Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review ML20211H9971999-08-27027 August 1999 Forwards Insp Rept 50-423/99-07 on 990614-0715.Violations of NRC Requirements Occurred Re Adequacy of C/As for Organizational Changes & Being Treated as NCVs DD-99-09, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 9908261999-08-26026 August 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 990826 ML20211F5841999-08-23023 August 1999 Discusses Proposed Rev 21 to Northeast Utils Quality Assurance Program TR for NRC Review & Approval,Iaw 10CFR50.54 ML20211D5701999-08-20020 August 1999 Informs That in May 1999,Northeast Nuclear Energy Co, Restarted Millstone Nuclear Power Station,Unit 2.Licensee Has Been Tasked Charter with Listed Specific Responsibilities ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20211C4621999-08-18018 August 1999 Discusses Rev to TS Bases Sections 3/4.5.2 & 3/4.5.3, Emergency Core Cooling Sys Subsystems ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210N4921999-08-0909 August 1999 Ack Receipt of 990331 Electronic Transfer of $88,000 for Civil Penalty,Proposed on 990309.Corrective Actions Will Be Examined During Future Insp ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents ML20210C0751999-07-21021 July 1999 Forwards 990721 Notice of Public Meeting Re post-shutdown Decommissioning Activities Rept ML20210A9681999-07-14014 July 1999 Responds to Re Changes to Millstone Physical Security Plan Identified as Rev 32,submitted Per Provisions of 10CFR50.54(p).No NRC Approval Is Required,Based on Util Determination That Revs Do Not Decrease Plan Effectiveness ML20209E7341999-07-12012 July 1999 Discusses Util Responses to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Responses Acceptable.Info Revised in Reactor Vessel Integrity Database (Rvid) & Is Releasing as Rvid Version 2 ML20209G2921999-07-0909 July 1999 Forwards Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time DD-96-23, Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 9508211999-07-0101 July 1999 Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 950821 ML20196J5031999-06-30030 June 1999 Responds to 990414 Petition,Submitted Per 10CFR2.206 to Nrc. NRC Solicited Support from FEMA to Ensure That Appropriate Response to Enhancements Identified to Offsite EP in Event of Radiological Emergency at Millstone,Developed ML20196J2111999-06-30030 June 1999 Forwards SE Concluding Licensee USI A-46 Implementation Program Meets Purpose & Intent of Criteria in Generic Implementation Procedure for Seismic Verification of NPP Equipment, Rev 2 ML20196J1131999-06-29029 June 1999 Forwards Notice of Receipt & Availability for Comment of Post-Shutdown Decommissioning Activities Rept, Re .Notice Provided for Public Comments to Be Submitted within 30 Days of Notice Date ML20196G9531999-06-24024 June 1999 Discusses Changes Provided by NNECO on 990504 to TS Bases Sections 3/4.7.7 & 3/4.7.8.Returns TS Bases to NNECO to Be Inserted in TS to Ensure That NRC Staff & NNECO Have Identical TS Bases Pages ML20212H9661999-06-21021 June 1999 Confirms 990611 & 14 Telcons with M Selden,In Which Beckman & Assocs,Inc Was Advised to Stop Work Under Mod 4 to Task Order 005,under Contract NRC-03-98-021 ML20212J0751999-06-15015 June 1999 Forwards Notice of Withdrawal of Amend Request for Allowed Outage Time Extensions for Emergency Diesel Generators & Low Pressure Safety Injection Trains of Emergency Core Cooling Sys ML20195K0601999-06-15015 June 1999 Forwards Request for Addl Info Re fire-related IPEEE Analysis,Per GL 88-20 1999-09-30
[Table view] |
Text
. -. __ - . - - . . .. -.
,. .i, March 7, 1997 CAL No.1-97-010 Mr. Bruce D. Kenyon President and Chief Executive Officer Northeast Nuclear Energy Company P.O. Box 128 Waterford, Connecticut 06385-0128
SUBJECT:
CONFIRMATORY ACTION LETTER
Dear Mr. Kenyon:
The purpose of this letter is to confirm your ongoing efforts and commitments to evaluate and correct problems found within the licensed operator training programs at Millstone Units 1,2, and 3, and Haddam Neck. These efforts and commitments were described in a letter dated March 3,1997, from Mr. Jay Thayer, Recovery Officer, Nuclear Engineering and Support Services.
Specifically, NRC administered senior reactor operator (SRO) license examinations to seven
- applicants at Millstone Unit 1 on December 2 - 6, 1996. Grading of the examinations determined that six of the seven applicants failed the examinations. Based on facility assessments of the examinations, Mr. J. Thayer commissioned an independent review of the causes of the examination failures. NRC Examination Report 50-245/96-12, dated February 7,1997, provided the results of the examination to Northeast Utilities and requested that the results of the or. going independent review be submitted to the NRC.
4 Subsequently, your Independent Review Team (IRT) identified severaliratances in which the licensed operator training program at Millstone Unit 1 had not been completed, such that information on the operator license applications (NRC Form 398) may have been inaccurate regarding the applicants' completion of the training program, in response, l Northeast Utilities began a separate review of license training programs at Millstone Units i 1,2, and 3 and Haddam Neck that had been completed over the last few years and l communicated preliminary results of these reviews to the NRC on February 27,1997.
The March 3,1997, letter provided the IRT report regarding the recent Millstone Unit 1 examination failures, the findings regarding training program irregularities including compliance with systems approach to training at all four units, the actions taken for currently licensed operators to compensate for the findings, and commitments for ongoing l evaluations and corrective action plans. Further, the letter stated that, "the NRC Forms 398 (for recent Millstone 1 applicants) were submitted to the NRC based on inaccurate information provided to those signing the forms." The letter withdrew the license applications (Form 398s) for the seven 1996 SRO applicants at Millstone Unit 1.
9703170028 970307 PDR ADOCK 05000213
^
V PDR l'700y 8
@Mapp.UMu lh
Mr. Bruce Kenyon 2 Also, the attachments to the letter provided the details related to efforts at each of the four units to prevent any licensed operator from performing licensed duties until allidentified irregularities in their initiallicense training and qualification have been addressed, and until completion of the training program can be demonstrated.
Further, the attachments to the letter addressed your evaluations regarding licensed operator requalification training and short term corrective actions and concluded that it was appropriate to resume training at Millstone Units 1,2, and 3 and to continue training at Haddam Neck. It is our expectation that facility management will ensure that these corrective actions have been implemented in a manner to enable effective training.
Based on the importance to nuclear safety of thoroughly trained licensed operators, we are confirming your written commitments in the March 3,1997, letter. Specifically, we understand that you will:
- 1. Submit the complete corrective action plan, including a schedule for addressing each of the identified IRT weaknesses and a review of the extent of the problems and root causes for the training area to the NRC staff by April 2,1997. As part of the corrective action plan, clearly define roles and responsibilities for completing NRC Form 398.
- 2. Complete corrective actions for the Millstone Unit 1 LOIT/ LOUT (licensed operator initial / upgrade training) program prior to restarting respective classes.
- 3. Complete corrective actions for the Millstone Unit 2 LOIT program prior to restarting LOIT classes.
- 4. Complete corrective actions for the Millstone Unit 3 LOIT/ LOUT program prior to NRC examinations of the current LOIT/ LOUT class.
- 5. Conduct a thorough review of the Millstone Unit 3 LOIT program against the accredited program requirements prior to submittal of the license applications to the NRC.
- 6. Forward the scope of NRC Form 396 (medical certification) process review and its expected completion date for Millstone Units 1,2, and 3 and the Haddam Neck plant (HNP) by April 2,1997.
- 7. Submit the results of HNP data reviews of LOIT/ LOUT findings to the NRC by April 2,1997.
- 8. Submit the results of initial reviews of additional classes on all the units to the NRC by March 15,1997.
- 9. Complete specific reviews of the HNP LORT (licensed operator requalification training) program by April 4,1997.
Mr. Bruce Kenyon 3 Further, in discussions with Glenn Meyer, NRC, Region I on March 6,1997, Mr. J. Thayer confirmed that the " complete corrective action plan" discussed in item 1 above would address Northeast Utilities' efforts to provide the necessary assurance that the skills and abilities of all currently licensed operators meet f acility standards.
None of these commitments shall preclude you from taking actions as necessary to ensure the health and safety of workers and the public, protect the environment, and comply with applicable regulatory requirements.
Pursuant to Section 182 of the Atomic Energy Act,42 U.S.C. 2232, you are required to:
- 1) Notify us immediately if your understanding differs from that set forth above;
- 2) Notify us if for any reason you cannot complete the actions within the specified schedule and advise us in writing of your modified schedule in advance of the change; and
- 3) Notify us in writing when you have completed the actions addressed in this Confirmatory Action Letter.
Issuance of this Confirmatory Action Letter does not preclude issuance of an order I formalizing the above commitments or requiring other actions on the part of the licensee, nor does it preclude the NRC from taking enforcement action for violations of NRC requirements or other actions as appropriate that may have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
In accordance with 10 CFR 2.790 of the NRC's "Ri.les of Practice," a copy of this letter, and your response will be placed in the NRC Public Document Room (PDR). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction, if personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected i and a redacted copy of your response that deletes such information. If you request '
withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of j withholding (e.g., explain why the disclosure of information will create an unwarranted 1
Mr. Bruce Kenyon 4 invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financialinformation). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely, ORIGINAL SIGNED BY:
Hubert J. Miller Regional Administrator NRC Region i ORIGINAL SIGNED BY: W. LANNING William D. Travers Director Special Projects Office Office of Nuclear Reactor Regulation i
Docket Nos. 50-213, 50-245, 50-336, and 50-423 1
Mr. Brut.e Kenyon 5 cc:
N. S. Carns, Senior Vice President and Chief Nuclear Officer P. Hinnenkamp, Nuclear Unit Director, Unit 1 J. Price, Nuclear Unit Director, Unit 2 M. H. Brothers, Unit 3 Recovery Officer J. McElwain, Unit 1 Recovery Officer M. Bowling, Unit 2 Recovery Officer D. M. Goebel Vice President - Nuclear Oversight J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering and Support F. C. Rothen, Vice President - Work Services
)
J. Stankiewicz, Training Recovery Manager i J. J. LaPlatney, Haddam Neck Unit Director L. M. Cuoco, Senior Nuclear Counsel G. P. van Noordennen, Manager, Nuclear Licensing R. Johannes, Director - Nuclear Training J. F. Smith, Manager, Operator Training W. D. Meinert, Nuclear Engineer, MMWEC J. Egan, Esquire V. Juliano, Waterford Library Department of Public Utilities Control l
S. B. Comley, We The People !
J. M. Block, Attorney for CAN J. P. Brooks, CT Attorney General Office State of Connecticut SLO S. Luxton, Citizens Regulatory Commission Representative T. Concannon, NEAC )
l Distribution.
Region I Docket Room (with concurrences) l L M CM Cr ,
Nuclear Safety information Center (NSIC) l NRC Resident inspector D. Screnci, PAO J. Rogge, DRP M. Conner, DRP C. O'Daniell, DRP W. Axelson, DRA W. Lanning, Deputy Director of Inspections, SPO, NRR M. Kalamon, SPO J. Durr, SPO l J. Lieberman, OE
! D. Holody, OE D. Vito, OE DRS File
4 Mr. Bruce Kenyon 6 Distribution (VIA E-MAIL):
N. Sheehan, Field Public Affairs Officer, RI J. Anderson, PM, SPO, NRR P. McKee, Deputy Director of Licensing, SPO, NRR G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR L. Plisco, Chief, SPO, NRR S. Dembek, PM, SPO, NRR D. Mcdonald, SPM, SPO, NRR R. Frahm, Jr., NRR W. Dean, OEDO S. Weiss, NRR, DRPM, PDND M. Fairtile, PM, NRR R. Jones, NRR M. Callahan, OCA W. Travers, SPO D. Taylor, NRR D. Screnci, PAO, ORA
, inspection Program Branch, NRR (IPAS)
B. Boyer, NRR C. Thomas, NRR S. Richards, NRR i
n 4 DOCUMENT NAME: A:MSCAL.GWM Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N* = No hoy 0FFICE RI/DRS _
RI/DRS . j lW RI / DRP,, _ l NRR/S h l NRW64,1, l NAME GMEYER (f ,j JWIGGINS \\ T WHEHyppr WLANNfNG WTRAi/ERY DATE 03/ ' /97Th bl 03/ 7/97 03/0 7 /97 03/ @ /97 03/06/97 {
\d KO % 'Y
- OFFICE RI/0E ,a RI/W /7 RI/0GC ,/ RI/RA A/l /,,
NAME DHOLODY R'/'I , BLETTX JFEWELl(nl HMILLER '
W 4/
DATE 03/06/97 g (, l 41 03// /97 03/7 /97 03/ 7 /97
NRR/DRCH n l 880GER W >
4
, 03/07/ 97 41 OFFICIAL RECORD COPY gs
'