PMNS20200497, Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 Annual Assessment Meeting

From kanterella
(Redirected from ML20135F834)
Jump to navigation Jump to search
Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 Annual Assessment Meeting
ML20135F834
Person / Time
Issue date: 05/14/2020
From:
NRC/RGN-II
To:
References
PMNS20200497
Download: ML20135F834 (3)


Text

April 29, 2020

Title:

St. Lucie Nuclear Plant Unit 1 & 2 Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 Annual Assessment Meeting Date(s) and Time(s): May 19, 2020, 03:00 PM to 04:00 PM Location: Webinar Category: This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will hold an open forum to discuss the NRCs assessment of safety performance for 2019 at both the St. Lucie Nuclear Plant Unit 1 & 2 and Turkey Point Nuclear Generating Station Unit 3 & 4.

Contact:

Randy Musser 404-997-4603 randy.musser@nrc.gov

Participants:

NRC External Randy Musser, Branch Chief, Region II Florida Power and Light Company Tom Morrissey, St. Lucie Senior Resident Inspector, Region II Steven Roberts, St. Lucie Resident Inspector, Region II Dan Orr, Turkey Point Senior Resident Inspector, Region II Rogerio Reyes, Turkey Point Resident Inspector, Region II URL Meeting Number Password Webinar:

https://skype.nrc.gov/meet/lundy. 301-415-0333 3519083#

pressley/QZSFBDC7?sl=1 Docket No: 05000335 05000389 05000250 05000251 Comments: The St. Lucie annual assessment letter is accessible from the publicly available records (PARS) component of the NRCs document system (ADAMS) (Accession No. ML20063N712).

The Turkey Point annual assessment letter is accessible from the publicly available records (PARS) component of the NRCs document system (ADAMS) (Accession No. ML20063N822).

PUBLIC MEETING AGENDA

St. Lucie Nuclear Plant Unit 1 & 2 Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 Annual Assessment Meeting May 19, 2020, 03:00 PM to 04:00 PM Webinar

The time of the meeting is local to the jurisdiction where the meeting is being held.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

ADAMS Accession Number: ML20135F834 Name Randy Musser Lundy Pressley Adam Wilson Office RII-DRP RII-DRP RII-DRP Date 04/29/2020 04/29/2020 04/29/2020 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20200497 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html