ML20136A371
| ML20136A371 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/15/2020 |
| From: | Sterdis A Holtec Decommissioning International |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20136A370 | List: |
| References | |
| Download: ML20136A371 (1) | |
Text
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-20-PIL-034 10 CFR 50.36a Technical Specification 5.6.3 10 CFR 50 Appendix I May 15, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 Docket No. 50-293
Subject:
Annual Radioactive Effluent Release Report for 2019 In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.3, Holtec Decommissioning International, LLC (HDI) is submitting the attached Annual Radioactive Effluent Release Report for January 1, through December 31, 2019.
There are no regulatory commitments in this letter.
Should you have any question or require further information, please contact David Noyes at (508) 830-7826.
Respectfully, Andrea L. Sterdis Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC
Enclosure:
Annual Radioactive Effluent Release Report January 2019 through December 2019 cc:
USNRC Regional Administrator, Region I USNRC Project Manager, NMSS - Pilgrim Nuclear Power Station USNRC Region I, Lead Inspector - Pilgrim Nuclear Power Station Massachusetts Emergency Management Agency (MEMA, Director)
Digitally signed by Andrea L. Sterdis DN: cn=Andrea L. Sterdis, c=US, o=HDI, ou=Holtec Decommissioning International, email=andrea.sterdis@holtec.com Date: 2020.05.15 10:05:16 -04'00' Andrea L.
Sterdis