Summary of 761130 Meeting of Interoffice QA Task Force to Discuss QA Problems
ML20136B021
Person / Time
Issue date: 12/15/1976
From: Morrison W
NRC OFFICE OF STANDARDS DEVELOPMENT
To:
NRC OFFICE OF STANDARDS DEVELOPMENT
Shared Package
ML20126B025 List:
References
FOIA-96-214 NUDOCS 7908140174
Download: ML20136B021 (2)


Text

l

.c

[

.qs k

UNITED STATES NUCLEAR REGULATORY COMM!sslON I I

%, Cl/

  • ,,.=

. December 15, 1976 l'

l NOTES FOR ATTENDEES AT THE NOVEMBER 30, 1976 MEETING OF THE INTEROFFICE QA TASK FORCE TO DISCUSS QUALITY ASSURANCE PROBLEMS.

Those in attendance at the November 30, 1976 meeting were W. M. Morrison, J. t.. Milhoan, SD; J. H. Sniezek, Mr. Peranich IE; J. G. Spraul, R. J.

Bosnak, R. Kirkwood, NRR.

Two problem areas were discussed during this meeting; the first being the fact that quality assurance requirements for Class 3 items now ,

included in the ASME Boiler and Pressure Vessel Code,Section III, do l not appear to comply with the requirements of Appendix B to 10 CFR 1 Part 50 and second, a proposal submitted by the ASME Section III )

Division 1 and 2 Work Group on Quality Assurance and Stamping to  !

make the provisions of the Code, NA 4000. conform to the provisions included in Criterion I of Appendix B was rejected at the Subgroup l on General Requirements level. Action to resolve these two probleme '

is as indicated below. I It was agreed that Bosnak as a member of the Subgroup on General Requirements would send a letter to Dobel, Chairman of this Subgroup, in which he would recommend specific changes that were required in  !

the Code so that quality assurance requirements for Class 3 items would confom to Appendix B requirements. Target date for submittal l of this letter is January 14, 1977. A proposed draft of this letter is included as an enclosure. Attendees are requested to send comments on this draft to Morrison by January 5, 1977.

l With regard to the proposed changes to reflect the Appendix B Criterion I provisions, it was agraed that Bosnak would contact Dobel to find out specifically what the problem was with the Subgroup on General Require-ments non-acceptance of the wording. Subsequent to conversations of (1) Bosnak and Dobel, and (2) Bosnak and Milhoan, it was decided that a letter would be sent to the Chairman of the Work Group on QA and Stamping proposing a resolution of problems of the Subgroup on General Requirements. A proposed draft letter from Milhoan, a member of the

  • 9

. /

Fe

@ qu s see

l i

Work Group on Quality Assurance and Stamping to Gibbons, Chairman of this Work Group, is attached. Comments on this draft should be pro-  !

vided to Morrison by January 5, 1977.

j The next meeting of the QA Task Force will be held on January 13, 1977 {

at 9:40 a.m. in Room 6507 Maryland National Bank Building.  ;

i I

hM/ktcuuc1 W. M. Morrison, Chairman )

Interoffice Quality Assurance Task Force i

Enclosures:

1. Draft letter to H. Dobel with enclosure i
2. Draft letter to W. Gibbons with enclosure I i

cc: w/ enclosures L. V. Gossick B. C. Rusche E. Volger.au K. Chapman S. Hanauer E. Case C. J. Heltemes D. Skovholt B. Grier (7)

R. B. Minogue G. A. Arlotto M. Kehnemuyi W. Morriso '~

K. Steyer J. Milhoan W. E. Campbell, Jr.

J. H. Sniezek J. G. Spraul

-R. J. Bosnak R. Kirkwood M. Peranich A. T. Clark H. George t

.