Monthly Operating Rept for Aug 1985
ML20135F666
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/31/1985
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP850069, NUDOCS 8509170351
Download: ML20135F666 (4)


Text

.

q. OPERATING IRTA REPORT DOCKET NO 50-341 UNIT FERMI-2 DATE 09-10-85 COMPLETED BY L.P. Breani TELEPHONE (313) 586-5313 OPERATING STATUS
1. REPORTING PERIOD August GROSS HOURS IN REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 165 MAX DEPEND CAPACITY (MWeNet)

DESIGN ELECTRICAL RATING (We Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS M0hTH YR TO DATE CUMULATIVE 1268.3 1268.3

5. NUMBER OF HOURS REACTOR WAS CRITICAL 517.0 0 0 0
6. REACIOR RESERVE SHUTDOWN HOURS O 0 0
7. HOURS GENERATOR ON LINE 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS 34,711 62,498 62,498
9. GROSS THERMAL ENERGY CENERATED (MWH)
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) 0, 0 0
12. REACTOR SERVICE FACTOR N//A N/A N/A
13. REACTOR AVAILABILITY FACTOR f//A N/A N/A
14. UNIT SERVICE FACTOR h/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 610NTHS (TYPE, DATE, AND DURATION OF EACH)

Outage for scheduled modifications September / October, 1985

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A- ,
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06-20-85 06-21-85 INITIAL ELECIRICITY 09-15-85 COMMERCIAL OPERATION 11-04-85 A
  • To be determined. $]Og e5083 1V N PDR b i __ . - - _ . _ . . - . _ _ ._ ___ . __ . . _ _ _ ._

C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI-2 DATE 09-10 535 '

COMPLETED BY L.P. Bregni TELEPHONE (313) 586- 5313 MONTH August, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 17 0 1

0 18 0 2

0 19 0 3

0 20 0 4

0 21 0 5

0 22 0 6

0 23 0 7

0. 24 0 8

0 25 0 9

0 26 0 10 0 27 0 11 0 28 0 12 0 29 0 13 0 30 0 14 0 0 15 33 0

16 i

I f

DOCKET NO, 50-341 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FERi4I-2 '.

~

DATE 10-09-85 COMPLETED BY L.P. Bregni .

REj' ORT MONTH August, 1985 TELEPHONE (313) 586 5313 l- l Mad! 8i  !

l l

l i

M oma a !, a csg !.

R!^ESA8=sMI nl-a mo ,

mn cs!.

mme 40

, l

NO DATE l 5 'l $8l C*l @ES$E l CORRECTIVE ACTIONS / COMMENTS l

l 0" l ~* l l 09 "o?:  ;  ;

i  ;

. i i i i.. . .

e i a

850724 i

l S l 227.02 l 8 l 1 l Maintenance outage July 24, 1985 - l ,

! 1 l l l l l l August 10, 1985. l l l i i , ,

e i 3 e i 4 0 I I I 8 8 l l l l l l l l l l

! l  ! l .

8 8 I

I I

i 1 I g

3 4 8 I 4 8 I 8 I 8 9 3

4 4 8 8 0 I I i, 8, ,

. . . . . 3 4

I I 4 0 e

8 8 0 t I I I g 8 8 8 8 9 8 4 3 8 8 8 8 9 I I e 8 0 8 8 8 I 4 5 8

e I 4 8

. .i . , e 0 8 8 8 I 8 1

l l l l l l l l . . . I ,

. . I I e

8 0 8 5 8 I 1 4 I I f e

4 8 8 I I I I 8 8 3

5 8

8 8

I , , . 0 I .

(1) REASONS E. OPERATOR TRAINING AND LICENSE EXAMINATION A. EQUIPMENT FAILURE (EXPLAIN)

B. MAINT OR TEST F. ADMINISTRATIVE REFUELING G. OPERATIONAL ERx0.. (EXPLAIN)

C.

H. OTHER (EXPLAIN)

D. REGULATORY RESTRICTION (2) METHOD

3. AUTOMATIC SCRAM
1. MANUAL OTHER (EXPLAIN)

~

4.

2. MANUAL SCRAM

Robert S. Lenart 3'* Plant MJnsger Fermk2 6400 North Dixie Nghway ISOn (Newport.M<hgan48166 313)58 *

  • September 10, 1985 Nuclear operations NP850069

~

d U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Monthly Operating Status Report for August. 1985 Enclosed for your information and use is the Fermi 2 i Monthly Operating Status Report for August, 1985. This report inc lud e s the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely, j

4 SL R. S. Lenart Plant Manager Enclosure cc: Mr. P. M. Byron USNRC, Document Control Deck Mr. M. D. Lynch Washington, D.C. 20555 Regional Administrator Mr. Dennis Hahn USNRC Region III Division of Radiological Health 799 Roosevelt Road Michigan Department of Health Glen Ellyn, IL 60137 3500 North Logan P.O. Box 30033 Lansing, MI 48909 Mr. Jon Eckert Monroe Office of Civil Preparedness 965 South Raisinville Road