ML20136E917

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info Re First 10-yr Interval Inservice Insp Program Plan Requests for Relief
ML20136E917
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/10/1997
From: De Agazio A
NRC (Affiliation Not Assigned)
To: Feigenbaum T, Harpster T
NORTHEAST UTILITIES SERVICE CO.
References
SEA-97-006, SEA-97-6, TAC-M97202, NUDOCS 9703130374
Download: ML20136E917 (5)


Text

_ . . _ . . _ . ~ . _ _ . _ . . - . _ . _ . _ _

March 10, 1997' i .

s' Mr. Ted C. Feigenbau2 Executive Vice President and ,

Chief Nuclear Officer Northeast Utilities Service. Company c/o Mr. Terry L. Harpster Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

. REQUEST FOR ADDITIONAL INFORMATION - FIRST 10-YEAR INTERVAL l INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF (TAC NO. l M97202)

Dear Mr. Feigenbaum:

The NRC staff, with assistance from its contractor, Idaho National Engineering Laboratory, is reviewing and evaluating your requests for relief submitted October 22, 1996, from certain requirements of Section XI of_ the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. For the staff to complete its review, additional information as identified in the enclosure to this letter is required. Please provide your responses no later than May 7, 1997.

To expedite the review process, please send a copy of your responses to:

Mr. Michael T. Anderson INEL Research Center 2151 North Boulevard PO Box 1625 Idaho Falls, Idaho 83415-2209 Sincerely, (Original Signed By) l Albert W. De Agazio, Sr. Project Manager Project Directorate I-3 Division of Reactor Projects - I/II

. Office,of Nuclear Reactor Regulation Distribution!

Docket No. 50-443 Docket File ADeAgazio hhg Serial No. SEA-97-006 PUBLIC- OGC u PDI-3 RF- ACRS 1 i Enc 1osure: As stated 'SVarga _' TMcLellan I l

. JZwolinski >JRogge, RI  !

cc w/ enc 1: See next page; . PMilano ) ,

Slittle ,

l DOCUMENT NAME: G: .

n, h,.. ,y.e m.4 \DEAGAZIO\.M97202.RAI

. i. ,w n.x: c - c y weout .it. -

chin.nt/.new.ur.

r - c=y an .it. chm.nt/.ncio.ur. n - No c ,y 0FFICE PM:PDI-3 f il(J/ LA:PDI-h Ll (A)D:P & 3 l l l NAME ADeAgazid/ SlittF PMilanF " "

DATE 03//o/97

^ 03/1D/97 03/0/97. 4 ICIAL RECORD COPY  !

3 97031%M P NRC FILE CENTER COPY

. March 10, 1997 s Mr. Tcd C. Feigenbaua Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company l c/o Mr. Terry L. Harpster- ..

l Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - FIRST 10-YEAR INTERVAL l INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF (TAC NO.

M97202)

Dear Mr. Feigenbaum:

The NRC staff, with assistance from its contractor, Idaho National Engineering Laboratory, is reviewing and evaluating your requests for relief submitted October 22, 1996, from certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. For the staff to complete its review, additional information as identified in the enclosure to this letter is required. Please provide your responses no later than May 7, 1997.

To expedite the review process, please send a copy of your responses to:

Mr. Michael T. Anderson INEL Research Center 2151 North Boule :rd PO Box 1625 Idaho Falls, Idaho 83415-2209 Sincerely, i

(Original Signed By)

Albert W. De Agazio, Sr. Project Manager i Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Distribution i i

Docket No. 50-443 Serial No. SEA-97-006 Docket File PUBLIC-ADeAgazio OGC hh u

j l PDI-3 RF ACRS l

Enclosure:

As stated 'SVarga TMcLellan I

! JZwolinski JRogge, RI l cc w/ encl: See next page. PMilano )

l Slittle 1 DOCUMENT NAME: G:\DEAGAZIO\M97202.RAI .

Ta ,eceive a espy of this document, andcete,In the box: "C" = Copy without attachment / enclosure "E' = Copy with attachment / enclosure "N" = No copy i 0FFICE PM:PDI-3 /)l(8/ LA:PDI-h lLl (A)D:P & 3 l l l l NAME ADeAgazid/ Slitt F PMi l anP " l DATE 03//o/97 03/1D/97 03/0/97 l ICIAL EECORD COPY 97031hh k3 P 30 FILE CENTER COPY c -

f **to g

& UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30806-0001 I

% # March 10, 1997

, Mr. Ted C. Feigenbaum Executive Vice President and

Chief Nuclear Officer l Northeast Utilities Service Company c/o Mr. Terry L. Harpster

.1 4

Director - Nuclear Licensing Services P.O. Box 128

. Waterford, CT 06385 i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF (TAC NO.

M97202) I

Dear Mr. Feigenbaum:

The NRC staff, with assistance from its contractor, Idaho National Engineering t Laboratory, is reviewing and evaluating your requests for relief submitted October 22, 1996, from certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. For the I staff to complete its review, additional information as identified in the enclosure to this letter is required. Please provide your responses no later than May 7, 1997. ,

j To expedite the review process, please send a copy of your responses to:  ;

Mr. Michael T. Anderson i INEL Research Center  !

2151 North Boulevard 1 PO Box 1625 Idaho Falls, Idaho 83415-2209 i l

Sincerely, Albert W. De Agazio, Sr. Pr ject Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-443 Serial No. SEA-97-006

Enclosure:

' As stated cc w/ enc 1: See next page l

1

i  !

1 l

l Northeast Utilities Service Company Seabrook Station, Unit No. 1 i

i i

cc:

~

i Lillian M. Cuoco, Esq. Mr. Jack Dolan I I

i Senior Nuclear Counsel Federal Emergency Management Agency

Northeast Utilities Service Company Region I i P.O. Box 270 J.W. McCormack P.O. &

i Hartford, CT 06141-0270 Courthouse Building, Room 442 i Boston, MA 02109 .

1 Mr. Peter Brann  !

! Assistant Attorney General Mr. David Rodham, Director

. State House, Station #6 ATTN: James Muckerheide

Augusta, ME 04333 Massachusetts Civil Defense Agency l 400 Worcester Road  !

Resident Inspector P.O. Box 1496

U.S. Nuclear Regulatory Commission Framingham, MA 01701-0317 i Seabrook Nuclear Power Station 1 l P.O. Box 1149 Jeffrey Howard, Attorney General

, Seabrook, NH 03874 G. Dana Bisbee, Deputy Attorney i General l Jane Spector 33 Capitol Street j Federal Energy Regulatory Commission Concord, NH 03301 '

825 North Capital Street, N.E.

Room 8105 Mr. D. M. Goebel Washington, DC 20426 Vice President-Nuclear Oversight Northeast Utilities Service Company Town of Exeter P. O. Box 270 10 Front Street Hartford, CT 06141-0270 ,

Exeter, NH 03823 l Mr. J. K. Thayer j Mr. George L. Iverson, Director Recovery Officer, Nuclear Engineering i New Hampshire Office of Emergency and Support j Management Northeast Utilities Service Company l State Office Park South P.O. Box 128 )

107 Pleasant Street Waterford, CT 06385 l Concord, NH 03301  :

Mr. F. C. Rothen 1 Regional Administrator, Region I Vice President - Nuclear Work Services l U.S. Nuclear Regulatory Comission Northeast Utilities Service Company  !

475 Allendale Road P.O. Box 128  !

King of Prussia, PA 19406 Waterford, CT 06385 l Office of the Attorney General One Ashburton Place Mr. A. M. Callendrello 20th Floor Licensing Manager - Seabrook Station >

Boston, MA 02108 North Atlantic Energy Service Corp.

P.O. Box 300 Board of Selectmen Seabrook, NH 03874 Town of Amesbury Town Hall Amesbury, MA 01913 z

. _ . . . _ _ - . .. . . - . . - . . . _ = _ - . - _ . . - - ,

Northeast Utilities Service Company Seabrook Stavion, Unit No. 1 i

4 cc:

Mr. W. A. DiProfio Nuclear Unit Director Seabrook Station North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 Mr. Frank W. Getman, Jr.

Cocheco Falls M111 works
100 Main Street, Suite 201 Dover, NH 03820
Mr. B. D. Kenyon ,

President - Nuclear Group Northeast Utilities Service Group P.O. Box 128 j Waterford, CT 06385 i

Mr. B. L. Drawbridge Executive Director Services &

Senior Site Officer North Atlantic Energy Service Corp.

]' Seabrook, NH 03874 I

I l l

!, l a

l l

l f

NORTH ATLANTIC ENERGY SERVICE CORPORATION l SEABROOK STATION, UNIT 1 i

DOCKET NUMBER 50-443 I

4 Reauest for Additional Information - First 10-Year Interval Reauests for Relief

?

1. Scone / Status of Review The Nuclear Regulatory Commission (NRC) is responsible for the review and

! disposition of licensee submittals relating to inservice inspection i requirements contained in the Code of Federal Regulations (CFR i

10 CFR 50.55a, and the American Society of Mechanical Engineers) (ASME),

! Section XI. Included within a submittal, licensees are required to provide both a regulatory basis (by citing the appropriate section of 10 CFR 50.55a), and a technical discussion, to support the request. This information is used to establish the context of each evaluation.

The staff has reviewed the available information submitted by North Atlantic by letter dated October 22, 1996, requesting review and approval of ISI Relief Requests Number IR-6 and IR-7 for the first 10-year inservice inspection interval.

2. Additional Information Reauired 4

1 Based on the current review, the staff has concluded that additional information and/or clarification is required to complete the evaluation.

d A. The staff has determined that licensees must state the specific paragraph of the Regulations under which each proposed alternative or request for relief is submitted. North Atlantic should review the October 22, 1996, submittal and provide the required references to ensure that each proposed alternative or request for relief is

' evaluated in accordance with the appropriate criteria, as discussed below.

A licensee may propose an alternative to CFR or Code requirements in accordance with 10 CFR 50.55a(a)(3)(1) or 10 CFR 50.55a a)(3)(11).

, When submitting a proposed alternative, the licensee mus(t specify the

. appropriate regulatory basis. Pursuant to 10 CFR 50.55a(a)(3)(1), the i

proposed alternative must be shown to provide an acceptable level of quality and safety, i.e., essentially, be equivalent to the original 4

requirement in terms of quality and safety. Pursuant to 10 CFR 50.55a(a)(3)(ii), the licensee must show that compliance with the original requirement results in a hardship or unusual difficulty 4

without a compensating increase in the level of quality and safety.

Examples of hardship and/or unusual difficulty include, but are not limited to, excessive radiation exposure, disassembly of components solely to provide access for examinations, and development of

' sophisticated tooling that would result in only minimal increases in

. examination coverage.

ENCLOSURE t

' O A licensee may submit a request for relief to ASME requirements. In accordance with 10 CFR 50.55a(g)(5)(111), if a licensee determines that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as

specified in 550.4, information to support that determination. When a licensee determines that an inservice inspection requirement is

! impractical, e.g., the system would have to be redesigned, or a component would have to be replaced to enable inspection, the licensee should cite this portion of CFR to support the criteria for evaluation. The NRC ma placed on the licensee,y, givingan impose due consideration alternative to therequirement.

examination burden B. For Request for Relief IR-6, it appears that North Atlantic is requesting relief for the Residual Heat Exchanger nozzle-to-shell weld examination (s), on the technicality that the Code does not address the nozzle design for Seabrook Station. Please provide a sketch that depicts the subject nozzle-to-shell design and describe the technique that will be implemented to perform the volumetric examination. This information will be used to determine if North Atlantic's proposed alternative provides an acceptable level of quality and safety.

l