OPERATING DATA REPORT DOCKET NO. 50-348 DATE 9-5-85 COMPLETED BY
- t. n. Mondard TELEPHONE /969T Roo-5156 OPERATING STATUS
- 1. Unit Name:'
T~rh
Wrla" - '
- 4 '- 1
- 2. Reportas Penod: Au u u s t.1985
- 1) Cumulative data aince 2652 12-1-77, date of
- 3. I le===ad Thermal Power (MWt):
860 commercial operation.
4.' Namepiste Rating (Gross MWe):
- 5. Dengs Electncal Rating (Net MWe):
829 860.9
- 6. Maximma Dependable Capacity (Grom MWe):
816.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
v/A
- 9. Power Level To Which Restncted.lf Any (Net MWe):
M/^
- 10. Reasons For Restrictions,if Any:
N/A
~
This Month Yr to-Date Cudiulative 744 5,831 67.943
!!. Hours In Reportag Period
- 12. Number Of Hours Reactor Was Critical 76A o 4.575.1 46,704.I
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
,cyn n
- 14. Hours Generator On-Line 144 0 4.452.2
&s L76_6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 o,o
- 16. Gross Thermal Energy Generated (MWH) 1,958,242 11.336.453 115,237,028 36,776,244
- 17. Gross Electrical Energy Generated (MWH) 6A1 AAn
, nn, o,n
- 18. Net Electncal Energy Generated (MWH) 610.732
, Ano von
,,. n o n ' n,.,.
- 19. Unit Service Factor 100.0 76.4' 66.9 100.0 76.4 66.9
- 20. Unit Availability Factor
- 21. Unit Capnewy Factor (Using MDC Net) 100.5 72.9 63.7
- 22. Unit Capacity Factor (Using DER Net) on n 71.8 61,4
- 23. Unic Forced Outage Rate 0.0 1n 17.1 24.' Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Esch):
N/A
- 25. If Shur Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status tPrior to Commercial Operation):
Forecast Achieved 8-6-77 8-9-77 INITIAL CRITICALITY INITIAL ELECTRICITY 8-20-77 8-18-77
.gf L
COMMERCIAL OPERATION 12-01-77 12-01-77 851 25 850531 N'/
P"120 asaapijp g-34
^
g,,,
r DOCKET NO.
so-un I
UNIT s.
DATE 9-5-85 dard COMPLETED BY (205) 899-5156 TELEPHONE
~ 510NT11 An on" - 1999 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (alWe-Net)
(31We Net) 817 1,
17 815 2
819 gg pio Y ~'
a
~ ~ ' - --" - - -
819 3
818 20 822 4
823 3
971 21 825 825 6
g 819 7
23 R'A 825 821 g
24 825 9
gig 10 825 26 817 816 3g 820 27 822 12 2s gj7 13 826 3
g,,,
OI9 14 Al?
30 15 999 33 819 16 822 INSTRUCTIONS On this form:t. list the aversge daily unit power levelin MWe-Net for e:ch d:y in the reporting month. Compute io -
, the neare:t whole me;swatt.
(9/77)
~
O
y UNIT SilU1 DOWNS AND POWER REIME'HONS DOCKET NO. _5b-348 UNIT NAME J.M. Farley - Unit 1 DATE 9-5-85 COMPLETED gy J. D. Woodard REPORT MONTil.iagne - 1985 TELEPilONE (205) 899-5156 E
- E' Licensec Ev, j*L u
.$ g
}
] ii,j Cause & Corrective N...
mie Lt gj h
jiji g Repms #
Pacvent Hecurrence eveni n
,3 Aai.ni i.
6 mu a_
d T HERE WERE P O UN IT SHU'I DOWN: ; OR S1 GNIFICANT PO WER Hl l DUCTIONS DURING THE MONTH'OF AUGUST.
I 2
3 4
F: ForceJ Reason:
Meshod:
Ealiibit G - Insieuctions S: Sclieduled A-Equipinent Failure (Explain) 1 Manual for Preparati<m of Data B. Maintenance of Test 2 Manual Scrasn.
Entry Sheets for 1.icensee C-Refueleng 3 Automatic Scram.
Event Rep.x (l.ER) FileINUREG-D Regulasiuy Resinicti<m 4-Oslies (Explain) 0161)
E-Opesaior Training A license Exandnation F Adadaisitative 5
G Opciati.wial Escor (Explain)
Exhibis ! Same Somce l's/77) ll Ollici (Eaplain)
Mailing Address
.,'pj-Atabima Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice Pre.*ident Flintridge Building
/Maf)allla POWCf
..gw.,,,,.,.
September 11, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the August 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
)
Yours very ily,
fJ R. P.
Donald i
l RPM /SNK:nac/F-2L i
' Enclosures t
xc: Director, IE (10 copies)
Director, RII (1 copy)
I t
1 V
i.
JOSEPR M.
FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS AUGUST, 1985 There were no unit shutdowns or significant power reductions during the month of August.
The following major safety-related maintenance was performed in the month of August.
1.
Annual maintenance was performed on the 1-2A diesel generator.
2.
Miscellaneous corrective and preventive maintenance was performed on other-diesel generators.