ML20136G725

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1985
ML20136G725
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1985
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP850193, NUDOCS 8601080442
Download: ML20136G725 (4)


Text

--

e OPERATING IATA REPORT DOCKET No 50-341 UNIT FERMI-2 DATE Il-08-85 COMPLETED BY L.P. Brenni TELEPHONE (313) 586-5313 OPERATING STATUS 1.

REPORTING PERIOD October GROSS HOURS 112 REPORTING PERIOD N/A 2.

CURRENTLY AUTHORIZED PORER LEVEL (N4t) 165 MAX DEPEND CAPACITY (K4eNet)

DESIGN ELECTRICAL RATING (MJe Net) 1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5 4.

REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 t

restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR TD DATE CUMULATIVE 5.

NUMBER OF HOURS REACIOR WAS CRITICAL 199.2 1912.5 1912.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE

_0 0

0 8.

UNIT RESERVE SHUIDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (51) 20,347.2 105,861'6 105,861.6 10.

GROSS ELECTRICAL ENERGY GENERATED (ET) 0 0

0 11.

NET ELECTRICAL ENERGY GENERATED (ST) 0 0

0 12.

REACTOR SERVICE FACTOR N/A N/A N/A 13.

REACTOR AVAILABILITY FACTOR N/A N/A N/A f

14.

UNIT SERVICE FACTOR N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR N/A N/A N/A 16.

UNIT CAPACITY FACTOR (Using MDC)

N/A N/A N/A 17.

UNIT CAPACITY FACTOR (Using Design M4e)

N/A N/A N/A 18.

UNIT FORCED OUTAGE RATE N/A N/A N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 11/20/85 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 i

l INITIAL ELECTRICITY 12/20/85 COMW.RCIAL OPERATION 04/01/86 8601080442 851031 PDR ADOCK 05000341 4

  • To be determined PDR

$0'{I

9 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 -341 UNIT FERMI-2 DATE 11-08-85 COMPLETED BY L.P. Bregni TELEPHONE (313) 586-5313 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 o

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

0 15 0

33 0

16 i

i

i.

DCCKET NO.

50-341 1

I UNIT SHUTDOWNS AND POWER REDUCTIONS

' UNIT NAME Fermi-2 DATE Il-08-85 COMPLETED BY L.P. Bregni j

TELEPHONE (313) 586-5313 RE; PORT MONTH October M20!

8iVMiOESagEM!

l l

l ma l =cl tl-o m n = s. s l l

e om

, c: -. mo.

.o m.-.

- oi I;

NO l

DATE 5

'l E8l C

  • l' OES$E CORRECTIVE ACTIONS / COMMENTS l

i mo m o o.n i

l mm

-z e.

t o

o i

gan 48166

Nuclea,

)**

!;ovember 0, 1905 IIP 850193 U.

S.

1:uclear Regulatory Corxaiccion Attention:

Director, Office of Resource flanagerc.ent Uachington, D.C.

20555 Gentlenen:

Reference:

Fe rrai 2

!!RC Docket !!o. 50-341

!!RC License I?o. !!FF-43

Subject:

11onthly Operating Status Report for October, 19 fl 5 Encloned for your information and use is the Ferni 2 IIonthly Operating Stctus Report for O eber, 1905.

This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Pouer Reductions identified in ?;RC Regulatory Guide 1.16 and Fermi 2 Technical Specificction 6.9.1.6.

If you have any cuestions, plence contact us.

Sincerely, h

R.

S.

Lenart Plant !!anager Enclosure cc:

I'r.

P.

II. Byron USl?RC, Document Control Dech fir. 11.

D. Lynch Hachington, D.C.

20555 Regional Administrctor fir. De:1nic Hahn USIRC Region III Division of Radiological Health 799 Roosevelt Road

!!ichigan Departnent of Ilealth Glen Ellyn, IL 60137 3500 12 orth Logan P.O.

Box 30033 Lansing, !!I 48909

!!r. Jon Eckert Ionroe Office of Civil Preparednesc 965 South Raisinville Road lionroe, III 48161 9@