MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] |
Text
-
. asa UNION ELECTRIC COMPANY 1901 Grotiot Street. St. Louis Doncld F. Schnell Vice President January 3, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1231
Dear Mr. Denton:
DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNIC 75 SPECIFICATION FIGURE 6.2-1, FIGURE 6.2-2 and SECTIONS t.5.1.2, 6.5.2.2, 6.5.2.7 and 6.5.3.1 Union Electric Company herewith transmits three original and 40 conformed copies of an application for Amendment to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.
This application requests that Callaway Technical Specification Figure 6.2-1, Figure 6.2-2 and Sections 6.5.1.2, 6.5.2.2, 6.5.2.7 and 6.5.3.1 be revised as marked to reflect administrative and organizational changen essociated with the establishment of the positions of General Manager, Nuclear Operations and Manager, Operations Support an6 resulting changes in the operating organization, engineering organization, On-Site Review Committee and Nuclear Safety Reviow Board. Also included in the change is the deletion of the position of Advisor to the Manager, Callaway Plant and the deletion of the Nuclear Construc-tion Department.
The indicated changes are intended to enhance the effectiveness and capability of Nuclear Function management. The revised organizational structure will accomplish this by focusing the scope of activities currently under the direction of the Manager, Callaway Plant and by providing a manager level position responsible solely for certain services which support operations activities of the Callaway Plant. Former responsibilities of the Nuclear Construction Department will be abso.rbed by various groups in the Nuclear Engineering, Nuclear Services and Opera-tions Support Departments. While these revisions represent changes in reporting relationships and personnel assignments, they do not represent a change in any organizational commitments g or minimum qualifications. gp 8601070163 860103 ,";;h, 7 """"
^
PDR ADOCK 05000483 - ucsa noso A P PDR ,.se v.umua Hsa ( Ht HL!!eGE R)
Mailing Address: PO 'ox 149. St. Louis, MO 63166 ron atmoro p.00 kt4' " 436@f
.Mr. Ilarold R. Denton Page 2 January 3, 1986 The organizational changes described herein will be
' implemented on an interim basis on January 15, 1986. Appoint-
.ments will be. confirmed upon notice from the NRC that related
. plant Technical Specification changes are acceptable. The detailed organizational changes will be incorporated into the next revision of the Callaway FSAR.
Enclosed is a check for the $150.00 application fee required by 10 CFR 170.21.,
Very truly yours, Donald F. Schnell JWK/lkr
Enclosures:
1 - Safety Evaluation 2 - Significant Hazards Consideration 3 - Marked Technical Specification Pages
Mr. Harold R. Denton Page 3
' January 3, 1986 cc:- Gerald Charnoff, Esq.
Shaw,-Pittman, Potts & Trowbridge 1800 M' Street,-NW
. Washington, DC 20036-Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, MD 20850
! C. W. Hehl Division of Projects and Resident Programs, Chief, Section 1A
--U.S. Nuclear Regulatory. Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Bruce.Little Callaway Resident Office U.S.-Nuclear Regulatory Commission
- RR47 Steedman, MO 65077 Tom Alexion-Office of Nuclear Reactor Regulation U.S.-Nuclear Regulatory Commission Mail Stop P-316
-7920 Norfclk ~ Avenue Bethesda, MD 20014 Ron Kucera, Deputy Director
- Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102 I-i e
?
Mr . .Horold R. Danton Page'4 January 3, 1986 bcc: D.F. Schnell J. F. McLaughlin J.E. Birk W. H. Weber F. D.' Field R. J.-Schukai M..A. Stiller S. E. Miltenberger H..Wuertenbaecher D. W. Capone A. C . Passwater T.-H. McFarland R. P..Wendling D. E. Shafer D. J.. Walker-G. P. Rathbun (KG&E)
J.- H. Smith ' (Bechtel)
G56.37 (CA-460)
Compliance (J. E. Davis)
NSRB - (Sandra Auston) 3456-0021.6 3456-0031.2.11(1043)
Nuclear Date DFS/ Chrono
Mr. Harold R. Denton Page 5 January 3, 1986 STATE OF MISSOURI )
) SS CITY OF ST. LOUIS )
Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
O By -
Donald F. Schnell Vice President Nuclear SUB CRIBED and sworn to before me this /.I day of ,
198 .
' &]
BARBA PFAF[/ [/ [
NOTARY PUBLIC STME OF MISSOtfRI MY COMMISSION EXMMS APRIL 22,1981 ST, LOUIS COUNTY
o 4
Enclosure 1 ULNRC-1231 January 3, 1986 Page 1 of 3 SAFETY EVALUATION This amendment request revis6s Callaway Plant Technical Specification Figure 6.2-1, Figure 6.2-2 and Sections 6.5.1.2, 6.5.2s2, 6.5.2.7 and 6.5.3.1 to reflect Nuclear Function organi-zat3 anal changes associated with the establishment of the posi-tions of General Manager, Nuc.' ear Operations and Manager, Operations Support, and the_resulting changes in the operating organization, engineering organization, On-Site Review Committee and Nuclear Safety Review Board. Included in this change is the deletion of the position of Advisor to Manager, Callaway Plant, the deletion of the Nuclear Construction Department and a change in. scope and title of the Superintendent, Document Program. This change also reflects the changer. to the Quality Assurance organization as described in ULNRC-1212, dated November 18, 1985.
-Figure 6.2-1 is revised to:
(1) Establish the position of General Manager, Nuclear Operations reporting to the Vice President, Nuclear; (2) Establish the position of Manager, Operations Support and to indicate that this position and the position of Manager, Callaway Plant report to the General Manager, Nuclear Operations; (3) Delete the position of Manager, Nuclear Construction and the construction staff; (4) . Establish the position of Assistant Manager, Nuclear Engineering, located on site and reporting to the Manager, Nuclear Engineering; (5) Delete the position of Superintendent, Site Liaison Engineering and establish the positions of Super-intendent, Design Control and Superintendent, Systems Engineering, both reporting to the Assistant Manager, Nuclear Engineering all located on site; and (6) Change the title of the Superintendent, Document Program to Superintendent, Nuclear Records and Informa-tion Services (NRIS).
Figure 6.2-2 is revised to:
(1) Indicate the changes described in (1) and (2) above; (2) Delete the position of Assistant Manager, Administra-tive and show the Superintendent, Personnel Development reporting to the General Manager, Nuclear Operations;
Enclosure 1 ULNRC-1231 January 3, 1986 Page 2 of 3 (3) Delete the position of Advisor to the Manager, Callaway Plant;
-(4) Indicate that the Superintendent, Outages, Assistant Manager, Materials and the Assistant Manager, Support Services report to the newly created position of Manager, Operations Support; (5) Indicate that the Superintendent, Planning and Scheduling will report to '1e Manager, Callaway Plant; and (6) Indicate the transfer of the position of Superinten-dent, Engineering from the Operations Department.
.Section 6.5.1.2 is. revised to indicate the change to the On-Site Review Committee by the addition of the Manager, Operations Support and the Assistant Manager, Nuclear Engineering and the deletion of the Assistant Manager, Support Services,. Assistant Manager, Administrative and the Advisor to Manager, Callaway Plant.
Sections 6.5.2.2 and 6.5.2.7 are revised to replace the Manager, Callawny Plant as a member of the NSRB with the General Manager, Nuclear Operations and to show that posi-tion as having line responsibility for the purposes of establishing an NSRB quorum.
Section 6.5.3.1 is revised to show the General Manager, Nuclear Operations responsible for designating appropriate Department Heads as approval authorities for procedures other than Administrative Procedures. Additionally, it is revised to show the Manager, Operations Support responsible for approving Security Plant Implementing procedures and for designating individuals responsible for reviews performed in accordance with sections 6.5.3.1.a, 6.5.3.1.b and 6.5.3.1.c.
License Condition 2.C(6) (b) which states that "UE shall have a senior' individual-with previous operating experience on a
. commercial PWR assigned to assist the Plant Manager as an advisor during the startup test program and for one year following full power operation" was satisfied as of December 19, 1985. This
, position is, therefore, deleted.
The completion of the construction phase of Callaway Plant has allowed the phase-out of the Nuclear Construction Department.
This organization is, therefore, deleted. Responsibilities related to continuing plant modifications and any future con-struction will be absorbed in the Nuclear Engineering, Nuclear Services and Operations Support Departments.
Enclosure 1 ULNRC-1231 January 3, 1986 Page 3 of 3 The title change for the position of Superintendent, Document Program to Superintendent, Nuclear Records and Informa-tion Servicen .msults from changes in the home office records management prc, sm.and establishment of a Callaway Plant Informa-tion Service computer group to serve the needs of the Nuclear Function.
The indicated changes within the Callaway Plant staff are designed to enhance the effectiveness and the capability of upper management. The revised organizational structure will accomplish this by focusing the scope of activities currently under the direction of the Manager, Callaway Plant to those which directly affect daily plant operations and by providing a manager level position responsible for training, security, materials and other services which support operations activities of the Callaway Plant. Additionally, within the Nuclear Engineering organiza-tion, the establishment of the new position of Assistant Manager, Nucleal Engineering will combine the Plant Systems Engineering with the Design Control Engineering, providing better coordina-tion of our engineering staff and enhancing the engineering support of Callaway Plant. These changes do not reduce the overall experience base nor reduce commitments to minimum qualifications.
Changes to the On-Site Review Committee provide for additional technical expertise and management oversight through the addition of the Manager, Operations Support in place of the Assistant Manager, Support Services, and the Assistant Manager, Nuclear Engineering in place of the Assistant Manager, Administrative.
Changes to the NSRB membership maintain a senior management representative with line responsibility by replacing the Manager, callaway Plant with the General Manager, Nuclear Operations.
This follows the newly defined scope of activities of the Manager, Callaway Plant without negatively impacting the capability of the NSRB.
Changes to the Technical Review and Control Activities reflect the newly defined responsibilities of the Manager, Callaway Plant and sustain the appropriate level of upper manage-
. ment responsibilities in these areas.
This proposed Technical Specification revision provides enhancements in the effectiveness and capabilities of Nuclear
-Function management for the operation of Callaway Plant and does not adversely affect or endanger the health or safety of the general public nor involve an unreviewed safety question.
Enclosure 2 ULNRC-1231 January 3, 1986 SIGNIFICANT HAZARDS CONSIDERATION This amendment request revises Callaway Technical Specifica-tion Figure 6.2-1, Figure 6.2-2 and Sections 6.5.1.2, 6.5.2.2, 6.5.2.7 and 6.5.3.1 to reflect Nuclear Function organizational changes associated with the establishment of the positions of General Manager, Nuclear Operations and Manager, Operations Support and the resulting changes in the operating organization, engineering organization, On-Site Review Committee and Nuclear Safety Review Board. The details of the new organization are presented in the Safety Evaluation to this amendment request.
The results of the Safety Evaluation conclude that while person-nel assignments are revised and reporting relationships are changed, the commitments to minimum qualifications and basic organizational reporting requirements are unchanged. These changes are administrative in nature and provide additional management strength and definition over that presently included in the Technical Specifications.
The Commission has provided guidance concerning the application of the standards in 10 CFR 50.92 by providing certain examples (48 FR 14870). One of the examples of actions involving no significant hazards consideration relates to a purely administrative change to Technical Specifications. Another example involving no significant hazards consideration is a change which ccnstitutes an additional limitation, restriction or control not presently included in the Technical Specifications.
These proposed changes are administrative in nature and introduce additional management controls not presently in the Technical Specifications and, therefore, involve no significant hazards.
These requests do not involve a significant increase in the probability or consequence of an accident or other adverse condifion over previous evaluations; or create the possibility of a new or different kind of accident or condition over previous evaluations; or involve a significant reduction in a margin of safety. Based on this information, the requested license amend-ment does not present a significant hazard.