ML20136G755

From kanterella
Jump to navigation Jump to search
Summary of CRGR 851127 Meeting Re Proposed Rulemaking for Emergency Preparedness for Fuel Cycle & Other Radioactive Matl Licenses & Proposed Rev 3 to Reg Guide 1.63, Electric Penetration Assemblies in Containment Structures..
ML20136G755
Person / Time
Issue date: 12/26/1985
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-GTECI-B-19, REF-GTECI-TH, RTR-REGGD-01.063, RTR-REGGD-1.063, TASK-B-19, TASK-OR NUDOCS 8601080479
Download: ML20136G755 (9)


Text

7 g

UNITED STATES

  • ^

/*

NUCLEAR REGULATORY COMMISSION n

WASHINGTON, D. C. 20555 5

p

\\, * * * * * /

DEC 2 61995 MEMORANDUM FOR:

William J. Dircks Executive Director for Operations FROM:

Victor Stello, Jr., Chairman Comittee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 83 The Comittee to Review Generic Requirements (CRGR) met on Wednesday, November 27, 1985 from 1:00-5:00 p.m.

A list of attendees for this meeting is enclosed (Enclosure 1).

1.

F. Gillespie (RES) presented for CRGR review, the proposed rulemaking (modification to 10 CFR Parts 30, 40 and 70) concerning Emergency Preparedness for Fuel Cycle and Other Radioactive Material Licenses. sumarizes this matter (Category 2 item).

2.

G. Arlotto and S. Aggarwal (RES) presented for CRGR review the proposed Revision 3 to Regulatory Guide 1.63, Electric Penetration Assemblies in Containment Structures for Nuclear Power Plants. Enclosure 3 sumarizes this matter (Category 2 item).

3.

L. Rubenstein and L. Phillips (NRR) presented for CRGR review, the proposed closeout actions for resolving Generic Issue B-19, Thermal Hydraulic Stability for BWRs Enclosure 4 sumarizes this matter (Category 2 item).

4.

J. Sniezek (ROGR) presented for CRGR discussion, the proposed CRGR Charter modification to align the Charter with the NRC's Backfit Rule.

(Category 2 item).

Enclosures 2, 3, and 4 contain predecisional information and therefore will not be released to the Public Document Room until the NRC has considered (in a public forum) or decided the matters addressed by the information.

In accordance with the ED0's July 18, 1983 directive concerning " Feedback and Closure on CRGR Reviews," items 1, 2 and 3 above require written responses from cognizant offices to report agreement or disagreement with CRGR recommendations in these minutes. The responses, which are required within 5 working days after receipt of these meeting minutes, are to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the EDO for decision-making.

7 e6010s0479 e51226

)v PDR REVGP NRQCRGR

~

')

MEETING 083 PDR L

i.

l

ag; 3

l.

DEC 2 6 1995 2_ _

j Questions concerning these meeting minutes should be referred to Walt Schwink (492-8639).

Original Signed by 4

j V. Stello -

l Victor Stello, Jr., Chairman Committee to Review Generic Requirements

Enclosures:

As Stated l

cc: Commission (5)

Distribution:

SECY VStello JRoe Office Directors JHSniezek WLittle Regional Administrators RHernon EFox i

CRGR Members JHenry RErickson G. Cunningham JZwetzig FHebdon F.Gillespie JPhilips ETriner 3

i G. Arlotto DEDROGR cf Central File W. Houston PDR(NRG/CRGR)

R0GR Staff S. Aggrawal i

i

}

i 1

4 1

i l

l I

i 1

i OFC :ROGR/D.

DED GR lNAME:JHSniezek
VS lo IDATE:12//85
12/ /85 L-

(4 l

4 LIST OF ATTENDEES CRGR MEETING NO. 83 November 27, 1985 CRGR MEMBERS V. Stello R. Bernero E. Jordan J. Scinto T. Ippolito (for J. Heltemes)

D. Mausshardt (for R. Cunningham)

D. Ross OTHERS l'

J. Sniezek-L. Barnett M. Taylor G. Schwenk W. Schwink L. Phillips B. Capra B. Colmar R. Hernan C. Ader i

G. Terry J. Long H. Peterson R. Cardarelli F. Gillespie S. Feld S. McGuire

.R. Fowler M. Lesar W. Olmstead F. Congel D. Matthews S. Schwartz M. Federline B. Brach T. Cox L. Chandler G. Arlotto S. Aggarwal E. Hill D. Sullivan D. Basdekas A. Hintze M. Srinivasan C. Graves G. Thomas L. Rubenstein

.-.