ML20135H911

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/85-21 on 850715-19 & Notice of Violation.Response Should Address Concerns Re Design Adequacy of as-built Configurations Which Do Not Comply W/ Design Changes & Effects Upon Reactor Safety
Date released: 05/28/2020 Download: ML20135H911


Insp Rept 50-298/85-21 on 850715-19.Violation Noted:Failure to Have Design Control Procedures for Engineering Input & for Verification of Completion Closure
ML20135H924
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/28/1985
From: Boardman J, Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
Download: ML20135H924 (9)
Forwards Insp Rept 50-298/85-21 on 850715-19 & Notice of Violation.Response Should Address Concerns Re Design Adequacy of as-built Configurations Which Do Not Comply W/ Design Changes & Effects Upon Reactor Safety
ML20135H910
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/06/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: PILANT J M
NEBRASKA PUBLIC POWER DISTRICT
References
Download: ML20135H910 (2)