ML20136C619

From kanterella
Jump to navigation Jump to search
Requests Consolidation W/E Rosolie & Coalition for Safe Power.Rosolie Is in Agreement
ML20136C619
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/15/1979
From: Bell N
CONSOLIDATED INTERVENORS
To: Mccollum K, Mark Miller, Paxton H
AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel, OKLAHOMA STATE UNIV., STILLWATER, OK
References
NUDOCS 7909290363
Download: ML20136C619 (1)


Text

c

(- ... :.:{

-}h..'

..- ...:. I -~

. 4::

00CAEi fiUMBER M

RRC. & U~ll. FAL JP7 ~

TRC PUBLIC DOCUMEpp Nina g3 ell Marshall 728 S.E. 26th Chairman,E. ASLB Miller Ter land, Oregon 97214 U.S. Nuclear Re Washington D.C.gulatory Commission 20555 Dr. Kenneth A. McCollum Division of Engineering Oklahoma Sate Univers Stillwater, Oklahoma gy Dr. Hugh C. Paxton 1229 74074 41st St.

Les Alames, New Mexice 87544 July 15, 1979 Gentlemen; I, Nina Bell, representing in the Trojan Control B =yself and the Consolidat e d Intervenors with the other intervenor inuilding proceeding am requ~ sting consolidation this matter, Eugene Resoli for the Coalition fore Power. Saf e, pro se and I have spoken with Mr. Rosell and the CFSP.

He has e and this would be acceptabl authorized me to e to him For the second phase of th communicate this to all parti es.

in maintaining seperate st ese hearings, I do atus. not see the merit my contentions with these of M Instead I would pref r to hav consolidate e substantially the same intr. Roselle and the e CFSP as I b li eve we erests.

greatly enhance my ability t Such a consolidation would o participate in these pin ceedings.

g i eW S inc%,

d e-g 5415.

Nina Bell, p@ro[ se f// 5~

\-

i shf- c Consolidated Intervenors l

. 494 f. y;s f-I ggisa 909294 3 b3

]