Monthly Operating Rept for Aug 1985
ML20136A733
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1985
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8511200017
Download: ML20136A733 (5)


Text

.

r-,'

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 9-3-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ AUGUST 8-1-85 Continuation of 7-31-85 startup.

8-2-85 to Power operation.

8-3-85 8-4-85.

Reduced power to adjust control rods.

8-5-85 to Power operation.

8-24-85 8-25-85 Reduced power to 60% to investigate apparent water hammer.

8-26-85 Reduced power to 60% to recoup te feedwater regulating valve.

8-27-85 to Power operation.

8-31-85 SPENT FUEL STORAGE UPDATE Fuel assemblies in core 484 Fue L assemb L ies in spent fuel storage pool 556 Licensed capacity 2237 Date of Last refueling that can be

'i999 discharge with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified surveitLance testing.

$h!

5 23

\\

\\

_g

~

e..

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT MonticeLLo__

DATE 9-3-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

__________513 17

__________541____________

1 2

__________539____________

18

__________540____________

3

__________540____________

19

__________550____________

4

__________461____________

20

__________514____________

5

__________540____________

21

__________547____________

6

__________538____________

22

__________545____________

7

__________540____________

23

__________547____________

8

__________541____________

24

__________548____________

t 9

__________540____________

75

__________457____________

10

__________543____________

26

__________505____________

l ii

__________515____________

27

__________545____________

12

__________543____________

28

__________546____________

13

__________543____________

29

__________546 l

14

__________541____________

30

__________543____________

15

__________542____________

31

__________547____________

16

__________543____________

l l

i INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each day in the reporting-month.

Compute to the nearest ~whole megawatt.

L._

OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 9-3-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUJ l Notes l

1. Unit Name : ________________________Monticelto l

l

2. Reporting period:

_____________ AUGUST l

l

_ = = -

3. Licensed Therma l Power (MWt): ____________1670 l

l

4. Nameplate Rating (Gross MWe):

_____________569 l

1

5. Design Electrical Rating (Net MWe): _____545.4 l

l

6. Maximum Dependable Capacity (Gross MWe): __564 l

l

7. Maximum Dependable Capacity (Net MWe):

____536 l__________________________l

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

___N/A___________________

10. Reasons For Restrictions. If Any:

__N/A_____________________________________

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_____744

_____583i

____124224

12. Number Of Hours Reactor Was Critical

___744.0

___5253.1

__ 95339.3

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___744.0

___5131.3

__ 93118.0

15. Unit Reserve Shutdown Hours

_____0.0

______O.0

_______0.0

16. Gross Therma L Energy Generated (MWH)

_1220736

_ 8306147

_141500693

17. Gross Electrical Energy Generated (MWH) __415835

__2838791

__48023844

18. Net Electrica L Energy Generated (MWH)

__396875

__2722047

__45907100

19. Unit Service Factor

__100.0%

88.0%

____ 75.0%

20. Unit Availability Factor

__100.0%

88.0%

____ 75.0%

21. Uni t Capac i ty Factor (Using MDC Net)

__ 99.5%

87.1%

____ 68.9%

22. Unit Capacity Factor (Using DER Net)

__ 97.8%

___ 85.6%

____ 67.8%

23. Unit Forced Outage Rate 0.0%

0.9%

5.1%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) 1

__May 10, 1986 - 1986 refueling outage - 41 days ________________________

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:____________
26. Uni ts In Test Status (Prior to Commercia L Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

l

- ~,

C -

.C W Q

C til m

% v a

e x

e6 2 e

--H m

r o

.o.

/

e oc

. n N

4.4 i W %

vv '

(p' c e o

-5 4" T "*

O I

C2 c I e < e

  • O.2 g

=

.J

.J d.

a...

05

=

=

e a-a e

C' w w >m y.w 42 u c.3

=

7 <,. p

.5.2 0 :-

s s

WJ.. g C

- u m

p7

"=u

.,. c.

a.

  • $.=. x Q,- o

-v H

c Qicc

.g-Ww s -

ag u at' =

7.

o

.o u

C'

3

, w>

R:9c

-'=

s s

s a

=*

Q C

wcwwo w

V v

v.

m I

.C.

u S.'po )

.5-c=

ltratiodtt10 )

gm2 i

c.

a

>4 w

m -. s.

g m

-n 2"

E 3 E 2.=.

I3 Po.)

s y

c.

.c. m.,m:

C (l:3]I %{

==94 4 *1' C a.

^~""'

.n.

7.

H m

s 7

m m

s is 7_

e 3=-

~G=

sC E

d.

O n

a x

C

.m w

m m

=

t-

=

,.n ei.*r.s>l tow yl y

!miinilg

,2

~

-=

  • g pi lw"ll.its

' 2

.~.-i c,-

=

w 3 =- M

. irmr.s}g 7 *!.

6 3

2o

.4.

sk

=.

=-

=

n 9 - u...

uo = ':; i:

=,

((liling [)

o3

--L "c _ 8. A M M3 *! ~-.5 -

"3 troite m([

E3

. c, _.,,.- $

1c..=,.,.,.=

.,o

=s cy.

.,. en -

u :. s..=.

l.3 h.i w :;: 2. %. C < O C i

9 -.

%<mLO$6C" re

==V N

sun me

_.o DU U "3

  1. 2 o

d wm p.

w-y

1 0

Northem States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330 5500 l

September 5, 1985 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report August, 1985 Attached are twelve copies of the Monthly Operating Report for August, 1985 for the Monticello Nuclear Generating Plant.

M M-s David Musolf Manager of Nuclear Suppo Services DMM/MMV/le cc: Regional Administrator-III, NRC NRR Project Manager, hTC NRC Resident Inspector