submittal from Alabama Power Company (APC0) dated July 22, 1985, for Farley Units 1 and 2. The product expected from you in each case as a result of your review is a complete safety evaluation report suitable for use in an amendment, if necessary. Your reviewers should use the Standard Review Plan (SRP) and l Standard Technical Specifications (STS) as guidance in determining acceptance criteria, recognizing, of course, that, for operating reactors, the criteria in these documents are not requirements.

In accordance with NRR Office Letter No. 44, each safety evaluation performed by a technical division shall have a separate SALP input provided. For purposes of these reviews, the Regional personnel involved are considered part of the technical divisions. Therefore, we are requesting that your forwarding memorandum contain a SALP input for each of the safety evaluations performed.

Work for the APC0 submittal concerning the Amendment No. 6 changes to the Farley Fire Protection Program was discussed between NRR Project Manager, E. Reeves, and P. M. Madden of your staff. The TAC numbers for the reviews are 59351 for Unit I and 59352 for Unit 2. The requested completion date is January 31, 1986. The licensee states that the changes shown in Amendment No. 6 do not decrease the effectiveness of the approved Amendment No. 5 program.

Please notify me as soon as possible if these completion dates are acceptable. Any contact with the licensee concerning these reviews or any additional information deemed necessary should be obtained through the NRR Project Manager for Farley, Edward Reeves, who can be reached at 492-7386.

Hugh L. Thompson, Jr., Director Division of Licensing, NRR

Enclosure:

As stated $8200500850eg F ADOCK 05000348 cc w/ enclosure: PDR ,

E. Reeves

, D. Gruber

  • SEEPREVIOUSWHITff ORB #1:DL* ORB' C0(CURRE%E[#1:DI BC-ps A :DL f 'L CParrish ER /ts na G inas HTc hson 08/12/85 0 p85 08my85 08f f85 y' QQ 08g/85

Docket Nos. 50-348 Distribution and 50-364 Docket file NRC PDR

> L PDR ORBf1 RDG MEMORANDUM FOR: Roger D. Walker, Director Memo file HThompson Division of Reactor Projects CParrish EReeves Region II DGruber SVarga Glainas FROM: Hugh L. Thompson, Jr., Director Division of Licensing

SUBJECT:

LICENSING ACTION REVIEWS FOR FARLEY UNITS AND 2 i' Your assistance is requested in conducting reviews of the closed submittal from Alabama Power Company (APC0) dated May 31, 1985, for arley Units 1 and 2. The product expected from you in each case as a esult of your review is a complete safety evaluation report suitabl for use in an amendment, if necessary. Your reviewers should use the Standar Review Plan (SRP) and Standard Technical Specifications (STS) as guidanc in detennining acceptance criteria, recognizing, of course, that, for opera ng reactors, the criteria in these documents are not requirements.

> In accordance with NRR Office Letter No. 44, ch safety evaluation performed by a technical division shall hav a separate SALP input provided. For purposes of these reviews, e Regional personnel involved

- are considered part of the technical divi ions. Therefore, we are i requesting that your forwarding memoran m contain a SALP input for each of the safety evaluations performed..

Work for the APC0 submittal concerni g the Amendment No. 6 changes to the Farley Fire Protection program was iscussed between NRR Project Manager, E. Reeves, and P. M. Madden of yo r staff. The TAC numbers for the reviews are 59351 for Unit 1 and 59352 f r Unit 2. The requested completion date is January 31, 1986. The license states that the changes shown in Amendment No. 6 do not decrease the eff ctiveness of the approved Amendment No. 5 program.

. Please notify me as soon 4 possible if these completion dates are acceptable. Any contactAith the licensee concerning these reviews or any additional infonnation eemed necessary should be obtained through the NRR Project Mar.ager for Fa ley, Edward Reeves, who can be reached at 492-7386.

Hugh L. Thompson, Jr., Director Division of Licensing, NRR

Enclosures:

As stated cc w/ enclosures:

E. Reeves D. Gruber ORB #1:DL ORB #1:DL BC-0RB#1:DL AD:0R:DL D:DL CParrish EReeves/ts SVarga Glainas HThompson 08/)k/85/ 08/ /85 08/ /85 08/ /85 08/ /85

_. _