May 15, 2020 EA-2020-009 Mr. Jacob Clos Quality Assurance Manager Fisher Controls International, LLC 1702 South 12th Avenue Marshalltown, IA 50158
SUBJECT:
FISHER CONTROLS INTERNATIONAL LLC FOLLOW-UP LETTER TO DISPUTED NONCONFORMANCES OF NRC INSPECTION REPORT 99900105/2019-201
Dear Mr. Clos:
This is the follow-up letter to the United States (U.S.) Nuclear Regulatory Commission (NRC) acknowledgement of disputed notices of nonconformances (NON)s identified in Inspection Report (IR) 99900105/2019-201. Specifically, on February, 24, 2020, the NRC acknowledged your letter sent to the NRC, dated February 7, 2020 (Agencywide Documents Access and Management System (ADAMS) No. ML20038A240), in which you disputed the two Notice of Nonconformances (NONs) 99900105/2019-201-01 and 99900105/2019-201-02 as identified in the NRC Inspection Report 99900105/2019-201 (ADAMS Accession No. ML19339F625), dated January 8, 2020. The NONs described examples where Fisher Controls International, LLC (hereafter referred to as Fisher Controls) failed to comply with contractual requirements imposed by NRC licensees for the procurement of Fisher Controls Type 546NS electro-pneumatic transducers in accordance with the applicable standards.
The NRC is completing a detailed review of your responses and the applicable regulatory requirements in accordance with Part I, Section 2.3.7, of the NRC Enforcement Manual.
However, these efforts are not expected to be completed in accordance with the timeline specified in Part I, Section 2.3.7, of the NRC Enforcement Manual. The NRC will inform Fisher Controls as soon as the NRCs evaluation is complete.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room
J. Clos 2 or from the Publicly Available Records System component of the NRC's ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Kerri A. Kavanagh, Chief /RA/
Quality Assurance and Vendor Inspection Branch Division of Reactor Oversight Office of Nuclear Reactor Regulations Docket No.: 99900105 EPID No.: L-2019-201-0064
ML20136A190 via email* NRR-106 OFFICE NRR/DRO/IQVB OE/EB* NRR/DRO/IQVB*
NAME DZhang DJones KKavanagh DATE 05/15/2020 05/15/2020 05/15/2020