March 12,1997
Mr. D. M. Smith, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
i
SUBJECT:
NRC INSPECTION REPORT 50-352/96-08;50-353/96-08, 50-277/96-11
j
AND 50-278/96-11 (REPLY)
Dear Mr. Smith:
This letter refers to your February 27,1997 correspondence, in response to our
j
February 3,1997 letter.
Thank you for informing us of the corrective and preventive actions documented in your
letter. These actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely,
Original Signed By:
Richard R. Keimig, Chief
Safeguards Branch
Division of Reactor Safety
Docket Nos. 50-352; 50-353;50-277; 5'0-278
,
I
g
ohi
g
.
9703180183 970312
ADOCK 05000277
@,
..
i
l
_ . - _ . _ . .
-
-~
..
- _. - . .
. .
-
.
Mr. D. M. Smith
2
,
cc w/ encl:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
.
W. MacFarland, Vice President - Limerick Generating Station
-
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
T. Mitchell, Vice President, Peach Bottom Atomic Power Station
G. Rainey, Senior Vice President, Nuclear Operations
D. B. Fetters, Vice President, Nuclear Station Support
T. Niessen, Director, Nuclear Quality Assurance
A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Manager, Joint Generation, Atlantic Electric
W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
R. McLean, Power Plant Siting, Nuclear Evaluations
J. Vannoy, Acting Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
L. Jacobson, Peach Bottom Alliance
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
State of Maryland
Nuclear Safety Information Center (NSIC)
TMI - Alert (TMIA)
.
l-
l
i
!
!
l
i
,
..
_.
-. -
.
._
-.
. _ -
-.
.~
. .-
!
.
.
Mr. D. M. Smith
3
Distribution w/ encl:
i
l
Region i Docket Room (with concurrences)
l
L. Cunningham, NRR (Security / Safeguards irs)
D. Barss, NRR (Emergency Plan irs)
,
'
K. Gallagher, DRP
D. Screnci, PAO (1)
NRC Resident inspector
PUBLIC
W. Dean, OEDO
J. Shea, NRR
F. Rinaldi, NRR
J. Stolz, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
R. Correia, NRR
D. Taylor, NRR
'
l
l
DOCUMENT NAME: G:\\EP&SB\\ SMITH \\96039611. REP
To receive a copy of th(document, indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
_
OFFICE $A>R
Rl/DRS
/
/
Rl/
Rl/
Rl/
NAME
GQ"
RKeimig [/ f
!
DATE
03/ f2/97
03//* /97
03/ /97
03/ /97
03/ /97
/
OFFICIAL RECORD COPY
f
i
!
l
- - . -. -.
-~
~
l
-,
-
staHon support Department
U
,
,
'
PECO NUCLEAR
nco~c-
965 chestert> rook ecuevaro
A Unit of PECO Energy
,Vavne.PA 19087-5691
February 27,1997
Docket Nos. 50-277
50-278
50-352
50-353
License Nos. DPR 44
DPR 56
)
NPF 85
i
l
U. S. Nuclear Re0ulatory Commission
ATTN: Document Control Desk
i
Washington, DC 20555
SUBJECT:
Limerick Generatin0 Station, Units 1 and 2
Peach Bottom Atomic Power Station, Units 2 and 3
'
Reply to a Notice of Violation (NRC Inspection Report Nos. 50-352/96-03 and
96-08; 50-353/96-03 and 96-08; 50-277/96-11 and 50-278/96-11)
Gentlemen:
1
This letter provides PECO Energy's response to your letter dated February 3,1997, which
transmitted the Notice of Violation conceming the referenced inspection reports. The violations
involve the failure to control Safeguards Information (SGI) in accordance with the requirements
In 10CFR73.21,
The reason for the violations, the corrective steps that have been taken and the results
achieved, the corrective steps that will be taken to avoid further violations, and the dates when
full compliance was achieved are described in the following previously docketed
correspondence:
A.
Improper Control of Limerick Generating Station Physical Security Plan
PECO Energy letter dated May 13,1996, which provided a Special Report conceming
-
improper control of SGI in that an electronic copy of the LGS Physical Security Plan was
discovered on the PECO Local Area Network (LAN), and
l
PECO Energy letter dated July 15,1996, which provided a response to the apparent
l
-
l
violation contained in NRC Inspection Report Nos. 50-352/96-03 and 50-353/96-03,
l
B.
Improper Control of SGI at Various Locations
t
PECO Energy letter dated August 1,1996, which provided a Special Report for LGS
j.
-
conceming improper 1y controlled drawings and aperture cards containing SGI at various
,
i
PECO Energy facilities,
QOS D&15
3ff-
'
-- --
-
- -. -- .- .
.
--
-
-
..
.
.
~
February 27,1997
-
Page 2
i0
i
PECO Energy letter dated August 9,1996, which provided a Special Report for Peach
-
Bottom Atomic Power Station (PBAPS) conceming improperty controlled drawings and
aperture cards containing SGI at various PECO Energy facilities,
PECO Energy letters dated September 30,1996, which supplemented the Special
-
Reports for LGS and PBAPS conceming improperly controlled drawings and aperture
cards containing SGI,
PECO Energy letter dated January 21,1997, which supplemented the Special Report
-
for LGS concoming improperty controlled drawings and aperture cards containin0 SGI at
various PECO Energy facilities, and
PECO Energy letter dated January 21,1997, which provided a respra se to the apparent
-
violation contained in NRC Inspection Report Nos. 50-277/9611, 50-278/96-11, 50-
352/96-06 and 50-353/96 08.
In the January 21,1997, response to the apparent violation, a commitment was made to
l
standardize procedures for handling and distributing SGI by March 1997. These procedures
have been revised and implemented. Additional procedures were identified that require revision
'
to direct users to utilize the newly revised standardized procedures. These additional procedures
i
will be revised by June 1997.
As previously noted in the referenced documentation, an actual security compromise did not
occur. In addition, we feel the protective measures in place to prevent unauthorized access
could have prevented an actual degradation from occurring. We appreciate your
acknowledgmerd that our corrective actions to address these issues were swift and
comprehensive.
If you have any questions or desire additional information, do not hesitate to contact us.
Sirprely,
p.a. Ahnph .
G. A. Hunger, Jr.V
/
Director- Licensing
cc:
H. J. Miller, Administrator, Region I, USNRC
'
W. L. Schmidt, Senior Resident inspector, PBAPS, USNRC
N.S. Peny, Senior Resident Inspector, LGS, USNRC
R. R. Janati, Commonwealth of Pennsylvania
!
l
l
l
!
!
.
)
$
$
l
4f
.
__
_
_
._ _
_
__
. . .
. _ . - .
_
..
_-
.
.-
-
, .
COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF CHESTER
D. B. Fetters, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy, that he has read the attached
I
response to Notice of Violation, and knows the contents thereof; and that the
statements and matters set forth therein are true and correct to the best of his
knowledge, Information and belief.
n
m
k
O,s,-
M
m
Vice President
Subscribed and sworn to
before me thisO
day
of
1997.
"
%u
~c% S
i
No ary Public
_
_
.
i
999
g
.
.-
-
.
l