ML20136G195

From kanterella
Jump to navigation Jump to search
Responds to 970130 Telcon RAI Re License Change Application ECR 96-02609,which Revises TS Section 2.0, Safety Limits. Response Contains Proprietary Info & GE Requests That Document Be Withheld Per 10CFR2.790(a)(4)
ML20136G195
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/12/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057G449 List:
References
NUDOCS 9703170233
Download: ML20136G195 (3)


Text

.. -~

~._-_~. ~~~_.

-~-

.. = -.

Etation Support DepirtrnInt

,. 5 5=_

10 CFR 50.90

=p-l

'PECO NUCLEAR reco tee,ov cemneev 965 Chesterbrook Boulevard A Unit of PECO Energy wayne, PA 19087-5691 4

i March 12,1997 j

l Docket No. 50-278 i

l License No. DPR-56 4

U.S. Nuclear Regulatory Commission 3

Attn: Document Control Desk Washington, DC 20555 i

Subject.

Peach Bottom Atomic Power Station, Unit 3 Response to Request for Additional information Regarding License Change Application ECR 96-02609 l

Dear Sir.

This letter is in response to your Request for Additional Information (RAl) discussed in a telephone conversation on January 30,1997 regarding License Change Application (LCA) ECR 96-02609. This LCA revises Technical Specificat on (TS) Section 2.0, " Safety Limits," and was submitted to the U. S. Nuclear Regulatory Commission on October 30,1996.

The response to your RAI is contained in the Attachment i letter from R. M.

Butrovich (GE Nuclear Energy) to H. J. Diamond (PECO Energy Company),

i

" Peach Bottom 3, Cycle 11 SLMCPR Licensing Clarification, Revision 1," dated February 11,1997.

j 4

}

This response contains information proprietary to General Electric. General Electric requests that the document be withheld from public disclosure in accordance with 10 CFR 2.790(a)(4). An affidavit supporting this request, in 4

accordance with 10 CFR 2.790(b)(1), is contained in Attachment 2.

If you have any questions, please do not hesitate to contact us.

O\\

Very truly yours, fe

- G. A. Hunger, Jr.,

Director-Licensing

Enclosures:

Affidavit, Attachment 1, Attachment 2 cc:

H. J. Miller, Administrator, Region I, USNRC

. 2OgN W. L. Schmidt, USNRC Senior Resident inspector, PBAPS J

R. R. Janati, Commonwealth of Penns Igania 970317o233 97o 12 I

~

hh*

/

j

')

l N.I.E.E.

PDR ADOcK o5ooo278:

P PDRE

l E

COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF YORK l

T. N. Mitchell, being first duly sworn, deposes and says:

i That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the attached response to the request for additional information concerning License Change Application ECR 96-02609, for Peach Bottom Facility Operating i'

License DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and i

belief.

r CY Vice President J

l Subscribed and sworn to before me this 10th day of March 1997.

04u b.Y v

e Notary Public 1

NotarialSeal JenstL

, Notary Putic

's)

PeachBoeom York 4

Js s,

otary Putdo MyCommission M 13-

%g um, Pennsytverna Ameodellon of Notaries P

, 3, Memtw, Pc Non of Notarles h

=_

)

i t

ATTACHMENT 1 Letter from R. M. Butrovich (GE Nuclear Energy) to H. J. Diamond (PECO Energy Company), " Peach Bottom 3, Cycle 11 SLMCPR Licensing Clarification, Revision 1,"

dated February 11,1997

,