ML20135F708
| ML20135F708 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/07/1997 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20057G438 | List: |
| References | |
| GL-95-05, GL-95-5, NUDOCS 9703130344 | |
| Download: ML20135F708 (1) | |
Text
a Dav3 Morey South:rn Nuclear a
Vce President Oper: ting Compiny f arley Project P.0 Box 1295 a
Birmingham. Alabama 35201 Tel 205 992.5131 March 7, 1997 SOUTHERN h CONLPANY Energy to Serve Your World" Docket No.:
50-364 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant - Unit 2 Steam Generator Tube Voltage-Based Alternate Repair Criteria Data Report Ladies and Gentlemen:
Generic Letter 95-05, " Voltage-Based Repair Criteria for the Repair of Westinghouse Steam Generator Tubes Affected by Outside Diameter Stn:ss Corrosion Cracking," requires the submittal of an associated report within 90 days of the restart following a steam generator inspection. The required report for the Fall 1996 Farley Unit ; inspection is attached.
Per Generic Letter 95-05,3.c.7, use of a smaller hobbin probe during implementation of the alternate repair criteria requires NRC Staff approval. Section 10 of the report provides the required testing for use of the smaller bobtin probe. It is requested that the NRC Staff approve use of the smaller bobbin probe prior to the next Unit 2 outage in the Spring of 1998.
If there are any questions, please advise.
Respectfully submitted,
(/) 3 1+ W Dave Morey REM;90DAYNRC. DOC Attachment cc:
Mr. L. A. Reyes, Region II Administrator
,f Mr. J. I. Zimmerman, NRR Projeu Manager Mr. T. M. Ross, Plant Sr. Resident inspector Dr. D. E. Williarnson, State Department of Public Health
/
130024 9703130344 970307 PDR ADOCK 05000364 l!lU[EfIl[E{E{0!,5kmdk'!.5 P
-