ML20136D617

From kanterella
Jump to navigation Jump to search
Notice of Receipt of PSC Decommissioning/Termination Plan for Plant
ML20136D617
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/04/1997
From: Jim Hickey
NRC
To:
Shared Package
ML20136D609 List:
References
NUDOCS 9703120424
Download: ML20136D617 (5)


Text

._ _ ___ _ _ _ __ _ _ _

s. .

[7590-01-P]

U.S. NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-267 AGENCY: Nuclear Regulatory Commission ACTION: NOTICE OF RECEIPT OF THE PUBLIC SERVICE COMPANY OF COLORADO DECOMMISSIONING / TERMINATION PLAN FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION

SUMMARY

The U.S. Nuclear Regulatory Comission is noticing the receipt and reapproval of the Public Service Company's (PSC) of Colorado Decomissioning Plan (DP) as the Termination Plan for the Fort St. Vrain (FSV) Nuclear Generating Station, located near Platteville, Colorado.

BACKGROUND: NRC initially published a Notice of Consideration of Issuance of Orders to Authorize Decommissioning and Termination of Possession-Only License in the Federal Reaister on March 13, 1992 (57 FR 8940) and no comments or requests for hearing were received. On November 23, 1992, NRC issued Amendment No. 85, to License No. OPR-34, which incorporated the DP into the license, and issued an'0rder Approving the DP and Authorizing Decomissioning.

In addition, on November 12, 1996, NRC published in the Federal Reaister (61 FR 58087) a Notice of a Public Meeting with the PSC to discuss the decommissioning and license termination of the FSV. The Public Meeting was held on December 3,1996, in the vicinity of the plant, and no coments or requests for a hearing were received.

ACTION: In accordance with NRC's revised decommissioning regulations, specifically 10 CFR 50.82(a)(9)(iii), and based upon the comprehensive nature of DP, as amended, NRC is accepting the approved DP as the licensee's 9703120424 9703o4 PDR P ADOCK 05000267 ppg

2 i Termination Plan, and noticing the receipt of the FSV DP and its availability for public comment. Pursuant to a request by the licensee, an amendment is t>eing considered to the license redesignating the FSV DP as the Termination Plan, as now required by NRC's regulations, and approving the Termination Plan. Sgg 10 t.rR 50.82(a)(10).

l HEARING: The scope of 10 CFR Part 2, Subpart L, " Informal Hearing Procedures for Adjudications in Materials Licensing Proceedings," includes a hearing on power reactor decommissioning license amendments subsequent to permanent removal of the fuel from the reactor. Accordingly, pursuant to 10 CFR 2.1205(a), any person whose interest may be affected by this proceeding, may request a hearing in accordance with 10 CFR 2.1205(d). A request for a hearing must be filed within thirty (30) days of the date of f

publication of this Federal Reaister notice.

In accordance with 10 CFR 2.1205(e), a request for a hearing filed by a person other than an applicant must describe in detail:

(1) The interest of the requester in the proceeding;  ;

a (2) How that interest may be affected by the results of the proceeding, )

including the reasons why the requester should be permitted a i hearing, with particular reference to the factors set out in l 10 CFR 2.1205(h); l (3) The requester's areas of concern about the licensing activity that is the subject matter of the proceeding;.and 1

(4) The circumstances establishing that the request for a hearing is '

timely in accordance with 10 CFR 2.1205(d). j l

3

'In accordance with 10 CFR 2.1205(f), each request for a hearing must i-

-also be served, by delivering it personally or by mail, to:

(1) The applicant, Public Service ' Company ~of Colorado,16805 WCR 191/2, Platteville, Colorado, Attention: MrA.CleggCrawford,Vibe President, Engineering and Operations Support, and (2) NRC staff, by delivery to the Secretary, U.S. Nuclear Regulatory Commission, Washington,.DC 20555-0001. Attention: Docketing and Service Branch; or hand-deliver comments to: 11555 Rockville Pike,

~

Rockville, MD between 7:45 a.m. and 4:15 p.m., Federal workdays.

If no request for a Subpart L hearing _is received, the license will be l amended to approve the Termination Plan, after the thirty (30) day period for requesting a hearing has expired. Thereafter, once the determinations required under 10 CFR 50.82(a)(ll) have been made, NRC will terminate the license without further opportunity for hearing.

A copy of the DP is available for public inspection and copying at NRC's i

Public Document Room, 2120 L Street, NW., Washington, DC 20555. l l

FOR FURTHER INFORMATION CONTACT: Mr. Clayton L. Pittiglio, Project. Manager, Low-level Waste and Decommissioning Projects Branch, Division of Waste Management, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Mail Stop T-7-F27, Washington, DC 20555-0001.

Telephone (301) 415-6702.

Dated at Rockville, MD this f day of March, , 1997.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION p

John W. N. Hickey, Chief

3

)

In accordance with 10 CFR 2.1205(f), each request for a hearing must also be served, by delivering it personally or by mail, to:

1

.(1) The applicant, Public Service Company of Colorado,16805 WCR 191/2, i Platteville, Colorado, Attention: Mr A. Clegg Crawford, Vice j President, Engineering and Operations Support, and (2) NRC staff, by delivery to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Attention: Docketing and i Service Branch; or hand-deliver comments to: 11555 Rockville Pike, l Rockville, MO between 7:45 a.m. and 4:15 p.m., Federal workdays.

If no request for a Subpart L hearing is received, the license will be-amended to ap3 rove the Termination Plan, after the thirty (30) day period for requesting'a learing has expired. Thereafter, once the determinations required under 10 CFR 50.82(a)(11) have been made, NRC will terminate the license without further opportunity for hearing.

A copy of the DP is available for public inspection and copying at NRC's Public Document Room, 2120 L Street, NW., Washington, DC 20555.

1 FOR FURTHER INFORMATION CONTACT: Mr. Clayton L. Pittiglio, Project Manager, Low-level Waste and Decommissioning Projects Branch, Division of Waste Management, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Mail Stop T-7-F27, Washington, DC 20555-0001.

Telephone (301) 415-6702. ,

Dated at Rockville, MO this 4thday of March x, 1997.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION

[0riginal signed by]

John W. N. Hickey, Chief Low-level Waste and Decommissioning Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards DISTRIBUTIQH: Central File LLDP r/f HMSS r/f PUBLIC PLohaus/0SP LCarson/RIV SGagner/0PA LKokajko/SFPO~

MFederline JGreeves RNelson Open Allegations: Yes No (If yes, delete ALL reading files)

To receive a copy of this document in small box on "0FCa* Line enter: "? = copy without attachment / enclosure; "E" = copy with attachment / enclosure; "u" = No copy DISTRIBUTION: [PLEASE NOTATE W/ OR W/0 ENCL OR ATT]

Path and File Name: S:\DWM\LLDP\,CLP\FSV.FRN *SEE PREVIOUS CONCURRENCE OFC LLDP* LLDP* NMSS* RIV* OGC* LLDP* LIMF /l NAME CPittiglio JCopeland EKraus Spitzberg SLewis TCJohnson Jkickeyl DATE 2/25/97 2/24/97 2/20/97 2/27/97 2/27/97 2/25/97 2/ /97

/ l OFFICIAL RECORD COPY ACNW: YES Y NO Category: Proprietary or CF Only IG : YES N0 w LSS : YES N0 x Delete file after distribution: Yes No

i i > 3

, 7 Inaccordancewith210CFRS2'.1205(e),eachrequestforahearig'Iust also be served, by delivering it personally or by mail. to:

(1) The applicant. Public Service Company of Coloradoj16805 WCR 191/2. .

Platteville. Colorado:fAttention: Mr A. Clegg Crpwford. Vice

. Preside'nt. Eng.ineering and . Operations Support. dnd .

(2)-NRCistaff; 6ydeliver)totheiSecretary.U,5.NuclearRegulatory Commission. Washington.' DC 20555-0001. , Attention: Docketing and o Service Branch; or hand-deli'er v comments to: ~11555 Rockville Pike.

Ro'ckville.+ MD between 7:45 a.m'.- and 4115 p.m. . Federal workdays.

~ , ,

^

j

'd: If-no' request ~for s Subsarti L^ hehring'is' received'..the license will be.

terminated:by, letter.!after tie sthirty (30) day period for requesting a ith'10;CFR S50.82(a)(11)'.

hearing has expired. in accordance w/z A copy 'of t$$ DP'is availabJe for public inspection and copying at NRC's

^

Public Document Room.c2120:L'.Str et. NW., Washington DC 20555.

s FOR FURTHER INFORMATION'CONTA  : Mr. Clayton L.'Pittiglio. Project-Manager.

Low-Level Waste and!Decommisyloning Projects Branch, Division of Waste Management. Office of Nuclepr Material Safety and Safeguards. U.S. Nuclear ,

Regulatory Commission: Maia Stop T-7-F27. Washington, DC-20555-0001.

Telephone (301) 415-6702,j j

' Dated at 'Rockville.'MD'this day of~ February . 1997. -

/

/ FOR THE U.S. NUCLEAR REGULATORY COMMISSION

/ John W. N. Hickey. Chief .

Low-Level Waste and Decommissioning Projects Branch

/- Division of Waste Management Office of Nuclear Material Safety

/-

DISTRIBUTION: Central File and Safeguards LLDP r/f. NMSS r/f PUBLIC PLobaus/OSP LCarson/RIV SGagner/0PA LKokajko/SFP0 M5e'derline JGresves BJDavis RNelson To receive a copy of this document in small box on *0FC:" line enter: "C" = Copy without

,4ttachment/ enclosure: "E" = Copy with attachment / enclosure: "N* = No copy-

' DISTRIBUTION: [PLEASE NOTATE W/ OR W/0 ENCL OR ATT]

Path and File Name:S:\dwm\lldp\cip\fsv.not a, A)[d 0FC' LLDP) LILDP,'c NMSh ,[d OGC ,. _LLDP /)LLDP NAME' 'CLMiglio JCohland ks '

S[tderg NLNs '/iCJoIN JHickey DATE 2BI97 2/4/97 2/20/97 4/47/97 A 12797 .2 /2r/97 / /97-SFFICIAL RECORD COPY ACNW: YES x NO Category: Proprietary or CF Only

.IG ,: YES- NO x LSS : YES NO x Delete file after distribution: Yes No x

[ '.

1 y

..i E

4% f' ,#

e **-, ,