Submits Specific Commitments Re Making Procedure Changes as Compensatory Measures for Boraflex Degradation in Spent Fuel Storage Pool Water
ML20135F322
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 02/27/1997
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703120062
Download: ML20135F322 (2)


Text

Commonwealth Iktnon Company tiraidwood Generating Nation E

b Route 01, flox 81 Ilraceville, H. 60 W7 9619 Tel 81%658-2801 February 27,1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001

Subject:

Status of Procedures Changes in regard to Boron Credit in the Spent Fuel Pool Byron Nuclear Power Station, Units 1 and 2 Facility Operating Licceses NPF 37 and NPF-66 NRC Docket Nos. 50-454 and 50-455 4

Braidwood Nuclear Power Station, Units I and 2 Facility Operating Liceses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457

Reference:

H.G. Stanley (Comed) to Document Control Desk (NRC) letter requesting approval of an Interim Boron Credit Technical Specification Ladies and Gentlemen:

Pursuant to Title 10, Code of Federal Regulations, Part 50, Section 90 (10 CFR 50.90), Commonwealth Edison Company (Comed) proposed to amend Appendix A, Technical Specifications for Facility Operating Licenses NPF-37 and NPF-66 for Byron Nuclear Power Station Units I and 2, and Facility Operating Licenses NPF-72 and NPF-77 for Braidwood Nuclear Power Station Units 1 and 2.

In the reference letter, Comed proposed to revise Technical Specification (TS) 3.9.11, 5.6.1.1 and 6.9.1.10 to take credit for soluble boron in the spent fuel storage pool water in maintaining an acceptable margin of subenticality, in Attachment A of the amendment request, Comed committed to making procedure changes as compensatory measures for Boraflex degradation in the spent fuel storage pool water. The specific commitments were as follows:

1.

Appropriate procedures will be changed to reflect the requirement to maintain a minimum of 2000 ppm soluble boron in the SFP.

3.

SFP level loss procedure will be revised to clearly state that non-borated emergency makeup sources must be used only as a last resort.

4.

In addition, station surveillances for monitoring of the SFP parameters will be performed with

{O sufficient periodicity to allow for prompt corrective actions to preclude a SFP dilution accident.

The procedures changes related to the above commitments have been completed at Byron and Braidwood Stations. Please direct any questions to Patricia A. Boyle at (815)458 2801 extension 2519.

/

9703120062 970227 '

PDR ADOCK 05000454i P

PDR; ohnfidaitevpcorrespil99797017. doc A (!nicom Company a a * * * -

L

a. s Document Control Desk Page 2 Very truly yours, Tulon v

tation Manager -

Braidwood Generating Station cc:

A. B. Beach, Regional Administrator - Rlli G. F. Dick, Jr., Braidwood Project Manager - NRR C. Phillips, Senior Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS l

1 l

i 1

I i

a:konfidaitevp correspil99797017. doc t

m.

r. _.,

~

.