ML20136E851

From kanterella
Jump to navigation Jump to search
Responds to Re Isat Rept Issued on 971007.Informs That Response Addresses at Broad Level,Major Conclusions & Concerns Raised by Isat
ML20136E851
Person / Time
Site: Maine Yankee
Issue date: 03/10/1997
From: Callan L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Sellman M
Maine Yankee
References
NUDOCS 9703130349
Download: ML20136E851 (5)


Text

_

, ymq $ -

p 1 UNITED STATES yo-3c7 8

s* j NUCLEAR REGULATORY COMMISSION WASHINGTON, D c. 2055M001 i

          • ,o March 10, 1997 4

Mr. Michael B. Sellman President Maine Yankee Atomic Power Company 329 Bath Road Brunswick, Maine 04011

SUBJECT:

MAINE YANKEE LETTER OF DECEMBER 10,1996 IN RESPONSE TO THE INDEPENDENT SAFETY ASSESSMENT REPORT

Dear Mr. Sellman:

This letter regards your December 10 response to the independent Safety Assessment Team's (ISAT) report issued on October 7,1996. We fir'.d your response addresses, at least at a broad level, the major conclusions and concerns raised by the ISAT. As described in your letter and at the February 4,1997, meeting with the Commission, significant steps are needed to resolve both equipment and process related issues found at the Maine Yankee facility.

Some of your plans are detailed with specific timeframes established for completion of work. Plans to address a number of issues, however, such as those in the licensing and i design basis area, were not sufficiently developed for us to assess at this time. In most such areas, your response identifies later times when plan details will be provided. We note, also, that station management changes associated with the recently established Entergy Nuclear Inc., management services contract is leading to further adjustment of your improvement program plan.

Assessment of your plans and their implementation will occur through NRC's ongoing inspection and performance overview process. In this regard as you are aware, we have decided to implement the special agency process applicable to plants in a shutdown status

such as now exists at Maine Yankee (NRC Manual Chapter 0350). An Assessment Panel 1

has been established to identify those issues requiring resolution prior to plant restart and coordinate agency inspection efforts. More broadly, our assessments will require additional meetings with you to review your plans and progress. Such meetings will be open for public observation. In addition, consistent with 0350 guidelines, NRC will hold meetings with the public to solicit input on the overall process.

/

l D

i 9703130349 970310 PDR ADOCK 05000309 P PDR

d 4

Should your staff have any specific questions on this letter, you may contact Mr. Richard J. Conte in our Region I office at (610) 337-5183.

Sincerely, s

.J sep a an Executive Director for Operations Docket No. 50-309 cc:

G. Leitch, Vice President, Operations M. Meisner, Vice President, Licensing cnd Regulatory Compliance

- J. M. Block, Attorney at Law P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

R. Blackmore, Plant Manager L. Diehl, Manager of Public and Governmental Affairs J. A. Ritsher, Attorney (Ropes and Gray)

P. Dostie, State Nuclear Safety inspector P. Brann, Assistant Attorney General U. Vanags, State Nuclear Safety Advisor C. Brinkman, Combustion Engineering, Inc.

W. D. Meinert, Nuclear Engineer First Selectmen of Wiscasset Maine State Planning Officer - Nuclear Safety Advisor l State of k.aine, SLO Designee State Planning Officer - Executive Department Friends of the Coast i

. .t3 . t

-)

4- '

~,, -

W .

s i

h

- - Michael B. Sellman S ,

ll '

Distribution vs/c ,c:." -

Region i Docket Room (with concurrences) .

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident inspector D. Screnci, PAO (2) ,

R. Conte, DRP H. Eichenholz, DRP F. Congel, AEOD W. Dean, ORDO C. Anderson,- DRP D. Beard, DRP J. Callan, EDO EDO R/F J S. Collins, NRR l

)

,< j i

i i

i EDO DOCUMENT NAME: A:\SELLMAN JCallan - ,

. 03/ /97 -

Ta veneive e copy of this document, indicate in the box: "C" = Copy without ottachment/ enclosure E' = Copy with ettachment/ enclosure "N' = No copy OFFICE DRP/RI DRS/RI NRR/ARP ORA: DEDp g - EDh ,

l NAME CHehl JWiggins RZimmerman HMiller EJ6rdan' JCallA l l DATE 03/07/97 03/03/97 03/07/97 03/05/97 03//S/97 03//D97 l'  ;

OFFICIAL RECO 3D COPY ,

1 1

,a

\

i i

l Michael B. Sellman l

I I

Distribution "!!=:!P-4 Region l Docket Room (with concurrences) i Nuclear Safety Information Center (NSIC) I PUBLIC NRC Resident inspector D. Screnci, PAO (2)

R. Conte, DRP H. Eichenholz, DRP F. Congel, AEOD l W. Dean, ORDO '

C. Anderson, DRP D. Beard, DRP J. Callan, EDO EDO R/F S. Collins, NRR EDO DOCUMENT NAME: A:\SELLMAN JCallan 03/ /97 To receive e copy of this document, indicate in the box: *C" = Copy without attachment / enclosure *E* = Copy with attachment / enclosure *N' = No copy OFFICE DRP/RI DRS/RI NRR/ARP ORA DEDO NAME CHehl JWiggins RZimmerman HMiller EJordan DATE 03/06/97 03/ /97 03/ /97 03/ /97 03/ /97 OFFICIAL RECORD COPY

MAR-06-1997 16:43 b5NRCREG1KCPPA, 610 337 5358 P.02 l

l

. Michael B. Sellman i Distribution wiench ^ -

Region i Docket Room (with concurrences) i Nuclear Safety information Center (NSIC)  !

l PUBLIC NRC Resident inspector l D. Screnci, PAO (2)  ;

i R. Conte, DRP .

H. Eichenholz, DRP i F. Congel, AEOD W. Dean, ORDO C. Anderson, DRP D. Beard, DRP JCallan j SCollins, f1RR i ED0 R/F l

t B

! l l

)

l Ta seessee a espy of thee docuenent. Iridioste in the bez: *C' = Copy without ett.c *t' . Copy with attachtnent/encleeure *N*

  • twoovvy l onciosure OFFICE DRP/RI DRS/R1 g)Qj7 DEDO 1%R/ARP l EDO NAME CHohl JWiggins RZimmerman FIMiller EJordan JCallan DATE 03/06/97 03/ /97 / 03/ /97 03 6 /97 ! 03/ /97 03/ /97

" 0FFIC L RECUliD' COPY I i

l i .

i l l

/H/se//ud l l

DOCUMENT E~ J ,e'e' .pv.tu. NAME: W t w 'SnMLPuO."d,T'

.o + . c. Am TT;.7,W-

.w.nm.,;.w. 'i . cm am.wwwese,. a:.-a.m .

OFFICE DRP/RI /f W NRR/ARP qp$ ORA pHS/RI l Il DEDO l NAME RCoopf % N /JWiggins v RZimmernian HMiller i EJordan DATE 02/20/97 '

l / OQ/3/97 @/ 7/97 02/ /97l 02/ /97 g d~FF CIAL RECORD COPY j 3\0" &

I i

TOTAL P.02 I