ML20135F853

From kanterella
Jump to navigation Jump to search
Provides List of Deliveries Made Between 970213 & 0310,IAW Requirements of Convention on Physical Protection of Nuclear Materials
ML20135F853
Person / Time
Site: 07001252
Issue date: 03/10/1997
From: Condrey D
EDLOW INTERNATIONAL CO.
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9703170031
Download: ML20135F853 (1)


Text

-.

w Edlow International Company IMA Connecticut Ave., N.W.. Suite 201 Washington, D C. 20009 U.S.A.

Qg (Q

Tcl(202) 40-4959 Fax (2n2) 4M4840 e nuit: ediowcowaolcorn March 10,1997 Division of Safeguards and Transportation U.S. Nuclear Regulatory Commission Mail Stop: 0-6 F-18 Washington, D.C.

20555 Attn: Ms. Gloria M Bennington Dear Ms. Bennington The following list of deliveries made between February 13.1997 and March 10,1997. This list provided in accordance with the requirements of the Convention on the Physical Protection of Nuclear Materials.

OUR REF#

SHIPMENT DESCRIPTION CONSIGNEE DATE RECEIVED NSC-E-20 25,600 Kgs UF6 (e)

Siemens Power Corp.

2/13/97 BN-OB-9 220,480 Lbs UF6 (n)

Urenco Nederland 2/19/97 BN-OB-10 165,360 Lbs UF6 (n)

Urenco Nederland 3/05/97 BN-OB-11 165,360 Lbs UF6 (n)

Urenco Nederland 3/19/97 We trust that the above information is satisfactory.

Sincerely, EDhOtLINTERNA O.AL COMPANY f

/aren Co y

Operations Man ger (e) = enriched l

(n) = natural l

l I lo 9703170031 970310 j

PDR ADOCK 07001252 Q

c eDn uppsppppp.s