ML20136G805
ML20136G805 | |
Person / Time | |
---|---|
Site: | 070*****, 07003089 |
Issue date: | 02/13/1997 |
From: | Horn M, Martin D, Ting P NRC, NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | NRC |
References | |
NUDOCS 9703180204 | |
Download: ML20136G805 (9) | |
Text
. _ _ _ _ _ _ _ - __.._ _. __ _ . _ _ - . . _ . _ . . _ _ - _ _ . _ . _ _ _
t 90-30Tf NRC/USEC Meeting Agenda Room T8A1 1 February 13,1997 NRC Activities
- l
- Part 76 Rulemaking Status 4
- Internal Guidance / Procedures
- 1/29/96 Commission Briefing on Operating Reactors and Fuel Facilities - Implications for the GDPs Status of Privatization TSR Transition Status 1
i Compliance Plan Status ,
- i i Certificate Amendment Requests i
e Status i CAAS Exclusions y fd 9703180204 970213 PDR C
ADOCK 070*****
~
h ;
PDR n. i 180068 typepppppM
4 ' MEETING OF U.S. NUC. LEAR REGULATORY COMMISSION AND UNITED STATES ENRICIIMENT CORPORATION February 13, 1997 TOPICI Monthly Status Meeting NAME AFFILIATION PHONE C h er; //cen tv tt c / 5 PG 3 c/ Yu -stag NJo unc/5fa so -q is -e ios StCJ c ko7\ A DSE L 301-S(,4-Jarl 0 (j.Jon New O S /Y C- Sol-G Y~34l%
k toes c /2u % t+z- 5 (/6 @ Oldf' 3 3 # '
hdAl $4E7%U A/AC/PSPB 30t- Y/5-7 w/
kAvV A& F4<ca e axi/se,3 sor v< 0 e<t3
- ku' \
/
,n' { } j.w All'2L/FCC1 70 l-- y ( 1 ' f o cf 3 -
(
bJ t L % gg 3 l W /) f 4 gfyy-y,cc 7q zy7-ggy d
H d
MEETING OF U.S. NUCLEAR REGULATORY COMMISSION AND UNITED STATES ENRICIIMENT CORPORATION February 13, 1997 TOPIC: Monthly Status Meeting l NAME AFFILIATION ' PHONE l
o LGTh 6<cE u n e. A u w e,s /> r w $ sma l l
Q M haitbo McAwg 4ee, mam
}kA'FHRY0l I0506% A)fC/6CC '//6'-// c/ ' /
'T h'br M Svuli Nlcl$5c 4/5 '50 %
n Wbnek ylc{Hnu/scr Vis - Go er
NRC/ DOE /USEC SENIOR MANAGEMENT MEETING February 13,1997,10:00 a.m.
NRC Offices, Rockville, MD e 1/29/97 Commission Briefing on Operating Reactors and Fuel Facilities Implications for the GDPs e Status of Privatization e NRC Activities Inspections
- Changes to Part 76 Internal Guidance / Procedures e CAAS Exclusions e Transition Status - see pages 2 & 3 ,
i e Compliance Plan Status - see pages 4 & 5 l
I e Certificate Amendment Requests - see page 6 2/13/97 1
( {
l
. . . - _ _ . . _ - - .. = . . . _ _
s PADUCAH TRANSITION STATUS Compliance Plan Issues l 1
Issue 1 - Transition from DOE to NRC Regulation Complete by 3/3/97 1
Issue 5 - Nuclear Criticality Safety Approval Documents Complete by 3/3/97 Issue 20 - Safety Committees Complete by 3/3/97 TSR Transition Feed / Chemical Operations Completed 9/5/96 Cascade Completed 1/17/97 Toll Transfer and Sampling Complete 2/19 - 3/3 Product Withdrawal Complete 2/19 - 3/3 CAAS, HAUP, TSR Section 3.0 Complete by 3/3 j Other Issues 1
. CAAS - Howler Inaudibilicy in Process Areas ;
- Modifications required
- CAAS - Linkage Between TSRs and CP Issues 46 and 50 (Audibility)
- Prepare letter to hRC by 2/14/97 2/13/97 2 h 1 1
PORTSMOUTH TRANSITION STATUS Compliance Plan Issues j l
i Issue 1 - Transition from DOE to NRC Regulation Complete by 3/3/97 I Issue 8 - Nuclear Criticality Safety Approval Documents Complete by 3/3/97 TSR Transition X-705 Decontamination Facility Completed 8/6/96 X-342,343, & 344 Feed, Transfer, & Sampling Completed 11/7/96 X-330 & X-333 Cascade Complete 2/24 - 3/3
- l Freezer Sublimers l X-330 & X-333 Cold Recovery ERP, LAW, & Tails Withdrawal Stations X-326 Cascade X-710, CAAS, TSR Section 3.0 Complete by 3/3 l Other Issues
.
- Withdrawal Station Standby Operational Mode
- Awaiting NRC issuance of certificate amendment for TSR change
- CAAS - Linkage Between TSRs and CP Issue 44 (Audibility)
- Prepare letter to NRC by 2/14/97 2/13/97 3
. COMPLIANCE PLAN ISSUES COMPLETED j
SINCE 11/30/96 (1st QUARTERLY STATUS REPORT)
PADUCAll ISSUE NO. DESCRIPTION OFISSUE 25 Event Investigation and Reporting l
~
45 Codes and Standards l A.2 Measurement Systems A.7 DOE Materials Stored in Leased Space PORTS 310UTH ISSUE NO. DESCRIPTION OFISSUE 4 X-705 Evaporator Heat Exchanger Modifications 4
22 Safety Committees 28 Event Investigation and Reporting l 36 Depleted Uranium Management Plan 37 Administrative Controls on Overtime
- 41 Codes and Standards l A.5 DOE Materials Stored in Leased Space Note: Revision bar indicates issue completed since 1/16/97 Senior Management Meeting. l
- 2/13/97 4
a 1
l
. COMPLIANCE PLAN ISSUES DUE BY 3/31/97 PADUCAll ISSUE NO. DESCRIPTION OF ISSUE DUE DATE STATUS 1 Transition from DOE Regulation to NRC Transition On schedule Regulation 5 Nuclear Criticality Safety Approval Documents Transition On schedule 14 Fire Protection Water System Reliability 3/31/97 Complete by 3/3/97 20 Safety Committees Transition On schedule 30 Public Warning Sirens and Controls 3/15/97 On schedule 1
42 Administrative Controls on Overtime 3/31/97 On schedule l
PORTSMOUTil ISSUE NO. DESCRIPTION OF ISSUE DUE DATE STATUS 1 Transition from DOE Regulation to NRC Transition On schedule Regulation 8 Nuclear Criticality Safety Approval Documents Transition On schedule 2/13/97 5
. . . .- . . . . - . . . - - - - . . = - - . =- . - . . _ - - . - - - _
~ ' '
. l CERTIFICATE AMENDMENT REQUESTS Paducah TSR - Cascade Cell Trip Function Submitted 9/30/96.
Awaiting NRC issuance of certificate amendment.
CP/TSR - Autoclave Manual Isolation System Submitted 10/31/96.
Response to 1/15/97 NRC RAI to be submitted by 2/14/97.
CP/TSR - Autoclave Inboard / Outboard Testing Submitted 12/23/96.
NRC will revic.w by 4/30/97.
]
l l
TSR-CAAS To be submitted by 2/19/97.
Portsmouth TSR - Withdrawal Station Standby Operational Mode Submitted 11/8/96.
Awaiting NRC issuance of l cenificate amendment. I Complian:e Plan /TSR - Admin. Controls on Overtime Submitted 12/23/96.
NRC will review by 2/28/97.
TSR-CAAS To be submitted by 2/19/97.
SAR Change - Operation at 3% Assay in X-333 To be submitted by 2/14/97.
2/13/97 6
( {