ML20136G805
| ML20136G805 | |
| Person / Time | |
|---|---|
| Site: | 070*****, 07003089 |
| Issue date: | 02/13/1997 |
| From: | Horn M, Martin D, Ting P NRC, NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | NRC |
| References | |
| NUDOCS 9703180204 | |
| Download: ML20136G805 (9) | |
Text
.
t 90-30Tf NRC/USEC Meeting Agenda 1
Room T8A1 February 13,1997 NRC Activities l
- Part 76 Rulemaking Status
- Internal Guidance / Procedures 4
- 1/29/96 Commission Briefing on Operating Reactors and Fuel Facilities - Implications for the GDPs Status of Privatization TSR Transition Status i
Compliance Plan Status i
i Certificate Amendment Requests i
e Status i
CAAS Exclusions y fd 9703180204 970213
~
h PDR ADOCK 070*****
C PDR n.
i 180068 typepppppM
' MEETING OF U.S. NUC. LEAR REGULATORY COMMISSION 4
AND UNITED STATES ENRICIIMENT CORPORATION February 13, 1997 TOPICI Monthly Status Meeting NAME AFFILIATION PHONE C h er;
//cen tv tt c / 5 PG 3 c/ Yu -stag NJo unc/5fa so -q is -e ios StCJ c ko7\\ A DSE L 301-S(,4-Jarl 0
(j.Jon New O S Y C-Sol-G Y~34l%
/
k toes c /2u % t+z-5
(/6 @
Oldf' 3 3 # '
hdAl
$4E7%U A/AC/PSPB 30t-Y/5-7 w/
kAvV A& F4<ca e axi/se,3 sor v< 0 e<t3 ku'
\\,n'
{ } j.w All'2L/FCC1 70 l-- y ( 1 ' f o cf 3
/
(
bJ t L % gg 3 l W /)
f 4 gfyy-y,cc 7q zy7-ggy d
H d
MEETING OF U.S. NUCLEAR REGULATORY COMMISSION AND UNITED STATES ENRICIIMENT CORPORATION February 13, 1997 TOPIC:
Monthly Status Meeting NAME AFFILIATION
' PHONE oLGTh 6<cE u n e. A u w e,s /> r w
$ sma Q
M haitbo McAwg 4ee, mam
}kA'FHRY0l I0506%
A)fC/6CC
'//6'-// c/ /
'T h'br M Svuli Nlcl$5c 4 / 5
'50 %
Wbnek ylc{Hnu/scr Vis - Go er n
NRC/ DOE /USEC SENIOR MANAGEMENT MEETING February 13,1997,10:00 a.m.
NRC Offices, Rockville, MD e
1/29/97 Commission Briefing on Operating Reactors and Fuel Facilities Implications for the GDPs e
Status of Privatization e
NRC Activities Inspections Changes to Part 76 Internal Guidance / Procedures e
CAAS Exclusions e
Transition Status - see pages 2 & 3 i
e Compliance Plan Status - see pages 4 & 5 e
Certificate Amendment Requests - see page 6
(
{
2/13/97 1
l
.. =
s PADUCAH TRANSITION STATUS Compliance Plan Issues 1
Issue 1 - Transition from DOE to NRC Regulation Complete by 3/3/97 Issue 5 - Nuclear Criticality Safety Approval Documents Complete by 3/3/97 Issue 20 - Safety Committees Complete by 3/3/97 TSR Transition Feed / Chemical Operations Completed 9/5/96 Cascade Completed 1/17/97 Toll Transfer and Sampling Complete 2/19 - 3/3 Product Withdrawal Complete 2/19 - 3/3 CAAS, HAUP, TSR Section 3.0 Complete by 3/3 j
Other Issues CAAS - Howler Inaudibilicy in Process Areas Modifications required CAAS - Linkage Between TSRs and CP Issues 46 and 50 (Audibility)
Prepare letter to hRC by 2/14/97 h
2/13/97 2
PORTSMOUTH TRANSITION STATUS Compliance Plan Issues j
l Issue 1 - Transition from DOE to NRC Regulation Complete by 3/3/97 Issue 8 - Nuclear Criticality Safety Approval Documents Complete by 3/3/97 TSR Transition X-705 Decontamination Facility Completed 8/6/96 X-342,343, & 344 Feed, Transfer, & Sampling Completed 11/7/96 X-330 & X-333 Cascade Complete 2/24 - 3/3
- Freezer Sublimers X-330 & X-333 Cold Recovery ERP, LAW, & Tails Withdrawal Stations X-326 Cascade X-710, CAAS, TSR Section 3.0 Complete by 3/3 Other Issues
- Withdrawal Station Standby Operational Mode Awaiting NRC issuance of certificate amendment for TSR change CAAS - Linkage Between TSRs and CP Issue 44 (Audibility)
Prepare letter to NRC by 2/14/97 2/13/97 3
COMPLIANCE PLAN ISSUES COMPLETED j
SINCE 11/30/96 (1st QUARTERLY STATUS REPORT)
PADUCAll ISSUE NO.
DESCRIPTION OFISSUE 25 Event Investigation and Reporting l
~
45 Codes and Standards l
A.2 Measurement Systems A.7 DOE Materials Stored in Leased Space PORTS 310UTH ISSUE NO.
DESCRIPTION OFISSUE 4
X-705 Evaporator Heat Exchanger Modifications 4
22 Safety Committees 28 Event Investigation and Reporting l
36 Depleted Uranium Management Plan 37 Administrative Controls on Overtime 41 Codes and Standards l
A.5 DOE Materials Stored in Leased Space Note: Revision bar indicates issue completed since 1/16/97 Senior Management Meeting.
l 2/13/97 4
a COMPLIANCE PLAN ISSUES DUE BY 3/31/97 PADUCAll ISSUE NO.
DESCRIPTION OF ISSUE DUE DATE STATUS 1
Transition from DOE Regulation to NRC Transition On schedule Regulation 5
Nuclear Criticality Safety Approval Documents Transition On schedule 14 Fire Protection Water System Reliability 3/31/97 Complete by 3/3/97 20 Safety Committees Transition On schedule 30 Public Warning Sirens and Controls 3/15/97 On schedule 42 Administrative Controls on Overtime 3/31/97 On schedule PORTSMOUTil ISSUE NO.
DESCRIPTION OF ISSUE DUE DATE STATUS 1
Transition from DOE Regulation to NRC Transition On schedule Regulation 8
Nuclear Criticality Safety Approval Documents Transition On schedule 2/13/97 5
-.. = - -.
=-
~ ' '
CERTIFICATE AMENDMENT REQUESTS Paducah TSR - Cascade Cell Trip Function Submitted 9/30/96.
Awaiting NRC issuance of certificate amendment.
CP/TSR - Autoclave Manual Isolation System Submitted 10/31/96.
Response to 1/15/97 NRC RAI to be submitted by 2/14/97.
CP/TSR - Autoclave Inboard / Outboard Testing Submitted 12/23/96.
NRC will revic.w by 4/30/97.
]
l l
TSR-CAAS To be submitted by 2/19/97.
Portsmouth TSR - Withdrawal Station Standby Operational Mode Submitted 11/8/96.
Awaiting NRC issuance of cenificate amendment.
Complian:e Plan /TSR - Admin. Controls on Overtime Submitted 12/23/96.
NRC will review by 2/28/97.
TSR-CAAS To be submitted by 2/19/97.
SAR Change - Operation at 3% Assay in X-333 To be submitted by 2/14/97.
(
{
2/13/97 6