ML20136A097

From kanterella
Jump to navigation Jump to search
Submittal of Core Operating Limits Report for Cycle 22
ML20136A097
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/15/2020
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20136A096 List:
References
BW200039
Download: ML20136A097 (1)


Text

ti Braidwood Station 35100 South Suite Braceville, 60407 *9619 May 15, 2020 BW200039 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 2 Renewed Facility Operating License No. NPF-77 NRC Docket No. STN 50-457

Subject:

Core Operating Limits Report, Braidwood Unit 2 Cycle 22 The purpose of this letter is to transmit the Core Operating Limits Report (COLR) for Braidwood Unit 2 Cycle 22 in accordance with Technical Specification 5.6.5, "Core Operating Limits Report (COLR)." Braidwood Unit 2 Cycle 22 COLR, Revision 13 was implemented during Braidwood Unit 2 Refueling Outage 21 in support of Cycle 22 operation. Note that the revision number is based on a numbering convention that continues from the previous revision of the Unit 2 COLR, i.e., Braidwood Unit 2 Cycle 21, Revision 12.

If you have any questions regarding this matter, please contact Mr. Kevin Lueshen, Regulatory Assurance Manager, at (815) 417-2800.

Sincerely, n Keenan Site Vice President Braidwood Station

Attachment:

Core Operating Limits Report (COLR) for Braidwood Unit 2 Cycle 22, Revision 13 cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector- Braidwood Station NRC Project Manager, NRR - Braidwood and Byron Stations