Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20211F5761999-08-26026 August 1999 Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20207B6441999-05-26026 May 1999 Summary of 990507 Meeting with Gpu Nuclear,Inc in Rockville, MD Re Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issues.List of Attendees & Copy of Licensee Handout Used at Meeting Encl ML20154F4771998-10-0505 October 1998 Summary of 980917 Meeting W/Gpu Nuclear Inc,Amergen & NRC in Rockville,Md Re Sale & License Transfer of Three Mile Island Nuclear Genrating Station,Unit 1.List of Attendees,Copy of Licensee Handout & Copy of Meeting Transcript Encl ML20236F6671998-06-30030 June 1998 Summary of 980527 Meeting W/Util Re Control Room Habitability Evaluation Related to Control Room Operator Thyroid Dose from Fission Product Releases During Postulated Design Basis Accident at Plant Unit 1 ML20249A0561998-06-10010 June 1998 Summary of 980604 Meeting W/Gpu in TMI-1 Training Center to Discuss Status of Active & Recently Completed TMI-1 Licensing Issues ML20199J7061998-02-0202 February 1998 Summary of 971212 Meeting W/Gpu Re Control Room Habitability Evaluation Concerning CR Operator Thyroid Dose from Fission Product Release During Postulated Design Basis Accident at Plant ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20217M7601997-08-21021 August 1997 Summary of 970725 Meeting W/Gpu in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20151L8201997-08-0404 August 1997 Summary of 970715 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage.List of Attendees & Handouts Encl ML20148D8531997-05-28028 May 1997 Summary of 970502 Meeting W/Util to Discuss Status of Implementation Schedule for Completion of Installation of Thermo-lag at Plants.List of Attendees Encl ML20138H5581996-12-19019 December 1996 Summary of 961126 Meeting W/Util in Rockville,Md to Discuss Two Major Issues Related to SG Tube Integrity at Facility. W/List of Attendees & Viewgraphs ML20150A2351996-02-15015 February 1996 Summary of 960205 Meeting W/Gpu at TMI-1 Site to Discuss Active & Recently Completed TMI-1 Licensing Issues.List of Participants & Copy of Handouts Encl ML20149F4911994-08-0303 August 1994 Summary of 940712 Meeting W/Util at NRC Office in Rockville,Md to Discuss Results of Control Rod Drop Testing & Subsequent Control Rod Drive Mechanism Testing During Week of 940601 ML20059J3351994-01-25025 January 1994 Notification of 940202 Meeting W/R Gary in Rockville,Md to Discuss 2.206 Petition to Shut Down TMI Unit 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062A6511990-10-0505 October 1990 Summary of 900913 Meeting W/Util in Middletown,Pa,Re Current Licensing Issues & Insp Open Items ML20055E3181990-07-0505 July 1990 Summary of 900607 Meeting W/Gpu at TMI Site Near Middletown,Pa Re Current Licensing Issues.Attendance List Encl ML20246C3331989-06-29029 June 1989 Summary of 890614 Meeting W/Util & Commonwealth of PA in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.List of Attendees & generic/multi-plant Actions Encl ML20247K5841989-05-24024 May 1989 Summary of 890512 Meeting W/Util at Site Re Status & Future Actions of Active Licensing Issues.List of Attendees & Activities Discussed Encl ML20246F4541989-05-0202 May 1989 Summary of 890410 Meeting W/Util in Middletown,Pa Re Status & Future Actions of All Active Licensing Issues.Tmi Action Items II.K.3.31 & I.C.1 Completed Since Last Monthly Meeting & Closeout Ltrs Sent to Util on 890328 ML20235W0041989-03-0101 March 1989 Summary of 890222 Meeting Between NMSS & NRR Project Manager Re Status of Cleanup & H Thompson Concern That NRR Set Cleanup Criteria That Could Cause Problem for NRC Later on ML20235Y4221989-02-27027 February 1989 Summary of 890215 Meeting W/Util in Rockville,Md Re ATWS Implementation.List of Attendees & post-meeting Questions Encl ML20235M7051989-02-16016 February 1989 Summary of 890208 Meeting W/Bechtel & Util Re Portrayal of Bechtel & Util Auditing of Nuclear Energy Svcs in Info Notice 88-035, Inadequate Licensee Performed Vendor Audits. List of Attendees Encl ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20207E2961988-07-28028 July 1988 Summary of 880714 Meeting W/B&W Owners Group Re Industry & NRC Actions to Resolve Issues Raised in Generic Ltr 87-12. List of Attendees,Viewgraphs & B&W Design Differences Encl ML20148S3821988-03-31031 March 1988 Summary of Operating Reactors Events Meeting 88-13 on 880329.List of Attendees,Discussion of Events & Summary of Reactor Scrams Encl ML20147J1081988-02-26026 February 1988 Summary of 880218 Meeting W/Gpu in Rockville,Md to Discuss Matters Pertaining to 7R Refueling Outage Planned to Commence on 880617.Attendance List & Viewgraphs Encl ML20238A9911987-08-27027 August 1987 Summary of 870824 Meeting W/Util in Bethesda,Md Re 870728 Proposed License Amend,Revising Radiological Effluents Tech Specs ML20237K6461987-08-0606 August 1987 Summary of 870619 Meeting W/Util in King of Prussia,Pa Re Changes to Util Emergency Plan for Plants Based on Changing Plant Status & Reclassification to Post Defueling Monitored Storage ML20214W9971987-06-10010 June 1987 Summary of 870521 Meeting W/Util in Bethesda,Md Re Results from Recent Tests of Steam Generator Tubes in TMI-1.Util Plans to Request Review of Proposed Change in Tube Plugging Criteria.Attendance List & Util Presentation Encl ML20215D0521986-12-0505 December 1986 Summary of 861113 Meeting W/Util & Gilbert Commonwealth,Inc at Site Re Status of Review Effort for App R Submittal.List of Attendees,Meeting Agenda & Licensee Handout Re Emergency Lighting Exemption Request Encl ML20207B0711986-10-30030 October 1986 Summary of 861027 Meeting W/Util & Eg&G Idaho Re Discussion of Selected Issues from Second 10-yr Interval Inservice Test Program Recently Approved by NRC .List of Attendees & Meeting Agenda Encl ML20210V1091986-09-30030 September 1986 Summary of 860916 Meeting W/Util & B&W Re Cycle 6 Reload Rept & Technical Approach Utilized by B&W & Util to Identify Problem Areas in Rept.List of Attendees & Meeting Handout Encl ML20210U0521986-09-30030 September 1986 Summary of 860922 Meeting W/Util Re once-through Steam Generator Tubes to Be Pulled During Cycle 6 Outage.Util Handouts & List of Attendees Encl ML20214L1851986-08-26026 August 1986 Summary of 860822 Meeting W/Util in Bethesda,Md to Discuss Deferral of Electrical Cable Tray & Conduit Support Mods Per App R.List of Attendees Encl ML20212J9241986-07-29029 July 1986 Summary of 860721 Meeting W/Util at Plant Site Re Mods to Fuel Handling Bldg Ventilation Sys.List Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206B7861986-05-20020 May 1986 Summary of B&W Counterpart 860506-08 Meetings W/Resident Inspectors Re B&W Events,Problems & Reassessment Program. Senior Resident Inspector Comments Encl ML20155K1151986-05-19019 May 1986 Summary of 860515 Meeting W/Util in Bethesda,Md Re Steam Generator Repair Criteria as Described in Licensee Tech Spec Change Request 148.List of Attendees & Licensee Presentation Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20205J7411986-02-28028 February 1986 Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20141N3971986-02-24024 February 1986 Summary of Operating Reactors Events Meeting 86-03 on 860127.Attendees,events Discussed,Significant Elements of Events & Assignments Made Listed in Encls ML20154H5941986-02-15015 February 1986 Summary of ACRS Subcommittee on Core Performance 860129 Meeting W/Util & NRC in Washington,Dc to Review Potential for Recriticality at TMI-2 During Defueling Operations. Viewgraphs Encl 1999-08-04
[Table view] Category:MEETING MINUTES-INTERNAL (NON-TRANSCRIPT) MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20069M7991979-12-10010 December 1979 Summary of 791207 Meeting Re Basic Concepts for Startup & Test Program ML20085A4071979-08-0303 August 1979 Summary of 781204 Telephone Conference W/B&W Re ECCS Small Break Analysis N4M-2-14 - Response to K-5020 ML20085A4011979-08-0303 August 1979 Summary of 781204 Telephone Conference W/B&W Re Small Break Analysis - Response to K-5020 ML20085A9581979-07-30030 July 1979 Summary of 790723 Meeting W/Duke Power Co Re B&W NSSS, Including Nuclear & Fossil Operations,Integrated Control Sys,Feedwater Sys & once-through Steam Generators ML20136A9251979-04-0505 April 1979 Summary of 790405 Meeting of Util Industry Committee on Reactor Core Condition Working Group Re Zircaloy-water Reaction & Hydrogen Inventory in Lynchburg,Va ML20136A9161979-04-0505 April 1979 Summary of 790405 Meeting of Util-Industry Committee on Reactor Core Condition Working Group Re Pellet Conditions in Lynchburg,Va ML20085A4811977-09-28028 September 1977 Summary of 770928 Meeting W/Bechtel,B&W & NRC at Davis- Besse Site Re 770924 Accident 1979-08-03
[Table view] |
Text
T
'n -
)% d..,c.y s-
/,
i, . ._,
n p6 2 , v. -), . c .
' ~ l' . m
) d :/ u..c C f YCtscoPIIm Yntd!S 3IT1f.L RC2tf5JC7 s
- 8% ,< ..
L-U.*.% Jh../l b O'bsh b. W]/s su.) -
,36/ > t'/7 g 4gy_ b.z.
u, -
JOI '/T2-74./7*- ~ T
^
y(,
.$/ p (WM071BR NO. - -} t/jn r] 3 77 i
._ 0. Y . %d<.4 .sh N2 .
- h$&KJ linJ hiemw
lbt A9-. An. a-7 s' 7 V _
& ot.aus- tior ews neemsr suer a:.ru y 77 .,y(r i \
1 sd.-cocit a uw:ox cam:s 1.v.e eso, va. fhD',c.'f-
%,mcam:s. <cm 3 3m ms. . . e 3m Q '; ,i 4<
a
'L- _ . . . . . . ..
G l
1 l
l
)
i e
4 7,ons oe# f l, l
_ _ . - j
. 1 1
THREE-IIILE ISI).!!D UNIT 2 UTILITY-INDUSTRT ' CO!O!ITTEE OR REACTOR CORE CONDIT_ ION SU!f14ARY OF WOR 1;ING GROUP !!EETIliG ON PELLET CONDITIONS I
Held April 5,1979 at B&W Lynchbur5, Virginia i
Co:apiled by Cary The:ias EPRI .
e
. i l
I l
l l
l
- $j
1 o
THREE-MILE ISLAND UNIT 2
- t C
UTILITY-II;DUSTRY COMMITTEE OR REACTOR CORE __0]iDy_101]
SUER!ARY OF WORKIllG GROUP MEETING ON CORE EINIRON!! Flit TIME HISTORY DETER'!INATION AND CURREtiT THERMAL HYDRAULIC CONFIGURATION t
. s I .
j Ccepiled by Russell Ball
! Babcock.& Wilcox l
i Ub _. : ;
Three-Hile Island Unit 2 Utility-Industry Comnittee on Neac tor Core Condit, ion Surnary of Working Group Meeting __on Pellet Condi_ti,ons, The working group meeting on Pellet Conditions renched the louing highlight ccrnclusions and reco::rnendations for future work ulting from the Working Croup discussions, Because of the limited opportunity that fuel miting could have occurred, bcsed on heat transfer boundary limitations, little active concern should be spent on this arcs.
Based on noble gas fission product rolcase, fuci penk temperatures could have been in region of $1700-18000C.
The high core oTs (and calculated APs12 psi) in some regions indicate cignificant mechanical fuel and/or cladding redistribution leading to locally high flow resistances.
For purposes of determining fuel conditions, new primary coolant sample analyses are not needed under current conditions because these samples may not be representative of bulk because ofcoolant activity chemistry levcis (campic cnd upstream line cannot be cleared firstfilters may be piogged - preventing proper samplin of some solids). .
Soma suggested tests .
tests?
- Can neutron sources be used for subcritieni
- Can single control rod be moved in region of hottest assys?
- Thru use of existing self-powered neutron detectorsfuel and ex-core monitors, can information on axial /rndial relocation be obtained thru the above tests 7 .
O e
e 9
ai 0
.sA . >
d .1 .