ML20135F795
| ML20135F795 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/12/1997 |
| From: | Kalman G NRC (Affiliation Not Assigned) |
| To: | Beckner W NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9703140122 | |
| Download: ML20135F795 (3) | |
Text
-
MEMORANDUM T0:
William D. Beckner, Director March 12, 1997 Proji:ct Directorate IV-1 i
Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation FROM:
George Kalman, Senior Project Manager ORIGINAL SIGNED BY:
Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation i
SUBJECT:
MEETING WITH ENTERGY OPERATIONS, INC.'TO DISCUSS ARKANSAS NUCLEAR ONE, UNIT-2 (ANO-2) STEAM GENERATOR TUBES.
DATE & TIME:
Tuesday, March 25, 1997 1
l 9:00 am to 11:30 am LOCATION:
Room 0-6-B-11 One White Flint North-11555 Rockville Pike '
Rockville, MD 20852-2738 PURPOSE:
Two tubes were removed for analyses from an AN0-2 steam generator in November 1996. The'results of the tube analyses and tube inspection plans for the next refueling outage will be discussed at the meeting.
- PARTICIPANTS:
NRC/NRR Eliterav Operations. Inc.
- Ted Sullivan Craig Anderson, et. al.
1 Phil. Rush George Kalman, et. al.
Docket No.-50-368-CONTACT:
George Kalman 301-415-1308 cc:
See next page
- Meetings between the NRC technical staff, and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to uttend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48340, dated September 20, 1994.
DISTRIBUTION:
E-Mail Docket File R. Zimmerman (RPZ)
OPA PUBLIC J. Roe (JWR)
PMNS j
PD4-1 r/f E. Adensam (EGA1)
S. Collins (SJC1)
G. Kalman W. Beckner (WDB)
J. Mitchell (JAM) 0 OGC (0-15B18)
C. Hawes'(CMH2)
B. Henderson (BWH)
ACRS E. Jordan (e-mail to JKR)
A. Howell, (ATH)
T. Sullivan (EJS)
P. Rush (PJR1) i f
Document Name: AR232597232597MTR OFC PM/PD4-1 NAME-GK an/vw ECFIEC N B C0Fi' DATE
] //L/97 COPY YES/NO 0FFICIAL RECORD COPY 9703140122 970312 PDR ADOCK 05000368 P
..___m A Ofco g
\\
UNITED STATES s
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001 March 12, 1997 MEMORANDUM T0:
William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation FROM:
George Kalman, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
SUBJECT:
MEETING WITH ENTERGY OPERATIONS, INC. TO DISCUSS ARKANSAS NUCLEAR ONE, UNIT-2 (ANO-2) STEAM GENERATOR TUBES.
DATE & TIME:
Tuesday, March 25, 1997 9:00 am to 11:30 am LOCATION:
Room 0-6-B-11 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 PURPOSE:
Two tubes were removed for analyses from an ANO-2 steam generator in November 1996. The results of the tube analyses and tube inspection plans for the next refueling outage will be discussed at the meeting.
- PARTICIPANTS:
NRC/NRR Enterav Operations. Inc.
Ted Sullivan Craig Anderson, et. al.
Phil Rush George Kalman, et. al.
Docket No. 50-368 4
CONTACT:
George Kalman 301-415-1308 cc: See next page
- Meetings between the NRC technical staff, and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open j
to the Public," 59 Federal Reaister 48340, dated September 20, 1994.
t Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2 cc:
4 Executive Vice President Vice President, Operations Support
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Director, Division of Radiation Wise, Carter, Child & Caraway Control and Emergency Management P. O. Box 651 Arkansas Department of Health Jackson, MS 39205 i
4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Mr. C. Randy Hutchinson Vice President Operations, ANO Entergy Operations, Inc.
Winston & Strawn 1448 S. R. 333 l
1400 L Street, N.W.
Russellville, AR 72801 Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing l
Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 i
Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 4
m