ML20136B519
| ML20136B519 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 08/31/1985 |
| From: | Alden W, Logue R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| CON-#485-552 OL, NUDOCS 8511200228 | |
| Download: ML20136B519 (8) | |
Text
^
kIda sy"
.?
1p,3 I
OPERATING DATA REPORT beelec fed t b
DOCKET No. 50 - 35E b f-DATE SEPTEMBER 13 1965 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY g
H.H.ALDEN l
ENGINEER-IN-CHARGE f
HUCLEAR SECTION 4
GENERATION DIVISION-HUCLEAR TELEPH0HE (E15) 641-50EE F
a,,
OPERATINS STATUS
- 1. L241T HAME8 LIHERICK UNIT 1 l HOTES START UP TESTIHS ABOVE 5%
l Y
I g
i E. REPORTINS PERIOD 4 AUGUSTe 1985 i
PCHER INTERUPTED DUE TO COURT l
[.
y,
- 3. LICENSES THERNAL PONER(PSIT)8 3E93 l
ACTION TEMPORARILT RECIIGING l b'
l l
-4. HAMEPLATE RATING (EROSS IS4Elt 109E l
100X LICENSE.
I T
l
]
[
- 5. DEWIGH ELECTRICAL RATINS (HET MNEls 1955 l
I k
l t
(
l l
- 6. HAXIMUM DEPEleABLE CAPACITY (GROSS IS4E)*
1 I
k:
1 I
' 7. MAXIMUN DEPEleABLE CAPACITT (HET IS4Els.
,.v
- 4. IF CHANSES OCCUR.IH CAPACITT RATIH55 (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORTe GIVE REASONSI g
- /
Bill power -license was received Cn Augtsst 8,1985 s
- 9. PONER LEVEL 70 le4ICH RESTRICTEge IF ANY (HET PS4Els s,
- 10. REASONS FOR RESTRICTIcHS, IF ANY y
W 8511200228$5000352 PDR ADOCK PDR U
THIS N0HTH TR-TO-DATE CUMULATIVE
[.
g s
W
. 11. HOURS IN REPORTING PERICO 74'4+
3,368 3,369'4
- 1E. HLMBER OF HOURS REACTOR HAS CRITICAL 557.7 1.971.5 Ee009.E
- 13. REACTOR RESERVE SHUTD06et HOURS 0.0 0.0 0.0 5
- 14. HOURS SENERATOR OH-LINE E94.3 319.6 319.6 hR;,
' 15. UNIT RESERVE SHLTTD069( HOURS 0.0 0.0 0.0 8
- 16. GROSS THERNAL ENERSY SENERATED (MHH)
E73.653 405:575 405 575 l'
- 17. GROSS ELECTRICAL ENERST GENERATED (MHH) 50,070 50.380 50.380
~
18.' HET ELECTRICAL ENERSY SENERATED (IS4H) 34.763 10.559 10.559
- [.
39.6 5.5 4.9
- 19. UNIT SERVICE FACTOR W' i.-
s.,m.m.
g M
n N
fg
s-1.
Lt. l#1IT AVAILABILITY FACTOR 39.6 5.5 4.9
- 21. LMIT CAPACITY FACTOR (USING HDC NET)
?,"e St. LMIT CAPACITY FACTOR f uSING DER HET) w c.
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0
'N g;
- ~ '
th SduTD0604S SCHEDULED OVER HEXT 6 MONTHS (TTPE, DATE, AND DURATIDH OF EACH)*
UNIT S1 IN STARTUP TESTING.
a i.
- 25. IF SHU1006H AT Ele OF REPORT PERIODe ESTIMATED DATE OF STARTUP8
$.]
F6. lAfITS IN TEST STATUS (PRIOR TO CofftERCIAL OPERATION)8 FORECAST ACHIEVED
./
l INITIAL CRITICALITY 12/19/84 12/22/84
'}
INITIAL ELECTRICITY MID APRIL 85 4/13/85 f
CotetERCIAL OPERATION IST QTR 86 l
HOT APPLICABLE; PRIOR TO C M ERCIAL OPERATION P
t e
f e
1 1
1 -
e i ;
I.
t '
i-t t
4 t
t.
I.
6 h.
9 7
e-r.
w AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIHERICK UNIT 1 DATE SEPTEMBER 13 1965 COMPANY PHILADELPHIA ELECTRIC COMPANY i
W.H. ALDEN ENGINEER-IN-CHARGE NJCLEAR SECTION GENERATION DIVISIDH-HUCLEAR TELEPHONE (215) 641-5022
?
HONTH AUGUST 1965 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
.(tedt. NET)
(tele-NET 1 1
0 17 0
t 0
18 0
3 0
19 0
4.
0 20 0
'5 0
21 0
6 0
ft 120 7
0 23 132
~'
8 0
24 131
.i 9
0 g
25 125 10 0
26 lit 11 0
27 124 12 0
- 26 lot 13 0
29 til 14 100 30 167 15 122 31 161 16 62 I
.' Jo
t' e'
~
nl-(AIIT SHUTD00645 Als POWER REDUCTIDHS DOCKET H0. 50 - 352 n
f
!h UNIT HAME LIHERICK UNIT 1 DATE SEPTEMBER 13.1965 l
i -
REPORT HONTH AUGUSTe 1945 COMPLETED ST PHILADELPHIA ELECTRIC CONPANY W.H.ALDEN ENGINEER-IN-CHARGE.
HUCLEAR SECTION GENERATI0H DIVISIGH-HUCLEAR
(.
TELEPHONE (E15) 841-50EE I
l l
l
. l METHOD OP l LICENSC'! [SYSTEMICOMP0HENTl CAUSE AHO CORRECTIVE h
l lTTPElDURATIONlREASONISHUTTING 0 06841 EVENT l CODE l CODE l ACTION TO al ' DATE -l (131 (HOURSll (21 l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE
~
i I
l-l 1.
I I
I l
-l 850601 1 3 l 184.3 l 8 l 4
l HA l ZZ l ZZZZZZ l SHUTD0684 SINCE 4-17-85.
LICENSE LIMITED TO
'l I
I I
I I
I I,
I 5% POWER.
I,
- l l
1 I
l'-
1 I
I I
1 450884 i S I IES.7 i F l 4
l NA l ZZ l ZZZZZZ l REACTOR AT 10X POWER FOR START-UP TESTINS..
f
.I l
l l
1 1
I I
I (SEE LER 01.as-66).
I I
I I
I
-l i
I I
g I estale I s i 137.7 1 0 1 4
i NA i ZZ l ZZZZZZ l COURT ACTICH RESTRICTED UNIT TO SX POWER.
- I I
I ----- 1 I
I I
I I
i l
i I 449.7 I I
I I
I I
I r
4
.(1)
(El (3)
(4) p FORCED REASON HETH00 EXHIBIT S - INSTRUCTIONS bSCHEDULED
'A - EQUIPMENT FAILURE (EXPLAINI 1 - MANUAL FOR PREPARATION OF DATA S - HAINTENANCE OR TEST E. HANUAL SCRAN.
ENTRY SHEETS FOR LICENSEE h
EVENT REPORT (LER)
(
C - REFUELIHS 3 - AUTCHATIC SCRAM.
0 - RESULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (HURES-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION' h
F - ADMINISTRATIbE (5)
{,
8 - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIST' I. SANE SOURCE e
[
q Ilti Docket No. 50-352 Attachment to Monthly Operating Report for
)
August, 1985
- j k
hk Limerick Generating Station R
Unit 1 0
August 1 through August 31, 1985 e
- e
/{
I I.
Narrative Summary of Operating Experiences h
(:
S The unit began the month in standby awaiting issuance of a y
full power license.
At an August 8, 1985 meeting, the NRC o
commissioners voted to order the issuance of a full power 4k license to Limerick Generating Station Unit 1.
The license was received onsite at 9:00 p.m., Thursday, August 8, 1985.
[
?
While entering the startup m6de from shutdown on August 8, p
/
the reactor mode switch was inadvertently mispositioned, a
pastSTARTUP' towardsRUN', resulting in a reactor scram.
On August 10, during startup, the Reactor Core Isolation Cooling (RCIC) system was declared inoperable due to three failed quick starts.
Repairs were made to the RCIC ' turbine servo control valve to correct the flow control response
.before the-turbine-generator was synchronized on August 13.
{
.On August 9,'the Delaware River Basin' Commission approved 2
e-the Titus and Cromby water allocation swapping'for Limerick i.
-use.
On Friday, August 16, the Third Circuit Court of Appeals y
issued a~ stay-to the full power license, resulting.in NRC g
issuing an order limiting power to 5%.
At the time, the unit was-in startup testing and had been at power levels as high as 20%.
The turbine-generator was taken off line and i
reactor power was reduced to 3.7% following receipt of th.e order.
~
[
f On the following Wednesday,-August 21, the Court stay was
- j lifted and the NRC rescinded'its order of August 16.
ll I:
On August 22, power'had been increased to allow turbine-E b
-generator synchronizing.- Test Condition-1 (TC-1), which involves power testing in the 0-10% range, turbine roll, generator-synchronization, and process computer testing, U
- was completed and signed-off.
b 9
g f
e o
0 B
4
o Attachment to Monthly Operating Report for August,, 1985 Page 2 On August 28, the unit achieved 40% power for high power Average Power Range Monitor (APRM) calibration.
The unit ended the report period at approximately 28% power performing Test Condition-2 (TC-2) testing.
II.
Challenges to Relief Valves During this month, there were no challenges to the main steam systoni safety-relief valves.
I 6
6 J
F e
e
.l metaTED coRREsmwe PHILADELPHIA ELECTRIC COMPANY B3CKETED UMA 2301 MARKET STREET i
P.O. BOX 8699 oyg{p 2810 :28 j
c PHILADELPHIA. PA.19101
- j 12151841 4000 C R CECEECRt'IA"f 00CKE.iiNG & SEPW r 3 RANCH September i3,, 1985 Docket No.. 50-3520 L-Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC,20555 K
SUBJECT:
Limerick Generating Station I[
Monthly Operating Report
{-
Gentlemen:
Enclosed is the monthly operating re~ port for. Limerick.
Unit 1 for the month of August, 1985 forwarded pursuant: 'to Technical Specif.ication 6.9.1.6.
s Very truly yours',
M m
R. H. Logue Superintend.ent' i
Nuclear Services Attachment I
cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley,.NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
INPO Records Center See Attached Service List o
'l
.i! ',
! i i
cc:
Troy-B. Conner, Jr., Esq.
}
Ann P. Hodgdon, Esq.
Mr. Frank R. Romano v.Mr. Robert L. Anthony
'Ms. Phyllis Zitzer Charles W. Elliott, Esq.
Zori G.
Ferkin, Esq.
i' Mr. Thomas ' Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.
David Wersan, Esq.
4-Robert J. Sugarman, Esq.
N:
Kathryn S. Lewis, Esq.
Spence W. Perry,,Esq.
Jay M. Gutierrez,-Esq.
,,'E' Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel s
~ Docket &' Service Section (3 Copies)
E. M.
Kelly Timothy R. S.
Campbell i;:-
u
.9
.);'
September, 1985 i:
i s
t g
L