NOV 151985
' NOTE T0: CRGR MEMBERS
_ MONTHLY REPORT Enclosed is a' copy 'of-the sumary of CRGR activities for the period September 1 - October 31, 1985. The.sumary will be included in the ED0's Weekly Report to the Comission for the week ending November 15, 1985.
Original signed by Ja:nes H. Sniezek Jim Sniezek
Enclosure:
As stated Distribution:
VStello
.JHSniezek DEDROGR cf
-ROGR staff Central File PDR'(NRG/CRGR)
D iyy]
l gnam ailhTg -
b im 0FC :ROGR/
- ROGR/D NAME :BGahsiG1
- JSniezek
_____:_4J.*________:____________:____________:____________:____________:____________:...._______
.DATE211/14/85
- 11/ /85
DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS (DEDROGR)
Week Ending November 15, 1985 CRGR Attached is a summary of the CRGR activities for the period September 1 through October 31, 1985. Background material on topics reviewed by the Committee and the minutes of CRGR meetings are sent to the Commission. Copies are provided to the Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).
Page 1 of 3 Date: November 15,1985 ^
SUPMARY. OF CRGR ACTIVITIES (September 1 through October 31,1985)
Mesting No.
Meeting Date (Announcement CRGR CRGR Recomendation Date)
Agenda Status to EDO EDO Action 82 Review, Proposed Final Complete CRGR recomended that the No action required at 10/23/85 Version of the Insider proposed final rule be this time because NMSS Rules issued after modification has not yet taken a to reflect CRGR coments.
position on the CRGR recommendations.
_ Sponsoring Office - NMSS
-Category 2 Item
-Issue #35 Review, Proposed IE Complete CRGR recomended issuance of Bulletin modified to Bulletin, Motor-Operated the proposed bulletin after reflect CRGR concerns Valve (MOV) Common Mode modifications are made to.
and issued.
Failures During Plant reflect CRGR recomendations.
Transients Due to Improper These modifications should be Switch Settings coordinated with the ROGR staff prior to issuance of
_ Sponsoring Office - IE the bulletin.
-Category 2 Item
-Issue #129 Review, Proposed IE Complete CRGR recommended that the No action required at Commission Paper on Commission Paper be approved this time because IE Alternatives for Offsite subject to modifications.
has not yet taken Emergency Medical Services These modifications should be a position on the CRGR coordinated with the ROGR staff.
recomendations.
_ Sponsoring Office - IE
-Category 2 Item
-Issue #124
Dato: N;vember 15, 1985 Page 2 cf 3
SUMMARY
OF CRGR ACTIVITIES (September 1 through October 31,1985)
Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agerda Status to EDO FD0 Action 81 Briefing, Existing and Complete CRGR offered comments concerning No action required at 9/25/85 Forthcoming Guidance decommissioning guidance and this time.
Associated with Decom-requested that all decommissioning missioning guidance be forwarded to the CRGR Chairman to determine if CRGR
-Sponsoring Office - RES review is necessary.
-Category 2 Item
-Issue #126 Review, Proposed Rev. 2 Pending CRGR recommended prompt issuance No action required, to Regulatory Guide 1.99, of the proposed Rev. 2 to RG 1.99 Radiation Damage to Reactor for public comment.
Vessel Materials
-Sponsoring Office - RES
-Category 2 Item
-Issue #121 Review, Proposed RG, " Guide Pending CRGR recommended issuance of the No action required at for Licensee Preparation and proposed RG 1.XXX for public this time because NRR NRC Staff Review of Plant-comment after satisfactory has not yet taken a Specific Analysis Required by resolution of CRGR concerns. The position on the CRGR the Pressurized Thermal Shock CRGR Chairman asked that he be recommendation.
Rule, 10 CFR 50.61 provided with a copy of the revised RG before it is issued.
-Sponsoring Office - NRR
-Category 2 Item
-Issues #127
SUMMARY
OF CRGR ACTIVITIES
' (September 1 through October 31,1985).
Meeting No.
Menting Date i
(Announcement CRGR CRGR Recommendation i.
Date)
Agenda Status to EDO EDO Action 81 Review, Proposed IE Complete CRGR recommended issuance of the Bulletin modified to i
(Continued)
Bulletin " Steam Binding of Bulletin after modification to reflect CRGR concerns Auxiliary Feedwater Pumps reflect CRGR connents and recom-and issued.
i mendations.
I
-Sponsoring Office - IE
-Category 2 Item
. Issue #128 80 Briefing, Proposed Commission Pending No CRGR recommendation necessary
.None required at this 9/S/85 Paper Concerning Offsite at this time. CRGR will review time Medical Services this item at a future meeting.
i.
]
_ Sponsoring Office - IE
-Category 2 Item j
-Issue #124 t
Review, Proposed Resolution Complete CRGR recommended approval after-Approved and forwarded l
of USI A-43, " Containment modification to reflect specific to the Commission.
1 i
Emergency Sump Performance CRGR concerns and recommendations.
l
-Sponsoring Office - NRR J
-Category 2 Item
-Item #47 t
Briefing, Resolution of Public Pending No CRGR recommendation necessary None required at this Comments on Proposed Final at this time. The CRGR will time.
+
l Rulemaking on 10 CFR 55, review this item at a future s
)
" Operators' Licenses" and meeting.
Three Related RGs
-Sponsoring Office - NRR
-Category 2 Item
-Item #125