Requests Concurrence W/Changes Reflected in Amend 24 to FSAR by 860102 Due to Imminent Licensing of Plant.Issues for Review Encl.W/O Distribution List
ML20136H375
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/30/1985
From: Stefano J
Office of Nuclear Reactor Regulation
To:
NRC
References
NUDOCS 8601090630
Download: ML20136H375 (3)


Text

t .

gen 3 01985

!!Ef:0 rah 00M FOR: DistributionList(attachec)

FROM: John J. Stefaro, Senior Project Manager BWR Project Directorete No. 4 Division of BWR Licensing SL'BJECT: PERRY FSAR AffERDMENT 24 By letter dated Decernber 17, 1985, the Ferry applicant (CEI) transtnitted Antenonent 24 to the FSAR, which doctrcrts comitments and issues dispositions discussed dircctly with you over the past several weds. Specific issues addressed in Ar.encr.ent 24 are listed in the enclosure to this r..en.o to assist you in exrcditing your reviews.

Since we will shortly be licensing Ferry Unit 1, your concurrences with the changes reflected in fr:endt.:ent 24 should be comunicated to r.e ro later than January 2, 1906.

R i

.lby John J. Stefano, Senior Projcct Pfanager CKR Project Directorate No. 4 Division of BWR Licensing Er.cl csur e:

As stated cc: See next page DISTRIBUTICN

' Docket file NFC FrP lecal PDR P084 Reading JStefeno MRushbrcck

/

PO#4/PM Pd [/b' gA' J$tefore:Ib s if>u tl. :r I 12

/85 12/ i H5 A ADOCM 0500o440 PDN

1

( .

  1. p me ,9'g UNITEJ STATES

, 8 ~ j, NUCLEAR RECULATORY COMMISSION r, WASHINGTON, D. C. 30606 s

i

' g**"* DEC 3 01965 l

I i

! MEMORANDUM FOR: DistributionList(attached)

FROM: John J. Stefano, Senior Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

PERRY FSAR AMEhDMENT 24 By letter dated December 17, 1985, thePerryapplicant(CE!) transmitted Amendment 24 to the FSAR, which documents comitments and issues dispositions discussed directly with you over the past several weeks. Specific issues

! addressed in Anendment 24 are listed in the enclosure to this memo to assist you in expediting your reviews.

Since we will shortly be licensing Perry Unit 1, your concurrences with the changes reflected in Amendment 24 should be comunicated to me no later than January 2,1986.

' .] }( h(kl John'J.St<tano, entorProjectManager BhR roje . Di torate No. 4

/Div sto f BW Licensing

Enclosure:

As stated cc: See next page e.. - _ _ . . _ _ _ . _ . _ _ _ _

!t . .

i Enclosure

! S FSAR AMENDHENT 24 CHANGE _S Section 1 - updates Appendix IB license consnitments relative to: Reg. Guide i 1.97, Rev 2; DCRDR; Emergency Planning; Emergency Containment

Venting; Instrument Setpoint & Methodology; Leak Reduction Program; j Gaseous Effluent Sampling System; and Silicone Sealant.

c ection 3 - Table 3.2-1 documenting correct classification of the detector

} dry tube assembly.

l Section 5 - Section 5.4.8.1.2, subitem g, relative to the media used in the 3

RWCS filter demineralizer.

r Section6-(a)increasestheareaofunqualifiedcoatingsincontainment;

(b) updates the assumptions used for reactor blowdown; (c) updates f containmentpurgeandexhaustlineactuation;(d)updatesdrywell system purge; (e) changes Tables 6.2-5, 6.2-33 and 6.3-7.

l , Sectinn 7 - (a) updates Section 7.2.1 re RPS operation. Section 7.3.1.1.14 l re drywell vacuum relief system operation; and (b) P&lD Figures 7.3-10 and 7.3-12.

Section 8 - (a) updates Section 8.3.1.1.2.11.a re protective device voltage relaying; (b) updates discussion of separation of Class 1E and h'on-Class 1E cabling; (c) changes tables 8.3-1, 8.3-10; and (d) changes electrical diagram Figure 8.3-6.

Section 9 - (a) updates Section 9.4.2.3 re plant fuel pool area vertilation systensafetyevaluation, Sections 9.4.6.3.3and9.4.6.5.3;(b) documentdeviationstoAppendixR(Section9A.7). -

Section 10 - Updates feedwater system description (Section 10.4.7.2.5).

Section 13 - Includes resume of Paul P. Martin, GSE, Procurement and Adminis-tration Qualify Section.

I Section 15 - (a) Modifies Figure 15.0-2; (b) updates core and system perfortnance I

analysesresults;(c)revisesTables 15.1-2, 15.6-18, and 15.6-20; updates Section 15.E.5 LOCA analyses to document limited operation in ME00 region during plans startup testing.

Section 17 - updates Section 17.2.10.2, QA Inspection Requirements.