t Tennessee Valley Authority, Post Omce Box 2000, Decatur, Alabanw 35609-2000 Christopher M. (Chris) Crane Vice President, Browns Ferry Nuclear Plant March 3, 1997 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -
ANNUAL OPERATING REPORT FOR JANUARY 1, 1996 THROUGH DECEMBER 31, 1996 This letter provides, in the enclosure, the BFN Annual Operating Report (AOR) from January 1, 1996 through December 31, 1996.
TVA is submitting the AOR in accordance with BFN Technical Specifications (TS) sections 6.9.1.2, 6.9.2.1, and 10 CFR 50.59 (b) (2).
The enclosed report contains a summary of plant conditions, occupational exposure data, challenges to, or failures of, main steam relief valves, and reactor vessel fatigue usage.
The report also deta la gaseous and liquid releases.
This i
information is required by TS sections 6.9.1.2 and 6.9.2.1.
In addition, this report contains safety evaluations prepared for revisions to the Updated Final Safety Analysis Report, plant procedures (new and revised), special operating conditions, special tests, temporary alterations; and, plant modifications that were field completed during this reporting period.
This information is required by 10 CFR 50.59 (b) (2).
4t 9703110004 970303
/
PDR ADOCK 05000259.,
p PDR
\\
,E,5N
i U.S. Nuclear Regulatory Commission Page 2 March 3, 1997 Also included in this report is a summary of docketed commitments that TVA has evaluated and revised using i
administrative controls that incorporate the Nuclear Energy Institute's (NEI) " Guideline For Managing NRC Commitments."
It should be noted that BFN was one of the six licensee participants in the NRC pilot program for managing / changing commitments using the NEI guidelines.
l There are no commitments contained in this letter.
If you have any questions, please~ contact me at (205) 729-3675.
Sincerely, i
Am-C.
rane Enclosure cc - (Enclosure) :
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II i
'101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 4
NRC Resident Inspector
[
Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. J. F. Williams, Project Manager U.S. Nuclear Regulatory Commission i
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852