AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-293 UNIT Pilgrim 1 DATE 9/13/85 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 MONTH August 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 665.

17 652.

2 553.

18 642.

3 646.

19 657.

4 662.

20 536.

I 5

664.

21

665, 6

666.

22 663.

7 665.

23 660.

8 666.

24 663.

9 665.

25 662.

10 665.

26 663.

11 665.

27 659.

12

659, 28 654.

13 655.

29 641.

14 650.

30 655.

15 661.

31 515.

16 656.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, 8509180106 850831

^

DR ADOCK 05000293 AY R

PH fW L y

t\\\\

OPERATING DATA REPORT DOCKET NO.

50-293 DATE 9/13/85 00MPLETED BY P. Hamilton TELEPHONE (617)746-7900 OPERATING STATUS 1.

Unit Name Pilgrim i Notes 2.

Reporting Period August 1985 3.

Licensed Thermal Power (MWt) 1998 4.

Nameplate Rating (Gross MWe) 678 5.

Design Electrical Rating (Net MWe) 655 6.

Maximum Dependable Capacity (Gross NWe) 690 7.

Maximum Dependable Capacity (Net MWe) 670 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None 9.

Power Level To Which Restricted, If Any (Net MWe)

None

10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 744.0 5831.0 111575.0
12. Number Of Hours Reactor Was Critical 744.0 5357.5 75274.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0__

5244.3 72812.8

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1451280.0 9700680.0 126652488.0
17. Gross Electrical Energy Generated (MWH) 499680.0 3337510.0 42569724.0
18. Net Electrical Energy Generated (MWH) 481192.0 3211325.0 40908252.0
19. Unit Service Factor 100.0 89.9 65.3
20. Unit Availability Factor 100.0 89.9 65.3
21. Unit Capacity Factor (Using MDC Net) 96.5 82.2_

54.7

22. Unit Capacity Factor (Using DER Net) 98.7 84.1 56.0
23. Unit Forced Outage Rate 0.0 8.8 9.2
24. Shutdowns Scheduled Over Next 6 Months (Vype, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period, Estimeted Date of Startup
26. Units In Test Status (Prior to Commercial Optration):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0ff1ERCIAL OPERATION (9/77) l

REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo, dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1.

The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for next Refueling Shutdown:

September 1986 3.

Scheduled date for restart following refueling: November 1986 4.

Due to their similarity, requests 4, 5, & 6 are responded to collectively under #6:

5.

See #6.

6.

The new fuel, which was loaded during the 1983-84 refueling outage, is of the same P8x8R design, as loaded the previous outage and consists of 160 P80RB282 assemblies. In addition, 32 GE6B-P8DRB282 assemblies were also loaded.

7.

(a) There are 580 fuel assemblies in the core.

(b) There are 1,128 fuel assemblies in the spent fuel pool.

8.

(a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9.

With present spent fuel in storage, the spent fuel pool now has the capacity to acccmmodate an additional 642 fuel assemblies.

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCMET NO. 50-293 Operational Summary for August 1995 The month commenced with the unit at full power.. On the second, power was reduced to perform a condenser backwash. The ~ unit was returned to full power on tb / third and maintained at that level until the twentieth when power was again reduced for a condenser backwash.

~

On the twenty-first, the unit was returned to full power and maintained at that level until the thirty-first when power had to be trimmed in response to heavy seas emusing fouling of the travelling screens.

During the month, periodic slight power level reductions were required at low tide in order to maintain condenser vacuum.

Equipment qualification work remained in progress throughout the month.

Safety Relief Valve Challenges Month of August 1985 Requirement: NUREG-0737 T.A.P.

II.K 3.3 There were no safety relief valve challenges riuring the month.

-.a UNIT SHUTDOWNS AND POWER REDUCTIONS

~ DOCKET NO.

50-293 UNIT NAME Pilgrim 1 DATE 9/13/85 COMPLETED BY P. Hamilton TELEPHONE (617) 746-7900 REPORT MONTH August 1985 l

METHOD OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO.

DATE TYPEI (HOURS) REASON 2 DOWN REACTOR 3 REPORT #

CODE 4 CODES PREVENT RECURRENCE 17 8/31/85 F

O.0 H

5 N/R N/R N/R Reduced power to backwash condenser &

clean travelling screens.

1 2

2 3

4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (EUREG-lO22)

O

p Month August 1985 PILGRIM NUCLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAIN 1ENANCE TO PREVENT ASSOCIATED RECURRENCE LER Secondary Isolation Degraded Aging Replaced gear.

Routine N/R Containment Damper Gear Maintenance (New AO/N 80 Design Dampers on Order)

RPS "A" MG Set Tripped Unknown Investigated and I&C to Analyze N/R Output could not Breaker duplicate problem.

HPCI Oil Line at Cracked Oil Fatigue Replace oil line.

To be determined.

LER 85-023 to Control Valve Line be issued.

HPCI Turbine Ruptured Fatigue Replaced disk.

Engineering eval.

N/R Exhaust of design in Rupture Disk progress.

RCIC Overspeed Key in Under Replace missing Pending N/R Trip Overspeed Trip Investigation piece.

determination Linkage was of cause.

Missing Salt Pump P2088 Low Shut-Off Rag caught Removed rag.

Inspected Service N/R Service Discharye Head in pump Water Bay Water impeller.

Salt Pump P208A Low Shut-Of f Plastic Removed bottle.

Inspected Service N/R Service Discharge Head bottle caught Water Bay Water in impeller.

Main Steam Rad. Monitor Improper Personnel Reset Revised Daily LER 85-021 1705-2B & 2C Setpoint Error Log Sheet (To be issued.)

O

o-4 BOSTON EDISON COMPANY B00 50VLaTON STREET BDaTON, massachusetts 02199 WILLIAM D. HARRtNSTON Se tember 13, 1985 m.............=

BECo Ltr. #85-167 nom Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk License No. DPR-35 Docket No. 50-293

Subject:

August 1985 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted, W. D. Harrington PJH: caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l

f@b L