--y--
Drrster 6,1995
Elaine Charlsen
Associate Provost
University of Missouri
114 Jesse Hall
Columbia, MO 65211
50-186/96001(DNMS)
ROUTINE SAFETY INSPECTION REPORT NOS.
SUBJECT:
AND 030-32695/96002(DNMS)
Dear Ms. Charlsen:
4-8, 1996, at the
This refers to the inspection conducted on November
The purpose of the
University of Missouri at Columbia Research Reactor. inspect
At the conclusion
conducted safely and in accordance with NRC requirements
staff identified in the enclosed report.
Within
Areas examined during the inspection are identified in the report.
d
these areas, the inspection consisted of selective examinations of proce ure
f
and representative records, interviews with personnel, and observations o
activities in progress.
Your conduct of activities at the University of Missouri at Columbia Re
Reactor was characterized by safety conscious reactor operations, sound
engineering and well established maintenance practices.
No cited violations were identified during this inspection.
In accordance with 10 CFR 2.790 of the NRC's " R
Sincerely,
Original Signed by
Cynthia D. Pederson, Director
Division of Nuclear Materials Safety
Docket Nos. 50-186
030-32695
License Nos. R-103
24-00513-39
Enclosure:
Inspection Report
Nos. 50-186/96001(DNMS);
030-32695/96002(DNHS)
i
See Attached Distribution
6
i
I
I
9612130118 961206
ADOCK 03032695
C
..
y
.
4.y
D&mber 6,1996
Elaine Charlsen
Associate Provost
University of Missouri
114 Jesse Hall
Columbia, MO 65211
SUBJECT:
ROUTINE SAFETY INSPECTION REPORT NOS. 50-186/96001(DNMS)
AND 030-32695/96002(DNMS)
Dear Ms. Charlsen:
This refers to the inspection conducted on November 4-8, 1996, at the
University of Missouri at Columbia Research Reactor. The purpose of the
inspection was to determine whether activities authorized by the license were
conducted safely and in accordance with NRC requirements.
At the conclusion
of the inspection, the findings were discussed with those members of your
staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations of
activities in progress.
Your conduct of activities at the University of Missouri at Columbia Research
Reactor was characterized by safety conscious reactor operations, sound
engineering and well established maintenance practices.
No cited violations were identified during this inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Sincerely,
Original Signed by
Cynthia D. Pederson, Directer
Division of Nuclear Materials Safety
Docket Nos.
50-186
'
030-32695
License Nos. R-103
l
24-00513-39
Enclosure:
Inspection Report
Nos. 50-186/96001(DNMS);
030-32695/96002(DNMS)
h[h
See Attached Distribution
9612130118 961206
ADOCK 03032695
I
I
C
1
_
_ - _ _ _ _ _
. _ _
l
.
.
a
t
.
h
E. Charlsen
-2-
Distribution
cc w/ enc 1:
W. Vernetson, Director of Nuclear Facilities
John Ernst, Health Physics Manager
C. McKibben, Acting Facility Director
Missouri University Research Reactor
Research Park, Research Reactor
Columbia, M0 65211
bec w/ enc 1: PUBLIC (IE06)
DOCUMENT NAME:
R:\\lNSPRPTS\\N0NP0WER\\UM096001.DNM
SEE PREVIOUS CONCURRENCES
p. . .
, . , . . . ~ _. , . . . . . . .
w. -c . c.,, .. . -. .. -. f i c . c.,, .. . . . ...f
.
-
0FFICE
RIII
RIII
RIII
SJII
h
b
ersof [
'urgessL/@f
NAME
Reidinger:ib
Cameron
Shear
Burdick
Phillips
DATE
12/ /96
12/ /96
12/ /96
12/[/96
i
0FFICIAL RECORD COPY
gcYO
.
._
. _ . . .
..
.
_._
_ .
- _ . _
.
__
._.
. _ _ _ _ _ __
i
-
,-
,
E. Charlsen
-2-
i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
i'
this letter and its enclosure will be placed in the NRC Public Document Room.
.
Sincerely,
Cynthia D. Pederson, Director
,
Division of Nuclear Materials Safety
'
Docket Nos.
50-186
030-32695
License Nos. R-103
24-00513-39
Enclosure:
Inspection Report
Nos. 50-186/96001(DNMS);
030-32695/96002(DNMS)
cc w/ enc 1:
W. Vernetson, Director of Nuclear Facilities
John Ernst, Health Physics Manager
C. McKibben, Acting Facility Director
4
Missouri University Research Reactor
Research Park, Research Reactor
Columbia, M0 65211
bec w/ encl: PUBLIC (IE06)
,
DOCUMENT NAME:
R:\\lNSPRPTS\\NONP0WER\\UM096001.DNM
g , .. .
, ., sm i.
. . . . .. . sm. 6
c - c.,, . ism
.
f i
- c.,, .iin .it
/ i
-
0FFICE
RIII
% RIII
E
RIII
RIII
,
IN[
Shear N
Pederson
NAME
Reidinger-d
C
Burdick
Phillips
DATE
12/ 2L/96
12/7/96
12/3/96
12/ /96
0FFICIAL RECORD COPY