OPERATING DATA REPORT DOCKET NO.
50-293 DATE 11/13/85----
COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 OPERATING STATUS 1.
Unit Name Pilgrim 1 Notes 2.
Reporting Period October 1985 3.
Licensed Thermal Power (MWt) 1998 4.
Nameplate Rating (Gross MWe) 678 5.
Design Electrical Rating (Not MWe) 655 6.
Maximum Dependable Capacity (Gross MWe)_ 690 7.
Maximum Dependable Capacity (Net MWe) 670 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None 9.
Power Level To Which Restricted, If Any (Not MWe)
None
- 10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7296.0 113040.0
- 12. Number Of Hours Reactor Was Critical 745.0 6695.0 76611.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 745.0 6550.8 74119.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1436472.0 12188232.0 129140040.0
- 17. Gross Electrical Energy Generated (MWH) 494760.0 4190250.0 43422464.0
- 18. Not Electrical Energy Generated (MWH) 476390.0 4032205.0 41729132.0
- 19. Unit Service Factor 100.0 89.8 65.6
- 20. Unit Availability Factor 100.0 89.8 65.6
- 21. Unit Capacity Factor (Using MDC Net) 95.4 82.5 55.1
- 22. Unit Capacity Factor (Using DER Net) 97.6 84.4 56.4
- 23. Unit Forced Outage Rate 0.0 7.6 9.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) 05112204:M3 851031 S.dk DR ADOCK 05000293 9'\\'
enn
AVERAGE DAILY UNIT POWER LEVEL 4
i-DOCHET NO.
50--293 UNIT
-Pilgrim 1 DATE 11/13/85 l
COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 MONTH October 1985 t
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
.1 663.
17 665.
l
)
2 663.
18 665.
4 3
661.
19 665.
4 663.
20 664.
5 663.
21 666.
i
),
6 662.
22 664.
[
l-7 663.
23 665.
i 8
662.
24 664.
9 662.
25 665.
10 663.
26 622.
i 11 663.
27 465.
I 12
- 624, 28 639.
J 13
- 538, 29 667.
i 14 665.
30 571.
-15 660.31-471.
16 655.
i i
This format, lists the average daily unit power level in MWe-Net for each day i.
In the reporting month, computed to the nearest whole megawatt.
f
}
}
.n
-,.n..
._.,-n..,n..
,,---,..---,-.,,~..-,,.,,--,,,--.--,,-.,,,n-.,,--,.,--,--.---c.-.
.-,--r,.,.,
REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to DECO, dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for next Refueling Shutdown:
September 1986 3.
Scheduled date for restart following refueling:
November 1906 4.
Due to their similarity, requests 4, 5, & 6 are responded to collectively under //6:
5.
See #6.
6.
The new fuel, which was loaded during the 1983-84 refueling outage, is of the same P8x8R design, as loaded the previous outage and consists of 160 P8DR8282 assemblies.
In addition, 32 GE6B-P8DRD282 assemblies were also loaded.
7.
(a) There are 580 fuel assemblies in the core.
(b) There are 1,128 fuel assemblies in the spent fuel pool.
8.
(a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 642 fuel assemblies.
BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCHET NO. 50-293 Operational Summary for October 1985 The unit operated at an average daily level of 99% power from the first until the twelfth when a slight power reduction was made to allow maintenance on a feedwater regulation valvo. Maintenance on the feedwater valve was completed on the thirteenth.
From the fourteenth through the twenty-fifth, the unit was operated at an average daily power level between 98% and 99%.
On the twenty-sixth and twenty-seventh, power was reduced to perform a backwash of the main condenser and repair seals on the "B" reactor feedpump.
Subsequent to feedpump maintenance, the unit was returned to an average daily level of 95% power on the twenty-eighth and 99% power on the twenty-ninth.
On the thirtieth, power was reduced to approximately 75% in response to a condensate pumo problem.
The unit remained at reduced power ( 73%) through the end of the month pending completion of condensate pump repairs.
Safety Relief Valve Challenges Month of October 1985 Requirement: NUREG-0737 T.A.P.
II.N.3.3 There were no safety relief valve challenges during the month.
UNIT SHUTD0balS AND POWER REDUCTIONS DOCMET NO.
50-293 UNIT MAME Pilgrim 1 DATE l1/13/85 COMPLETED'BY P. Hamilton
_ 617) 746-7900
(
TELEPHONE REPORT MONTH October 1985 METH00 OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING-EVENT SYSTEM COMPONENT ACTION TO NO.
'DATE TYPE 1 (HOURS) REASON 2 DOWN REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE, 18 9/1/85 F
M24.0 H
3 85-025 ZZ ZZ Scram on load reject due to salt on insulators from storm.
18 9/2/85 S
127.0 H
4 N/R ZZ ZZ While shutdown, repaired (Continued)
B recire. pump seal as planned.
19 9/28/85 F
7.5 H
1 N/R ZZ ZZ Took unit off-line due to Hurricane Gloria.
20 10/27/85 F
O.0 H
5 N/R ZZ ZZ Reduced power for condenser backwash and "B" RFP maint.
21 10/30/85 F
O.O A
5 N/R SD P
Reduced power due to "A" condensate pump being inoperable.
WNote:
Duration has been revised since last month.
1 2
2 3
4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-lO22)
Month October 1985 PILGRIM NUCLEAR POWER' STATION MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT ASSOCIATED RECURRENCE LER HPC.I Inverter Tripped Noise Reset N/R - Routine 85-029 to be Maintenance issued.
Aux. Elec.
"A" Diesel Broken Fuel Belt Replaced belt.
Evaluate and N/R Generator Pump Belt Separation trend performance.
HVAC -
VCRF-101B Fa iled Dirty Filters Replaced filters.
N/R - Routine N/R Control Rm.
Operability Maintenance Environ.
Procedure l
Filtration System l
Instrum.
IOOl-606A Blown Power Wear Swapped drawer N/R - Routine N/R
& Control Supply with torus high Maintenance-radiation drawer. -
Repairing failed drawer.
Salt "B" Pump High Vibration Normal Wear Returned motor to N/R - Routine N/R Service vendor for rework.
Maintenance Water f
Elec. Pwr.
Breaker 52-506 Trip Coil Bad Shunt Replaced breaker.
N/R - Routine.
N/R System Failed Trip Coil Maintenance
BOSTON EDISON COMPANY 500 EDVLSTON STREET WOSTON, M ASSACNuSETTS D2199 WILLIAM D. HARRINGTON essesen wees pasessent mo na.
November 13, 1985 DECO Ltr. #85-202 Director Of fice of Inspection and Enforcen.3nt U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn:
Document Control Desk License No. DnR-35 Docket No. 50--293
Subject:
October 1985 Monthly Report
Dear Sir:
In accordance with PNPS Technical Specification 6.9. A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.
Respectfully submitted, W. D. Harrington PJH: caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenuo King of Prussia, PA 19406 h
&