ML20136A592
| ML20136A592 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 12/18/1985 |
| From: | Whittier G Maine Yankee |
| To: | Thadani A, Thadoni A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20136A596 | List: |
| References | |
| 6837L-FWS, GDW-85-315, MN-85-211, NUDOCS 8601020204 | |
| Download: ML20136A592 (1) | |
Text
.
5
\\
=
MAME HARHEE ATOMMPOWER00MPARUe nuousrx$xin"e%
-[,
(207) 623 4521 1
O December 18, 1985 MN-85-211 GDW-85-315 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission j
Washington, D. C.
20555 Attention:
Mr. Ashok Thadani, Director m
PWR Project Directorate #8 J
Division of Licensing i
References:
(a) License No. [PR-36 (Docket No. 50-309) i (b) MYAPCo Letter to USNRC dated June 14, 1985, Cycle 9 j
Technical Specification (P.C. #117) - (MN-85-ll7)
Subject:
Update of Maine Yankee FSAR, Appendix D j
Gentlemen:
--;a Enclosed are thirteen copies of the revised Appendix D to Maine Yankee's
?
Final Safety Analysis Report. It is submitted in accordance with the requirements of 10 CFR 50.71. This report incorporates the cycle specific 2
information of the core performance analysis report for Cycle 9 operation. We previously submitted this same report with Reference (b).
E Please replace the existing Appendix D with the one provided with this submittal.
If you have any questions, do not hesitate to call.
^
Very truly yours, MAINE YANKEE ATOMIC POWER CDhPANY r
M Ah AA/
3 G. D. Whittier, Manager
.g Nuclear Engineering & Licensing GDW/bjp m
Enclosure:
Appendix D to Maine Yankee's Final Safety Analysis Report cc: Dr. Thomas E. Murley h*
-5 f
^
Mr. Cornelius F. Holden w/o enclosure AD - D. CRUTCHFME ( hr Wy)
M PB (W. JOltNSTON)
_d B601020204 851218 IN rlcsNr7,')'
d PDR ADOCK 05000309
\\
ros
<W.
Rf.GAN )
K PDR
=
6837L-FWS a
=
.