D p* "c,y?
o UNIT E D STATES J
o
- 9
.,t NUCLEAR REGULATORY COMMISSION f. ki I $
R EGloN IV
? '
611 RYAN PLAZA DRIVE, SUITE 400 s 9.....[
i
)
l l
Mr. C. L. Terry TU Electric Group Vice President, Nuclear ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, Texas 76043
SUBJECT:
COMANCHE PEAK EMERGENCY PLAN REVISION
Dear Mr. Terry:
This refers to the meeting conducted in the Region IV office on December 4,1996. This meeting was a working level exchange concerning Revision 25 to the Comanche Peak Emergency Plan (see Enclosure 1), and addressed the overall staffing of the emergency response organization and the duties and responsibilities of the individual responders. is a mark-up of the working papers used during the meeting.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
i Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
/
T omas P.
, Director ivision of Reactor Safety
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation i
cc w/o enclosures:
Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 9612130164 961211 PDR ADOCK 05000445 F
4
/
TU Electric Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 George L. Edgar, Esq.
Morgan, Lewis & Bockius 1800 M. Street, NW Washington, D.C. 20036 G. R. Bynog, Program Manager /
Chief Inspector Texas Department of Licensing & Regulation Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson County Judge P.O. Box 851 Glen Rose, Texas 76043 Texas Radiation Control Program Director 1100 West 49th Street Austin, Texas 78756 Susan Rieff, Director Environmental Policy Office of the Governor P.O. Box 12428 Austin, Texas 78711 l
l l
[
i 4
?
TU Electric l E Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS) bec to DMB (IE35) w/ enclosures bec distrib. by RIV w/ enclosures:
L. J. Callan Resident inspector (2)
DRP Director DRS-PSB l
Branch Chief (DRP/A)
MIS System Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10) i i
DOCUMENT NAME: G:\\DRSLTRS\\CPMTG96. SUM To receive copy of document, indicate in box: "C" = Copy without enclos, pres "E" = Copy with enclosures "N" = No copy SEPA:PSB E
C:PSB
_l D:DRS G
l l
GMGood:cg (,.Q y BMurray \\l TPGwynn p]
12tJ/96 12S/96 12/[(/96 OFFICIAL RECORD COPY 130005
t
/*
TU Electric :
l E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS) bec to DMB (IE35) w/ enclosures bec distrib, by RIV w/ enclosures:
L. J. Callan Resident inspector (2)
DRP Director DRS-PSB i
Branch Chief (DRP/A)
MIS System Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: G:\\DRSLTRS\\CPMTG96. SUM To receive copy of document, indicate in box: "C" = Copy without enclospres "E" = Copy with enclosures "N" = No copy SEPA:PSB E
C:PSB D:DRS V
GMGood:cg (3 y BMurray Xj TPGwynn $
12ty/96 12S/96 12/'(/96
~
OFFICIAL 9ECORD COPY
ENCLOSURE 1 i
l MEETING: COMANCHE PEAK STEAM ELECTRIC STATION
SUBJECT:
Emergency Plan, Revision 25 I
DATE: December 4,1996 i
ATTENDANCE LIST l
(PLEASE PRINT CLEARLY) l NAME ORGANIZATION POSITION TITLE Gail Good NRC Senior Emergency l
Preparedness Analyst Norman Hood TU Electric Manager, Emergency l
Planning Roger Walker TU Electric Manager, Regulatory Aff airs Connie Wilkerson TU Electric Senior Licensing Engineer l
e A-s-
n
~
l l
ENCLOSURE 2 4
LICENSEE PRESENTATION l
. _.. ~.
.m
.m-.
.m..
m
.~..
.,e O
CPSES/EP IABLE 1.1 STAFflNG REQUIREKNIS FOR EERGEhCIES Page 1 of 2
' Additions Position Title Within Min.
Functtonal Area Iask
=L><>w On Shift g
70 be YM 24
@ Mon EI 2 3 Station Operation Assessment of Operational Aspects Shif t Manager (SRO) 1 12 lhiit Supervisor (SRO)
Reactor W ators (RO)
.2 04 MR 7eMe G.\\-2 Auxiliary Operators i 3 i
imergency Direction and Dar te and todtol
- Shift Manager (SRO)**
1*
1 24 Control onl.\\t e m rge m atY JA *S.
Cmitunication Notifygtatior rsonnel and C.R Comunicator cp)*
/)
10 a d SO, d**d intain connunications BC. CoYu '.M'4
_c Coe r
Station System Engineering Technical Support Shift Technical Advisor lh Engineers 1
3
'f?' iy;;c nt I
/#sleI
/
1 Radiological Assessment Station Surveys R P. Technician Diemistry/ Radiochemistry Chem. *. E - - Technician 1
1 Offsite Surveys R.P. Technicians 6 gg to Onsite Surveys RP lechnicians h e h h. @
l Ex acmno Von 4*Mmed)
Sr
- >1
Sy sEg n,w y
h' System Corrective Actions hi7maYoniro b nic h
1 Electrician P
1 g
1&C Technician b
Auxiliary Operator la 1
Protective Actions Radiation Protection RP Technician 2*
~ ' -' ?
D a Access Control b.
Personnel Munitoring l
c tbsinetry
%h Revision 24 Aprii 19. I'/M s.
.. m o-x
________m2.__.m--ar_-m._,--s.---v-.w~.-w
_._-m.
.___._...m
....--.m m_..
~
e.
a-
. t !
I f
t CPSES/EP TABLE 1.1 STAffIE REQUIRE!iNIS FOR LEIEN[lES Page 2 of 2 Additions Position Title Wityh Min.
functional Area Tast or Expertise On Shift m
70 c"
Fire Fighting Vs Veco's Fire Brigade 5*
Local 13
)
p.J p,a Support
/
_A P.o b
Rescue Operations and First Aid W
- dti *^ vires f,c,b Q gf
(
Site Access Control and Security.
f Personnel Accountability Ccnsnunications. personnel Security Per Security toca
~5 accountability Officers Plan 44H*t
-M-
_ Omvt
/
r
-tf-10
[
May te provided by on-shif t or augnentation personnel assityied other functions.
Shift Manager serves in this capacity until relieved by a designated individual (Section 1.2.3.1).
24
.{
G Revision 24 Apr i i 19. 19%
- - - - ~.
-~
- -.. ~. -
-. -... ~
C.e d y E b
+ /. l GRAl1D IKlGNC7 i ON RESPONSE 85
]
o.
%kCTcdle
/.c9 e g ;
"*9e 1 f3 tHIG NCY AC110N N0ilflCATION Of ALERfg
)
LEVEL UN'J5UAL EVENT 611E ARE A LHIGNCJ GENERAL EMERGENCY tevel of On Duty Personnel On-duty Per'.onnel On-Duty Personnel Activation local Agency Support TSC Activated ISC Activated OSC Activated OSC Activated f unc tional Gi i 2 i ^ c '~Nu s 10F Activated tSC Act m!-J -
10 Area News Center Activated Utfsite Sucoort Station Shif1 Manager Shift Manager Shift Manager 24 l
Ooerations Control Room Personnel Control Roum Personnel Control Roum Personnel Overall Direction Shif t Manager (as TSC Manager (as E0I Manager (as 24 and Control Ememency Coonfinator)
Ememency Coordinator)
Emergency Coordinator)
Cormniscations Control Room N m d -
ISC A' he '%> ; tic.m-wd..J:.eGruunications Coonlinator i
Co 4 wbe
.m m
%r&Mec ggg 3 es,-g g_ [7 ;
SM Security Security Shift Suoervisor E 55 t; " :. om N T i d h M Security Coordinator (E0f) 11 i
Radiation Sh-f t N.eg,
ISC Onsite Radiological Radiation Protectiori 24 i
Protection M Radiation Assessnent Coordinator Coordinator (E0f) 10 Proteciton lechnicians Technical Support Shift Technical Advisor r,y --m y 7_-gsg g;r --.y g;;er_t 1
ISC Engineering Team 6 0=6 9 l
7
-Tst +4F-Emineerim Team ew8.dtse Goi.bssyoperd o l
mu
,o g % u.ed, 8h_ m' r-d 't=
fmergency Repair
";d ut iv.
OSC Manager 05C Nanager j
T = C T ee b c.4.
oicct i u., Lim u cu and Damaae Contro fire fluhtim h eim.
1.;d 27c1s 6..cc; 6 t = r.'S & ir kc.tces
,h ^- 1;ca; i ;d Min, Mr ices-24 l
Public Infonnation Shtft Manager tt-- ~", M ; m "-
Coppany Spokesperson 24 l
T.x.(N anoe<
ftBFt-10 Logistics Shift Manager I
ISC AdenerC** *nk)
C- = ced tdc
) Logistical Support Coordinator 24 (EOF)
%6,9 )
C 4
Revision 24 4ril 12.19%
1
......- e..
=-- -.
--. -a
~
TABLE 1.1 STAFFING REQUIREMENTS FOR EMERGENCIES PAGE I OF 2 FUNCTIONAL TASK NOUE ALERT SAE or GE i
i AREA On-shift Personnel On-shift Personnel On-shift Personnel
%[dM$?5fhy; Levelof Acu,vanon
~9 i%$M[ F "Nng$J, Local Agency.iupport TSC Activated TSC Activated
%#%V 3$pWn OSC Activated OSC Activated
- dMM$$ypMjh.'
- ylv$% mz Local Agency Support EOF Activated l
.,f
&;f/ hun J w News Center
~<
eg %gg -
Activated WW,f:ddggg
+w&il% n%w Offs.ite Support 9%4 4;%g n Station Assessment of Control Room Personnel Same as NOUE Same as NOUE Operations Operational Aspects (See FSAR Section 13.1.2.3 and FSAR Table 13.1-2 for minimum staffing)
Emergency Direction and control of Shift Manager TSC Manager EOF Manager Direction and onsite emergency (as Emergency (as Emergency (as Emergency Control activities Coordi::ator)
Coordinatori Coordinator)
Communications Notify station. local.
Control Room TSC Communications EOF state, and federal Communicator (2)*
Coordinator Communications Coordinator personnel and maintain TSC ENS Communicator communications (May be supplemented by Control Room personnel-ENS)
Security Site Access Control and Security Shift Supervisor S.une as NOCE EOF Security Coordinator Personnel Accountability Security Officers Security OfScers (Per Security Plan)
(Per Security Plan)
NOUE Notification of Unusual Event SAE-Site Area Emergency GE-General Emergency May be provided by onshift personnel assigned other functions.
REVISION 25 Numbers in ( ) indicate number of individuals staffed October 1,1996
TABLE 1.1 STAFFING REQUIREMENTS FOR EMERGENCIES PAGE 2 OF 2 FUNCTIONAL TASK NOUE ALERT SAE OR GE AREA Radiological Station Survey R.P. Technician (1)
R.P. Technician (1)
Same as Alen Assessment Chem / Radiochemistry Chemistry Technician (1)
Chemistry Technician (1)
Same as Alen Onsite Surveys R.P. Technician (1)
R.P. Technician (1)
Same as Alen Offsite Surveys R.P. Technician (1)
Vehicle Driver (1)
Dose Assessment Shift Technical Advisor EOF Dose Assessor (1)
Same as ALERT Coordination / Control Shift Manager TSC Onsite Radiological EOF Radiation Assessment Coordinator Protection Coordinator Station System Coordination / Control TSC Engineering Team Same as ALERT
~
Engineering Coordinator Technical Suppon Shift Technical Avisor TSC Engineering Team Same as ALERT (3)
System Emergency Repair and Auxiliary Operators (per OSC Manager Same as ALERT Corrective Damage Control (ERDC)
FSAR) i Action Mechanic (1)
Mechanic (1)
Electrician (1)
Electrician (1)
I&C Technician (1)
I&C Technician (IT Fire and Fire fighting. Rescue.
Fire Brigade (5)*
Same as NOUE Same as NOUE Medical and First Aid Public Approve release of public Shift Manager TSC Manager Company information information Spokesperson Logistics Obtain/ Expedite needed Shift Manager TSC Communications EOF Logistical resources for the ERO Coordinator Suppon Coordinator i
i i
1 1
NOUE-Notification of Unusual Event SAE-Site Area Emergency GE-General Emergenev May be provided by onshift personnel assigned other functions.
Numbers in ( ) indicate number of individuals staff ed.
p$1510N 25 October 1,1996
TABLE 1.2 PREDETERMINED RESPONSE ACTIONS PAGE 1 0F 1 PREDETERMINED RESPONSE ACTIONS NOUE ALERT SAE GE Notify state and local authorities within 15 X
X X
X minutes of declaring the event.
Notify the Nuclear Regulatory Commission X
X X
X (NRC) immediately after notification of the state and local authorities but not later than one (1) hour after declaring the event.
Staff and activate the Emergency Response X
X X
i Facilities:
Tecnnical Support Center (TSC)
Operations Support Center (OSC)
Emergency Operations Facility (EOF)
Activate the Emergency Response Data System X
X X
(EROS) as soon as possible but not later than one (1) hcur after declaring the event.
Assess the event and responc accordingly.
X X
X X
Dispatch Onsite Survey Teams.
X X
X Dispatch Offsite Monitoring Teams.
X X
Provide period 1c plant status updates to X
X X
X offsite authorities.
Provide periodic assessments of X
X X
meteorological conditions to offsite authorities.
Provice periccic mecia cnefings.
X X
Provide sen1or onsite tecnnical and X
X i
management staff available for consultation with NRC and state on periodic basis.
Provide release rate and dose projection X
X X
information.
Escalate to mere severe class. if X
X X
appropriate.
Closecut the event with verDal summary to X
X, X,
X
{
2 2
offsite authorities folicwed by written summary.
2 Notification Message Form used to closecut the emergency may be used to satisfy the requirements of vercal notification and written summary to offsite agencies.
NCUE Nctif1 cation of Unusual Event SAE Site Area Emergency GE General Emergency Revision 25 Octcber 1. 1996
CPSES CONTROLROOM r................
TECHNICAL SUPPORT CENTER (IF ACTIVATED)
OPERATIONS SUPPORT amm e
OF ACTIVATED)
EMERGENCYOPERATIONS FACluTY o
m n
n o
o (IF ACTIVATED)
- "p
' j l
LOGISTI ' SUPPORT 1UE TRIC (IF CTIV ED)
/
/
c.....,
l lKAD l
SOW WELL TEXAS FEDERAL Eh m GENCY ENERGENCY TEXAS y
DEPARTMENT OTI G OPERATIONS DEPARTMENT DEPARTPENT EERGENCY PRIVATE l
OPERATIONS RE N TORY O.
OFPUBUC MANAGEMENT RNTER
&NTER NNN DUlGY SUPPORT SAFETY AGENCY l
(IF ACTIVATED)
(IF ACTIVATED)
ORGANIZATION Temporary interfaces pending activation of ERFs.
FOCD SOMERVELL D S N Prescribed interfaces for Emergency Situations COUNTY COUmY 0-SFERFF SHERIFF Ehm GENCY MANAGEMENT COMANCHE PEAK STEAM ELECTRIC STATION EMERGENCY PLAN SOMERVEU.
ttXD COUNTY OlllER FUNCTIONALINTERFACES OF GENERAL VOLLNTEER STATE HOSPITAL FIRE AGENCIES 2r THEINTEGRATED EMERGENCY DEPARTMENT REVISION At' RESPONSEORGANIZATION sepys %,,,oe Ne be-o f, 8%
FIGURE 1.1
.. -. -......-.- -.~.-.-
-~ =. -..
I
\\
CPSES CONTROL ROOM r
i I
TECHNICAL SUPPORT CENTER (IF ACTIVATED)
OPERATIONS i
SUPPORT CENTER l
EMERGENCY OPERATIONS FACILITY (IF ACTIVATED) i
(!F ACTIVATED) i i
.t HOOD COUNTY SOMERVELL TEXAS FEDERAL OTHER EMERGENCY i
COUNTY TEXAS i
NUCLEAR DEPARTMENT OPERATIONS i
OPERAllONS DEPARTMENT i
REGULATORY OF DNWENT R@c PRIVATE CENIER i
CENTER OF HEALTil COMMISSION ENERGY
^"^
T (IF ACTIVATED) i (tF ACTIVATED) j SAFETY AGENCY ORGANIZATION i
Temporary interfaces pending activation of ERFs.
Prescribed interfaces for Emergency Situations.
TEXAS HOOD SOMERVEL L DIVISION COUNTY COUNTY OF SHERIFF SHERIFF EMERGENCY MANAGEMENT COMANCHE PEAK STEAM ELECTRIC STATION l
S pytt nooo OTHER GENERAL VOLUNTEEH STATE OF THE INTEGRATED.
HOSR TAL FIRE AGENCIES EMERGENCY RESPONSE DEPARTMENT i
ORGANIZATION t
REVISION 25 i
OCTOBER 01,1996 FIGURE 1.1 I
r I
r FROM FIGURE 1., TECilNICAL i
SUPPORT CENTER
- 1. _ _
EMERGENCY COORDINATOR Reverts to position of Shift Manager upon activation of Technical Support Center CONTROL ROOM UNIT SilliT TECIINICAL OPERATIONS 1.((*{W(
COMMUNICATORS SUPERVISOR ADVISOR ADVISOR (This position is activated P"E" C"Oh at an ALERT or higher)
REACTOR OPERATORS CEv's los 25'
-REVISION-24~
YN6)
- hi!hNC-AUXILIARY COM ANCilE PEAK OPERATORS STEAM ELECTRIC STATION EMERGENCY PLAN EMERGENCY ORGANIZATION SillFT M ANAGER HRl DE EMERGENCY COORDINATOR FIGURE IW, @
g.................................................................)
i FROM FIGURE 1.3, i
i TECHNICAL i
i SUPPORT CENTER i
- s.................................................................:
EMERGENCY COORDINATOR Reverts to position of Shift Manager upon activation of Technical Support Center I
GO TO CONTROL ROOM UNIT SHIFT TECHNICAL OPERATIONS FIGURE 1.3
"" ^
COMMUNICATORS SUPERVISOR ADVISOR ADVISOR SUPPORT CENTER (This position is (operations activated at an ALERT coordinator)
REACTOR or higher)
OPERATORS COMANCHE PEAK STEAM ELECTRIC STATION AUXILIARY EMERGENCY PLAN OPERATORS EMERGENCY ORGANIZATION SHIFT MANAGER AS FIRE EMERGENCY COORDINATOR REVISION 25 BRIGADE OCTOBER 01,1996 FIGURE 1.2
EMERGENCY COORDINATOR (Assumes position of Technical Support Center Manager after Ernergency Operations Facility is activated)
\\
N
/
\\
N
/
\\
\\
TSCONSITE
\\E TSC E
g RADIOLOGICAL SE ITY MAINT E
OPERATKNS ENGINEERING EEN AD TOR COORDNATOR TEAM to E'1 d-[bo}-
COORONATOR c.co
/
/
N c,o-Dr ENGINEERING I
, p,- t 1-%
TEAM COMMUNICATORS
/
\\
FIGU 1.7 FIG 1.7, OPERA ONS OPE JS FIGURE IT, i
S T
commL COMANCHE PEAK CEMER N
STEAM ELECTRIC STATION
/
EMERGENCY PLAN EMERGENCYORGANIZATION (TECHNICAL SUPPORT CENTER MANAGER AS EMERGENCY
- w. vision COORDMTOR) espTsussn as. sooo-Oc.To8 EE o1,IS %
FIGURE 1g 3
EMERGENCY COORDINATOR (Assumes position of Technical Support Center Manager after Emergency Operations Facility is activated)
TSC ONSITE TSC TSC RADIOLOGICAL TSC OPERATIONS ENGINEERING ASSESSMENT COMMUNICATIONS COORDINATOR TEAM COORDINATOR COORDINATOR COORDINATOR i
ENGINEERING g
COMMUNICATORS OPERATIONS TEAM SUPPORT CENTER F GUR COMANCHE PEAK L
ROOM STEAM ELECTRIC STATION EMERGENCY PLAN EMERGENCY ORGANIZATION (TECHNICAL SUPPORT CENTER MANAGER AS EMERGENCY COORDINATOR)
REVISION 25 OCTOBER 01,1996 FIGURE 1.3
FRJM FROM FI R
.6 FIGURE 1..
S?fh}*N I
TE i (Onsite Radiological I
TECHNICAL I
" ' " " " " " " ' ~ '
T Assessment Coordinator)
SUPPORT Coordinator) i gg
/
l O. S. C.
MANAGER i
(_
OSC RADIATION OSC CHEMISTRY SUPERVISOR OSCfviAINTENANCE-PROTECTION SUPERVISOR
-R-C--R-A-DIREGTOR-E. R. D. C. SUPERVISOR CSC ONSITE SUP.VEY CHEMISTRY E.R.D.C.
i Tr um ninr crno TECHNICIANS TEAMS L%d "itF"tWCW2' '
(
1 f
x
)
S
/
)
(
FIRST AlD
]
~
t AND RESCUE
\\
)
3
/
i i
RADIATION PROTECTION COMANCHE PEAK W
TECHNICIANS
)
STEAM ELECTRIC STATION EMERGENCY PLAN
(
(
\\ [
)
EMERGENCYORGANIZATION VEHICLE DR ERS, 4
x;-
OPERATIONS FIELD T A SUPPORT
[8 CENTER
/
oe:rt> set et, t9%
FIGURE 1.X Q
. ~ =. -....... -. -
- - ~.. - -.
-.. ~... -. - = ~ - ~ -... -. - -. =.. - -...... -.
o
. o r
t i
GOTO FIGURE 1.3 1 TECHNICAL (OperallOnS SUPPORT COOrdinatOf)
CENTER i
e O.S.C.
MANAGER j
l i
i-O.S.C. RADIATION O.S.C. CHEMISTRY O.S.C.
PROTECTION SUPERVISOR SUPERVISOR E.R.D.C. SUPERVISOR t
i LEAD RP CHEMISTRY E.R.D.C TECHNICIAN TECHNICIANS TEAMS t
RADIATION FIRST AfD
~
PROTECTION AND RESCUE TECHNICIANS i
COMANCHE PEAK STEAM ELECTRIC STATION EMERGENCY PLAN EMERGENCY ORGANIZATION I
i OPERATIONS SUPPORT REVISION 25 OCTOBER 01,1996 FIGURE 1.4 i
=
EMERGENCY COORDINATOR (Assumes position of Emergency Operations Facility Manager prior to facility activation)
~
s i
LOGISTICAL LOCAL EERG.
SUPPORT OPERATIONS SECURITY COMPANY RADIATION Et E
COMMljNICATIONS COORDtMTOR CE?UER COORDINATOR SPOKESPERSON PROTECTION SU T
COORDNATOR ADVISORS COORDrMTOR INA
/'.
r
\\ 7/
OFFSITE RAD.
ASSESSMENT' JG COMMUNICAT COORDNATOR T
00T0 to T
GOTO 3 FIGURE 1X
/
\\
' FIGU 1.10, FIGURE 1.K l
l m
L T. S. C.
M OFFSITE DOE l
f ASSESSMENT PERSONNEL 2
MVW f
4sPTemesn-ee, :::: _
f ocrogge oggg,
/
i, I
I OFFSITE d
l
_1 im t u'*~* 3 1 3
m MONITORING j COMANCHE PEAK G A d.)
% oose c ooed.* M TEAMS 7
STEAM ELECTRIC STATION coora: d ac q
4 DinECTOR EMERGENCY PLAN s
l EMERGENCYORGANIZATION OFFSITE (EMERGENCYOPERATIONS FACILITY MONITORING MANAGER AS EWRGENCY TEAMS COORDINATOR) 5 FIGURE If
~.. -. -. -. -. _ -. - -
1 EMERGENCY COORDINATOR i
(Assumes position of Emergency Operations Facility Manager prior to facility activation) i t
AO OP TIONS SECURITY COMPANY COMMUNICATIONS U P RT p
O CENTER COORDINATOR SPOKESPERSOt4
' " ^
COORDINATOR COORDINATOR t
ADVISORS i
OFFSITE RAD.
ASSESSMENT COMMUNICATORS COORDINATOR i
GO TO l
GO TO FIGURE 1.6, l
FIGURE 1.3, T.S.C CENTER DOSE ASSESSMENT PERSONNEL OFFSITE i
MONITORING TEAMS MANPOWER PROCUREMENT CONTRACTS STEAM ELECTRIC STATION COORDINATOR C ORDINATOR COORDINATOR i
EMERGENCY PLAN OFFSITE MONITORING TEAMS EMERGENCY ORGANIZATION (EMERGENCY OPERATIONS FACILITY MANAGER AS EMERGENCY COORDINATOR) i OCTOBER 01,1996 FIGURE 1.5
- , e FHOM FIGURE 1.
I EMEFKBCY I (COMPANY OPERATIONS SPOKESPERSON)
FACILITY i-NEWS RELEASE NEWSCONFERENCE INFORMATION l
WRITER MANAGER COORDINATOR
- 4--
-A
~
4
\\
/
\\ /
C INFORMATION RUMORCONTROL WORD NG LIAISON OOORDNATOR
\\
/
\\
^
s
/
\\
/
ER E.O.F.
ONE ASSI Y
NEWSCENTER RUMORCONTHOL BRIEFER AIDES
?T NEWSCENTER E keItA- ' MEDIA!"'"GE REVISION)[
AIDE AfD
""3
. AUGUST-61;-1989-oc-racee o,m n n
AUDIO VISUAL MEDIA MONITORING AIDES COMANCHE PEAK NDE STEAM ELECTRIC STATION EMERGENCY PLAN EMERGENCYORGANIZATION FIGURE 1X.- _.
l
M.
.i GO TO FIGURE 1.5 I
EMERGENCY (COMPANY I
i OPERATIONS SPOKESPERSON)
FACILITY I
l NEWS RELEASE NEWS CONFERENCE INFORMATION WRITER MANAGER COORDINATOR I
I INFORMATION RUMOR CONTROL LIAISON COORDINATOR
.l i
i l
NEWS CENTER RUMOR CONTROL i
BRIEFER AIDES NEWS CENTER ELECTRONIC MEDIA AIDE MONITORING AIDES COMANCHE PEAK STEAM ELECTRIC STATION i
EMERGENCY PLAN AUDIO-VISUAL MEDIA AIDE MONITORING AIDES EMERGENCY.
ORGANIZATION NEWS CENTER REVISION 25 l
OCTOBER 01,1996 FIGURE 1.6
. _ _. - - - - _ _. _ _ _. _ _ -_ _ _.., _ _ _. _ _ _ _ _ _ _., - _ _. _ _ _... ~, - -. -
NRC REGIONAL NRC jdGj2{Q
)
INCIDENT OPERATIONS
' DEPARTMENT BUREAU OF llOOD OF PilHLIC RADIATION
RESPONSE
CENTER I
COUNIY A
TELEPilONE l
- SAFETY, CONTROL' CENTER E.O.C~
WACO AUSTIN
..O..F..F..S..I.T..E..................................................................,...,,,,,,,,,,,,,,,
B TWO-WAY RADIO ONSITE A
i STATECOUNTY DEDICATEDSYSTEM
{
A D
A A
SOMERVELL A
.i COUNIY i
E.O C-EMERGENCY NOTIF-G C
C
( C i/
D ICATION SYSTEM
[
OPERATIONS H
c' 6
SUPPORT G
^
A SOUND-POWERED CENTER B
C g
TELEPilONE SYSTEM l
p OFFSITE G
O i
SUPPORT PLANT PAGE-PARTY J
TECIINICAL SERVICES AND. F SYSTEM /ALL PAGE SUPPORT
^
PERSONNEL FF DUTY CENTER y
i g
TELECOPIER
[
E C
j CONTROL A
y G
l POINT-TO POINT ROOM J
F F
A TELEPilONE C
CORPORATE B
B G
B gg IIEALTil PilYSICS i
NETWORK A
A G
A A
[
l t
LOGISTICAL EMERGENCY ONSITE AND j
L SUPPORT OPERATIONS SECURITY INPLANT
[
CENTER FACILITY l
TEAMS STEAM ELECTRIC STATION
.i i
TECllNICAL SUPPORT CEffl'ER COMMUNICATIONS INTERFACES Jargary 31, 1992 Revision 13 g:igure 4.2 t
) T, TABLE 4.1 COMMUNICATIONS INTERFACES Page1of1 i
i Control Technical Operations Emergency News Security Room Support Support Operations Center 4
Center Center Facility i
~
Control Room A,C,D,E.
A B,F,G A,B,C,D.
AG A, F F, G F, G 4
l Techmcal Support Cemer A.C,D,E, A,B,F G A,B,C,D, A, G A, F j
F, G F. G Operations Support Center-lA,B,F.G lA,B.FG A,B,F,G A, F
^
Emergency Operations Facility A B,C,D, A,B,C,D, A,B,F,G A, G A, F u n s tr;w m a l A. G l A. G A. G News Center 4
{
Security l A, F l A, F A, F A, F
%@ NRC Regional Incident Resp C:r l A, D, O l A. D, G A.D,G l NRC Operations Center l A. D, G l A, D, G A,D.G Dept of Public Safety, Waco l A, C, G l A, C. G A,C,G A Bureau of Radiation Control, l AG A, G A j Austin l Hood County EOC l A. C, G lAC,G A,C G A A, B j Somervell County EOC l A, C, G lA,CG A.C,G A A, B 1 Offsite Support Agencies and A A A A Off4uty personnel A, F l f fA l Access Control 4 i Onsite/Inplant Survey Teams l lB,EF B, F Offsite Monitoring Teams l l A, B A, B 1 i System Dispatcher l A. H l Corporate Security l l A A l lAG A. O TU Electric Divisions i s s Uninvolved Govern =ent Officials l A Offsite Support Contractors l l A l INPO and Other Utilities. l l A. G A. G I I 1 A . Telephone E Sound-Powered Telephone B Two-way radio F Plant Page Party Syte=/All-Page j C State / County Dedicated System G Telecopier D Federal Telephone System H Point-to-point Note: Thas table shows communication interfaces between organi:stions which normally com=unicate wid one anoder. If no communication is expected between organizations, then no interface is shown. Revision 25 October 1,1996 4 -+N y-q e4-- + w - ,,#.-1}}