ML20135G434

From kanterella
Jump to navigation Jump to search

Corrects Typos Identified in 850319 Application to Amend License NPF-5,changing Tech Specs to Modify Automatic Depressurization Sys Setpoints
ML20135G434
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/13/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
2106N, NED-85-650, TAC-57308, NUDOCS 8509190076
Download: ML20135G434 (1)


Text

-_

- Georgta Power Comparty 333 Pedmont Avenue 4

At!anta, G2orga 30308 Telephone 404 5266526 Maing Address:

Post O*f.ce Box 4545 Atunta, Georg:a 3u302 Georgia Power L T. Gucwa t'ssa hrned&frc!W W" Mr.ager Nuclear Eng neeong an3 Chet Nuc' car Engineer 2106N September 13, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAP, PLANT UNIT 2 CHANGE TO PROPOSED TECHNICAL SPECIFICATION AMENDMENT Gentlemen:

By letter dated March 19,1985 (NED-85-125) Georgia Power Company (GPC) proposed to amend the Hatch Unit 2 Technical Specifications to reflect a modification to the Automatic Depressurization System.

Two typographical errors in that submittal have been identified.

The proposed revision to page 3/4 3-29 incorrectly designates the setpoint of item 4(f) as less than or equal to 130 psig and that of item 4(g) as less than or equal to 105 psig.

GPC wishes to correct the trip setpoint designations.

The setpoints should be designatea as greater than or equal.to 130 psig and greater than or equal to 105 psig, respectively.

GPC regrets causing any inconvenience.

Very truly yours, L. T. Gucwa JH/mb xc:

Mr. H. C. Nix, Jr.

Dr. J. N. Grace (NRC-Region II)

Senior-Resident Inspector J. L. Ledbetter-8509190076 850913 M

ADOCK O 366.

g p

l

'le

. - -