Forwards Insp Rept 99901306/96-01 on 960909-12 & 1028-31 & Notice of Nonconformance
ML20135E592
Person / Time
Issue date: 12/04/1996
From: Gallo R
NRC (Affiliation Not Assigned)
To: Barnoski M
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20135E595 List:
References
REF-QA-99901306 NUDOCS 9612110356
Download: ML20135E592 (3)


Text

.. ..

l pa ne p* k UNITED STATES l

< o NUCLEAR REGULATORY COMMISSION f WASHINGTON, D.C. 2055W1

%] ***** December 4, 1996 l

Michael F. Barnoski .

President, Nuclear Operations ABB-Combustion Engineering -

. 2000 Day Hill Road  !

Windsor, CT 06095-0500

SUBJECT:

NRC INSPECTION REPORT 99901306/96-01

Dear Mr. Barnoski:

On October 31, 1996, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your ABB-Combustion Engineering facility. The enclosed report presents the results of that inspection.

The inspection was conducted to ascertain s .ific attributes and implementation of your quality assurance p*ogram, and whether licensees effectively monitored your control of qua, y for safety-related ,

instrumentation and control (I&C) systems and associated spare parts purchased '

by licensees for nuclear power plants. We assessed your commercial-grade i

dedicatior: activities, screening of issues for Part 21 applicability, and your monitoring of the control of quality by your subvendors, i During this inspection, the NRC inspectors determined that the implementation of your quality assurance program did not meet certain NRC requirements i imposed on you by your customers. Specifically, you failed to implement ynur documented QA instructions to consider licensee findings concerning the l quality performance of your subvendor, as. required by 10 CFR Part 50, Appendix B.

This nonconformance is cited in the enclosed Notice of Nonconformance (NON),

and the circumstances surrounding it are described in detail in the enclosed report. Please respond to the nonconformance and follow the instructions specified in the enclosed NON when preparing your response.

In addition, the inspectors determined that licensee monitoring of your quality assurance program for I&C systems and components was not always adequate. Licensees did not monitor your review of subvendor commercial-grade dedication activities and.your screening of issues for Part 21 applicability.

i Gb (j] - l ) , =f

\

9612110356 961204 (Hwh0 PDR GA999 ENVC-E pg,' ./4y 1

99901306 PDR .

i' NRC FR.E CENTER CRM h)il W it  !

. . l M. Barnoski )

l l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of 1 this letter and its enclosures will be placed in the NRC's Public Document Room.

Sincerely, Original sigred by:

Robert M. Gallo, Chief Special Inspection Branch Division of Inspection and Support Programs Office of Nuclear Reactor Regulation Docket No. 99901306

Enclosures:

1. Notice of Nonconformance
2. Inspection Report 99901306/96-01 cc: See next page Distribution PSIB R/F JTWiggins, RI MFields, NRR Central Files AFGibson, RII RCroteau, NRR PUBLIC GEGrant, RIII CPatel, NRR Docket Files TPGwynn, Region IV DOCUMENT NAME: G:\GAUTAM\ABB.CE j D To receive a copy of thM document, indicate in the box: "C" = Copy without enclosures *E" = Co'p y with)enbres "N" = No copy 0FFICE PSI 5?!%KC l HICB:DRCH lE PSIBy:QMP l E /S11MtilSP l $- l NAME ASG'autam: smp FGee F5rf, GCC$illina RMGallo DATE 11/20/96 11/Jo/96 11/ 17 /96 131V/96 0FFICIAL RECORD COPY

cc:

Mr. Ronald Fitzgerald Director, Quality Assurance ABB-Combustion Engineering 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Michael P. Lilley Manager, Quality Assurance Rochester Gas & Electric Corporation 89 East Avenue Rochester, NY 14649 Mr. Richard H. Fassler Supervisor, Quality Assurance Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Mr. Wallace Woodard Principal Engineer, Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Robert Ripley Audit Team Leader Union Electric Company 1901 Chouteau Avenue P.O. Box 149 St. Louis, M0 63166 Mr. Ronald Casavant Technical Specialist Washington Public Power Supply System P.O. Box 968 i Richland, WA 99352 l

Mr. James Young Section Leader Arizona Public Service Company l P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Derek Mercurio Licensing Southern Califo sia Edison Company 2244 Walnut Grove Avende Rosemead, CA 91770 Mr. Joel Rachal Procurement Engineer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995