Special Rept:During 851007-25 Installation of Plant Mod,Fire Detection Instrumentation in Emergency Diesel Generator Rooms a & B Taken Out of Svc.Hourly Fire Watch Patrol Established.Instrumentation Returned to Svc on 851025
ML20136A704
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/08/1985
From: Orser W
PORTLAND GENERAL ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
WSO-656-85, NUDOCS 8511200009
Download: ML20136A704 (1)


Text

/

mGme so z#

r-Portland General Electric Company Trojan Nuclear Plant P.O. Box 439 November 8, 1985 Rainier, Oregon 97048 WS0-656-85 (503) 556-3713 m

ff.

Mr. John B. Martin pn Regional Administrator, Region V E?

e) m$

U.S. Nuclear Regulatory Commission S

N E

1450 Maria Lane, Suite 210 g

Walnut Creek, California 94596-5368

.4

=.

3

Dear Sir:

Limiting Conditions for Operations (LCO) 3.3.3.7 of the Trojan Technical Specifications require that a Special Report be provided if certain fire protection instrumentation become nonfunctional and cannot be returned to functional status within fourteen days.

During installation of a plant modification from October 7, 1985, to October 25, 1985, Fire Detection Instrumentation in the

'A' and 'B' Emergency Diesel Generator Rooms were taken out of service. Upon com-pletion of the modification activities on October 25, 1985, the instru-mentation was restored to a functional status.

During the period that the instrumentation was nonfunctional, an hourly fire watch patrol was established as required.

Sincerel,

/B/

W. S. Orser General Manager Trojan Nuclear Plant c: Mr. Lynn Frank, Director State of Oregon Department of Energy 8511200009 e51108 10 PDR ADOCK 05000344 S