Monthly Operating Rept for Oct 1985
ML20136G725
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1985
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP850193, NUDOCS 8601080442
Download: ML20136G725 (4)


Text

-- . _ _ - _ . _ . _ - . _ - . _ . -

e OPERATING IATA REPORT DOCKET No 50-341 UNIT FERMI-2 DATE Il-08-85 COMPLETED BY L.P. Brenni TELEPHONE (313) 586-5313 OPERATING STATUS

1. REPORTING PERIOD October GROSS HOURS 112 REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED PORER LEVEL (N4t) 165 MAX DEPEND CAPACITY (K4eNet)

DESIGN ELECTRICAL RATING (MJe Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 t

restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR TD DATE CUMULATIVE 199.2 1912.5 1912.5

5. NUMBER OF HOURS REACIOR WAS CRITICAL 0 0 0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0
7. HOURS GENERATOR ON LINE _0 0 0 0
8. UNIT RESERVE SHUIDOWN HOURS 20,347.2 105,861'6 105,861.6
9. GROSS THERMAL ENERGY GENERATED (51) .

0 0 0

10. GROSS ELECTRICAL ENERGY GENERATED (ET) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (ST)
12. REACTOR SERVICE FACTOR N/A N/A N/A N/A N/A N/A f
13. REACTOR AVAILABILITY FACTOR
14. UNIT SERVICE FACTOR N/A N/A N/A N/A N/A N/A
15. UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC) N/A N/A N/A 16.

UNIT CAPACITY FACTOR (Using Design M4e) N/A N/A N/A 17.

18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 11/20/85 FORECAST ACHIEVED
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY 06/20/85 06/21/85 i

INITIAL ELECTRICITY 12/20/85 l

COMW.RCIAL OPERATION 04/01/86 8601080442 851031 PDR ADOCK 05000341

  • To be determined PDR

$0 4

'{I

9 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 -341 UNIT FERMI-2 DATE 11-08-85 COMPLETED BY L.P. Bregni TELEPHONE (313) 586- 5313 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 o 0 19 0 3

4 0 20 0 5 0 21 0 6 0 22 0 0 23 0 7

8 0 24 0 0 25 0 9

0 26 0 10 0 27 0 11 0 28 0 12 0 29 0 13 0 30 0 14 0 33 0

15 16 0 i

i

i. DCCKET NO. 50-341 1

UNIT SHUTDOWNS AND POWER REDUCTIONS ' UNIT NAME Fermi-2 ,

I

' DATE Il-08-85

! COMPLETED BY L.P. Bregni j

RE; PORT MONTH October TELEPHONE (313) 586- 5313 l  !- l M20! 8iVMiOESagEM!  :

l l

e ma om l

, c:=cl - . mo .tl-o m .o n m .-. = s.- oi sl .

l I;

NO l DATE 5 mm

'l E8l C

  • l'

. -z e.

OES$E mo i CORRECTIVE ACTIONS / COMMENTS .

t , l o .

i

. o i m o o.n .

i  ;  ; i  ;  ;

! e 2 851011 l F l 501.9 l' H j 3 l l  ;

8 l l report due November 10, 1985 .

jl l l >

e e i e e a e l Reactor tripped while plant was shutting  ;

l l l l edown for a scheduled maintenance outage l 8

,l l l l l .

8 l l l l

and is still in the outage at this tire .

l . . . . s

! l l l l lCause of reactor trip is unknown and is l

!! lunder investigation.

I -l  ! l l l l i

i e e i e e e

e i

s i e e i e

.e e i e i .

i e e i . .

e- e e i

i e i e . .

e e

e  : i e e i e .

e e e e i

e e e i e i . .

e i ei e e e i

i. .

i e i e i e i i

i. e. . -

j.

i

e. . s l  : '

t: -

a I (1) REASONS E. OPERATOR TRAINING AND LICENSE EXAMINATION

! A. EQUIPMENT FAILURE (EXPLAIN)

F. ADMINISTRATIVE

, B. MAINT OR TEST ' ,

G. OPERATIONAL ERad.'. (EXPLAIN) ,

C. REFUELING I

} H. OTHER (EXPLAIN)

D. REGULATORY RESTRICTION r

i '

(2) METHOD

3. AUTOMATIC SCRAM
l. MANUAL
2. MANUAL SCRAM
4. OTHER (EXPLAIN) 1 5 --- - _ _ _ . _ _ ___ ._ _

Robert S. Lenart Plant Manager LS Detroit e- -

6400 North Dme H,ghway

+)

Newport. Mic5>gan 48166 Nuclea,

)** "*" "*

!;ovember 0, 1905 IIP 850193 U. S. 1:uclear Regulatory Corxaiccion Attention: Director, Office of Resource flanagerc.ent Uachington, D.C. 20555 Gentlenen:

Reference:

Fe rrai 2

!!RC Docket !!o. 50-341

!!RC License I?o. !!FF-43

Subject:

11onthly Operating Status Report for October, 19 fl 5 Encloned for your information and use is the Ferni 2 IIonthly Operating Stctus Report for O eber, 1905. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Pouer Reductions identified in ?;RC Regulatory Guide 1.16 and Fermi 2 Technical Specificction 6.9.1.6.

If you have any cuestions, plence contact us.

Sincerely,

_* h R. S. Lenart Plant !!anager Enclosure cc: I'r. P. II. Byron USl?RC , Document Control Dech fir . 11 . D. Lynch Hachington, D.C. 20555 Regional Administrctor fir . De:1nic Hahn USIRC Region III Division of Radiological Health 799 Roosevelt Road  !!ichigan Departnent of Ilealth Glen Ellyn, IL 60137 3500 12 orth Logan P.O. Box 30033 Lansing, !!I 48909