Notice of Violation from Insp on 850924-26 & 1025
ML20136H224
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/19/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20136H218 List:
References
50-461-85-51, NUDOCS 8511250065
Download: ML20136H224 (1)


Text

_ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Appendix NOTICE OF VIOLATION Illinois Power Company Docket No. 50-461 As a result of the inspection conducted on September 24-26 and October 25, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:

10 CFR 50, Appendix B, Criterion V, as implemented by Illinois Power Company Nuclear Power Construction Quality Assurance Manual, Chapter 5 requires written procedures, instructions, and drawings be used, as appropriate, for activities i affecting quality.

t Contrary to the above, Baldwin Associates Resident Engineering was not adequately adhering to their established and delineated in-writing job descriptions, as evidenced by the " Lead Instrument Verification Engineer",

not meeting the required educational requirement.

This is a Severity Level V violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within tMrty days of the date of this Notice a written statement or explanation in ' eply, including for each violation: (1) corrective action l taken and the results achieved; (2) corrective action to be taken to avoid further violation; and (3) the date when full compliance 811 be achieved.

Consideration may be given to extending your response time for good cause shown.

NOV 2 91985 Dated J. J. Harrison, Chief Engineering Branch l

l I

0511250065 PDH 051119ADOCK 05000461 PDH O