Forwards Special Rept Detailing Cause of Radiation Monitor Inoperability,Actions Taken & Plans to Restore Channel to Operable Status
ML20135F325
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/04/1997
From: Tulon T
COMMONWEALTH EDISON CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20135F328 List:
References
NUDOCS 9703120066
Download: ML20135F325 (1)


Text

l Commonwealth Eden Compan)

. firaidwood Generaung 5tation

, Route al. ikix 84

  • liraccVille.11. 60 an%% l9 Tel 815-4 58-280 i March 4,1997 Mr. A. B. Beach Regional Administrator U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, IL 60532-4351

Subject:

Braidwoud Station Unit i Special Report due to Radiation Monitor inoperability Docket No. 50-456 ,

References:

NUREG-1276, Technical Specifications.

Braidwood Station. Unit Nos. I and 2

Dear Mr. Beach:

Specification 3.3.3.6 of the reference requires that a specified number of accident monitoring instrumentation channels shall be operable. Action c. of specification 3.3.3.6 requires that in the event the minimum number of channels for the wide range noble gas monitor (WRGM) are not operable for greater than 7 days Commonwealth Edison Company (Comed) must submit a Special Report to the Nuclear Regulatory Commission pursuant to Specification 6.9.2 of the reference. On March 3,1997, the 7 days were exceeded. The purpose of this letter is to provide the Special Report detailir.g the cause ofinoperability, the actions taken, and the plans to restore the channel to operable status.

The enclosure addresses an instance of the Braidwood Unit i Auxihary Building Vent Stack Wide Range Gas Monitor being removed for a planned calibration for greater than 7 days. The 7-day Limiting Condition of Operation (LCO) was exceeded at 0759 hours0.00878 days <br />0.211 hours <br />0.00125 weeks <br />2.887995e-4 months <br /> on March 3 during the performance of the Technical Specification required 18-month calibration surveillance.

I'!casc direct any questions regarding this submittal to Patricia Boyle. Braidwood Station Regulatory Assurance (815)458-2801, extension 2519, TM.~ uTon

/tation Manager

- Braidwood Station

/

TTr ovehrem doc j }

Enclosure 1 cc: NRC Document Control Desk, Washington, D. C. )

C. J. Phillips Senior Resident inspector - Braidwood /p O],

120014

. F. Dick, Jr., Braidwood Project Manager NRR /

9703120066 970304 PDR ADOCK 05000456

@5\,%EkI!h,N. . .

A l'nicom Compan)