Monthly Operating Rept for Aug 1985
ML20136D514
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/31/1985
From: Mcnamara A, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8511210314
Download: ML20136D514 (6)


Text

r.

P

-I.

OPERATlHG DATA REPORT DOCKET NO.

50-244 DATE Septernber 12, 1985 O - F 8-DD ^ :'

COMPLETED BY Andrew E. W.:Namar'a TELEPHONE (315) 524-4446 Ext. 301 OPERATING STATUS G1nna Station

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Notes August. 1985

2. Reporting Period:

1520

3. Licensed Thermal Power (MWe):

maintained at 100% power for 490

4. Nameplate Rating (Gross MWe):

the majority of the report 470 period. 'Ihe Cne minor

5. Design Electrical Rating (Net MWe):

490 exception is detailarl on

6. Maximun Dependable Capacity (Gross MWe):

Page 3.

470

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Iress Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restricticos If Any:

This Month Yr. to Date Cumulative 744 5,831.00 138,191.00

11. Ilours in Reporting Period 744 4,940.07 105,388.78
12. Number of ifours Reactor Was Critical 0

0 1.687.55*

13. Reactor Reserve Shutdown llours 744 4,855.75 103,148.13
14. Ilours Generator On Line 0

0 8.5*

15. Unit Reserve Shutdown Hours 1,126,776 7,148.544 143.434.Tns
16. Gross Thermal Energy Generated (MWH) 369,732 2,376,029 46.861.436
17. Gross Electrical Energy Generated (MWH) 351,832 2,258,770 44,441,791
18. Nc Electrical Energy Generated (WWil) 100%

83.27%

74.64%

19. Unit Service Factor 100%

83.27%

74.65%

20. Uni Availability Facto, 100.62%

82.42%

70.05_%

21. Unit Capacity Factor (Using MDC Net) 100.62%

82.42%

70.05%

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 7.48%

0%

1.88%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annel Refueling and Maintenance - February 8 (aporox.) - 49 days duration

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Ctrmulative Total Ccmnencing January 1,1975
  • *** 9-lf 8511210314 850831 PDR ADOCK 05000244

/

h k

R PDR

cr

. [3 AVERAGE DAILY UNIT P.YdER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Sectember 12. 1985 COMPLETED BY 6.

X J-E. MM as-w_-

Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH Auaust. 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

475 17.

469 2.

476 18.

470 470 3.

476 19.

4.

480 20.

469 5.

478 21.

469 6.

482 22.

468 7.

477 23.

470 8.

475 24.

471 9.

473 25.

475 10.

473 26.

480 11.

470 27.

476 12.

469 28.

470 13.

470 29.

471 14.

469 30.

474 15.

469 31.

478 16.

~468 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l 1

s DOCKET NO.

50-244 IINIT NAMii R.E,. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE w e r 12. 1985 _

COMPLETED liY Mhi$m - -

Andrew E. McNamara REPORT MONTH AUGUST. 1985 TELEPliONE f 315) 524-4446 Ext. 301 Ginna Station m

Eq

  • I Licensee e

Couse & Corrective g,

No.

De t.

1 iE 3

1 2: I Event

-e 3,.4 Action to jd I

id$

Report 8 M

!0 Prevent Recurrence 2

g u

o No shutdown or significant power reductions to report.

I n

l I

2 3

4 F: Forced Reason:

Method:

Exhibie G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fw Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training ac License Examination F-Administrative 5

E G-Operational Enor (Explain) av.

s II-Other (Explain)

Exhibit 1 - Same Source I

tr

_4_

1 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Sectember 12. 1985 COMPLETED BY h F. N 'Vl h Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH Aucust. 1985 The reactor power was maintained at 100% for the majority of the report period, the one exception being a minor power reduction to

- 97% on August 8, 1985 to perform periodic tests on the Auxiliary and Standby Auxiliary Feedwater System.

e 4

[

J

r.

GINNA STATION o

g MAINTENANCE REPORT

SUMMARY

AUGUST, 1985 During the month of August, routine maintenance and inspections were completed.

Major safety related work included:

Adjusted Hanger on V-112C - VCT Outlet Decon, Repair and Test Spare Charging Pump Relieve Valve R-36, R-37, and R-38 Control Room Monitor Pump - Maint. Inspection Primary / Secondary Snubber Inspection 3

s e

e i

f 4

4 0

i l

l I

\\

l

~

~

r a m

$0 1-

,[

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14t.49

..<. E d."TI62too GINNA STATION September 12, 1985 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for August, 1985 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1985.

Very truly yours,

/ (40t.

M Bruce A. Snow Plant Superintendent i

BAS /eeg Attachments cc:

Dr. Thomas E. Murley NRC (1)

N ), // /}

galG#Tg cgG d' L

(

s.

f f Cod '

)

s t J