Responds to NRC Re Violations Noted in Insp Repts 50-277/96-11,50-278/96-11,50-352/96-03,50-353/96-03, 50-352/96-08 & 50-353/96-08.Corrective Actions:Procedures Revised & Implemented
ML20136B557
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 02/27/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703110025
Download: ML20136B557 (3)


Text

_ _ _.

.. ~ _. _ _ - _.

_ _ -.. ~. _ _ _ _

Etition support Deptrtmint A

i 10CFR2.201

  • ,V

' PECO NUCLEAR 965 Cresterbrook 8 Mevasd A Unit of PECO Energy

)'

February 27,1997 4

l Docket Nos. 50 277 i

50-278 50-352 50-353 4

l License Nos. DPR-44 DPR-56 NPF-39 NPF-85 I

4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 2 and 3 Reply to a Notice of Violation (NRC Inspection Report Nos. 50-352/96-03 and

)

96-08; 50 353/96-03 and 96 08; 50-277/96-11 and 50-278/96-11)

I l

Gentlemen:

' This letter provides PECO Energy's response to your letter dated February 3,1997, which transmitted the Notice of Violation concerning the referenced inspection reports. The violations

{

involve the failure to control Safegt.ards Information (SGI) in accordance with the requirements

{

in 10CFR73.21.

i The reason for the violations, the corrective steps that have been taken and the results achieved, the corrective steps that will be taken to avoid further violations, and the dates when j

full compliance was achieved are described in the following previously docketed correspondence:

f f

A.

Improper Control of Limerick Generating Station Physical Security Plan PECO Energy letter dated May 13,1996, which provided a Special Report conceming improper control of SGI in that an electronic copy of the LGS Physical Security Plan was j

discovered on the PECO Local Area Network (LAN), and i

l PECO Energy letter dated July 15,1996, which provided a response to the apparent i

violation contained in NRC inspection Report Nos. 50-352/96-03 and 50 353/96-03, B.

Improper Control of SGI at Various Locations

.. (

i I

PECO Energy letter dated August 1,1996, which provided a Special Report for LGS

/

I conceming improperly controlled drawings and aperture cards containing SGI at various PECO Energy facilities,

'l hoh hh g%,IhN 7

1

February 27,1997 Page 2 PECO Energy letter dated August 9,1996, which provided a Special Report for Peach Bottom Atomic Power Statlun (PBAPS) conceming improperly controlled drawings and aperture cards containing SGI at various PECO Energy facilities, PECO Energy letters dated September 30,1996, which supplemented the Special Reports for LGS and PBAPS conceming improperly controlled dmwings and aperture cards containing SGI, PECO Energy letter dated January 21,1997, which supplemented the Special Report for LGS conceming improperly controlled drawings and aperture cards containing SGI at various PECO Energy facilities, and PECO Energy letter dated January 21,1997, which provided a response to the apparent violation contained in NRC Inspection Report Nos. 50-277/96-11,50-278/96-11, 50-352/96-08 and 50 353/96-08.

In the January 21,1997, response to the apparent violation, a commitment was made to standartlize procedures for handling and distributing SGI by March 1997. These procedures have been revised and implemented. Additional procedures were identified that require revision to direct users to utilize the newly revised standardized procedures. These additional procedures will be revised by June 1997.

As previously noted in the referenced documentation, an actual security compromise did not occur, in addition, we feel the protective measures in place to prevent unauthorized access could have prevented an actual degradation from occurring. We appreciate your acknowledgment that our corrective actions to address these issues were swift and comprehensive, if you have any questions or desire additional information, do not hesitate to contact us.

5Si0./b-np.

rely, G. A. Hunger, Jr.V Director Licensing cc:

H. J. Miller, Administrator, Region I, USNRC W. L. Schmidt, Senior Resident inspector, PBAPS, USNRC N.S. Perry, Senior Resident inspector, LGS, USNRC R. R. Janati, Commonwealth of Pennsylvania

COMMONWEALTH OF PENNSYLVANIA:

SS 1

COUNTY OF CHESTER J

D. B. Fetters, being first duly sworn, deposes and says:

1 That he is Vice President of PECO Energy, that he has read the attached i

response to Notice of Violation, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.

i O

i k

L3 i

V v

Vice President 4

e t

Subscribed and sworn to before me thisn27 day of h*

1997.

1A Notary Public l

m w

l

.MPch7esie cif%