Forwards Insp Rept 99900902/85-02 on 850917-19.No Noncompliance Noted
ML20136A876
Person / Time
Issue date: 11/18/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hight G
WYLE LABORATORIES
Shared Package
ML20136A879 List:
References
REF-QA-99900902 NUDOCS 8511200061
Download: ML20136A876 (2)


Text

'

O v

/ \ UNITED STATES -

[ NUCLEAR REGULATORY COMMISSION r, p! wAsHaworow, o. c. roses S  ! l g..... _

November 18, 1985 Docket No. 99900902/85-02 t

Wyle Laboratories Scientific Services & Systems Group ATTN: Mr. G. W. Hight

-QA Manager 7800 Governor's Drive West

-Huntsville., AL 35807 8 .

Gentlemen:

This refers to the inspection. conducted by Mr. R. E. Oller of this office on September 17-19, 1985, of your facilities in connection with testing of Dresser Industries Type 3700 safety relief valves which were received from Davis Besse nuclear power plant.

The purpose of this inspection was to observe the full flow testing of these main steam safety relief valves.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet NRC requirements. However, the valves tested failed due to leakage.

The valves were disassembled and a critical inspection of the internal parts were performed by representatives of the Toledo Edison Company (TEC), Wyle Laboratories (WL) and Dresser Industries (DI). The cause of the leakage was still being evaluated at the conclusion of this inspection. .

In accordance with 10.CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will'be placed in the NRC's public document room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Gar . Zech, Chief 8511200061 851118 Vendor Program Branch PDR GA999 EXIWYLE Division of Quality Assurance, Vendor, 99900902 PDR and Technical Training Center Programs Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 99900902/85-02 lg

D.

Wyle Laboratories -

Distribution:

C VPB Reading DQAVT Reading RVollmer JCollins JStone EMerschoff b b SC/VPB:hv UQAVT B- AVT D AVT r mes EWMerschoff 10//f'/85 0/36/85 A .////85 hhDA GiZEcH utv id 1'