ML20136E388

From kanterella
Jump to navigation Jump to search
Notification of Board Meeting 86-004 on 860123 W/Util in Region I to Discuss SALP
ML20136E388
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/20/1985
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8601060531
Download: ML20136E388 (2)


Text

I

"\\ ',, y,_

? e...

-}

v No.86-004 ggg U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF BOARD MEETING Licensee:

Power Authority of the State of New York Facility:

James A. FitzPatrick Nuclear Power Plant Docket No.:

50-333 Time and Date:

1:00 p.m., January 23, 1986 Location:

NRC Region I Main Conference Room Purpose of Meeting: Systematic Assessment of Licensee Performance (SALP)

Board Meeting n V Attendees:

T. Martin, Director, Division of Radiation Safety.and Safeguards (DRSS)

S. Ebneter, Director, Division of Reactor Safety, (DRS )

R. Starostecki, Director, Division of Reactor Projects S. Collins, Chief, Reactor Projects Branch 2, DRP J. Linville, Chief, Reactor Projects Section 2C, DRP H. Abelson, Licensing Project Manager, NRR L. Doerflein, Project Engineer, DRP A. Luptak, Resident Inspector J. Durr, Chief, Engineering Branch, DRS L. Bettenhausen, Chief, Operations Branch, DRS R. Bellamy, Chief, Emergency Preparedness and Radiological Protection Branch, DRSS J. Joyner, Chief, Nuclear Materials and Safeguards Branch, DRSS D. Mueller, Director, BWR Project Directorate 2, NRR Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., January 17, 1986, via telephone call to J. Linville, Region I, at FTS 8-488-1122, or by Commercial No. 215-337-5122.

Original Signed By3 Prepared by James Linville, Chief Reactor Projects Section 2C Distribution l

W. Dircks, Executive Director for Operations V. Stello, Deputy Executive Director for Regional

^

Operations and Generic Requirements i

J. Taylor, Director, Office of Inspection and Enforcement D. Mueller, Director, BWR Project Directorate 2, NRR R. Bernaro, Director, Divisien of BWR Licensing l

Public Document Room (PDR)

Local Public Document Rocm (LPOR)

H. Ableson, LPM, BWR Project Directorate 2, NRR C. Heltemes, Director, Office of Analysis and Evaluation of Operational Data

$10gDOCM05os31 851220 0FFICIAL RECORD COPY 271LINVILLE12/19/85 G

a

..-r.

y-


,c..

  1. .-. - - - ~. + -

- f bec: Regional Administrator Receptionist Deputy Regional Administrator Public Affairs Office Division Directors DRMA File Branch Chiefs DRP File R DP L dville/sm 12/]y/85 l